Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LR-N990022, Discusses Evaluation of part-length CRDM Housing Weld Crack of Prairie Island,Unit 2.Conclusions in WCAP-15126 Support Return to Normal Plant Operation & Normal RCS Leakage Monitoring + (ML18106B038)
- 05000311/LER-1998-016, :on 981219,ECCS Leakage Was Outside of Design Value.Caused by Leakage Past Seat of 21RH34 Manual Drain. Valve 21RH34 Was Reseated.With + (ML18106B040)
- LR-N990049, Provides Revised TS Bases Pages for Units 1 & 2 Tech Specs. Bases Section Affected 3/4.1.2,boration Sys.Revised Bases Pages Reviewed Through 10CFR50.59 Process + (ML18106B041)
- ML18106B042 + (ML18106B042)
- ML18106B043 + (ML18106B043)
- ML18106B044 + (ML18106B044)
- PNO-I-99-008, on 990203,determined That Computer Sys Supporting Overhead Annunciators in CR Had Malfunctioned. Mishap Occurred During Preventive Maint on Annunciator Computer Sys,Which Involves Two Computer Processors + (ML18106B046)
- ML18106B047 + (ML18106B047)
- 05000311/LER-1998-007, :on 980730,reactor Coolant Instrument Line through-wall Leak Was Noted.Caused by Transgranular Stress Corrosion Cracking.Replaced Affected Tubing.With + (ML18106B049)
- LR-N990056, Application for Amends to Licenses DPR-70 & DPR-75,revising Max Permissible Enrichment of Stored New Fuel Described in TS Section 5.6.1.1.Rept Entitled, Criticality Analysis of Salem Units 1 & 2 Fresh Fuel Racks, Encl + (ML18106B050)
- NL-18-0506, Failure to Observe the Certificate of Compliance Condition of the 8-120B Cask Pre-Shipment Leak Test + (ML18106B051)
- ML18106B052 + (ML18106B052)
- ML18106B053 + (ML18106B053)
- ML18106B054 + (ML18106B054)
- ML18106B055 + (ML18106B055)
- LR-N99-0081, Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With + (ML18106B056)
- LR-N99-0080, Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With + (ML18106B057)
- LR-N990055, Revises 981019 Request to Change QA Program for Hope Creek & Salem Generating Stations,In Response to NRC 981218 Rrai. Details Re Revised Proposal & Responses to NRC Questions, Including Proposed UFSAR Changes for Plants Encl + (ML18106B058)
- LR-N980155, Forwards Addl Rev to SR 4.8.1.1.2.f & Change to Definition of Standby Conditions Proposed in 960925 Submittal Re EDG Testing + (ML18106B059)
- ML18106B060 + (ML18106B060)
- ML18106B061 + (ML18106B061)
- LR-N990069, Application for Amends to Licenses DPR-70 & DPR-75, Respectively.Proposed Amend Modifies ECCS Subsystems Surveillance Requirement 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing + (ML18106B062)
- ML18106B063 + (ML18106B063)
- ML18106B064 + (ML18106B064)
- ML18106B065 + (ML18106B065)
- ML18106B067 + (ML18106B067)
- IR 05000272/1998012 + (ML18106B068)
- 05000311/LER-1998-015-01, :on 981208,inadvertent Discharge Through RHR Relief Valve During Startup Was Noted.Caused by Operator Performing Too Many Tasks Simultaneously.Appropriate Actions Have Been Taken IAW Policies & Procedures.With + (ML18106B070)
- LR-N990085, Documents Changes Agreed to Between Util & NRC Re Request for License Amend Re Auxiliary Bldg Ventilation.Attachment 1 Contains Revised LCO Submitted in + (ML18106B071)
- ML18106B073 + (ML18106B073)
- ML18106B074 + (ML18106B074)
- PNO-I-99-010, on 990228,Unit 1 Reactor Automatically Tripped, Due to Main Turbine Trip That Resulted from Rapid Loss of Lube Oil Pressure.Plant Equipment Operators Adjusting Isolation Valve of Main Turbine Lube Oil Cooler + (ML18106B076)
- ML18106B077 + (ML18106B077)
- LR-N990039, Forwards Response to RAI & Changes to Differential Pressure Acceptance Criteria CR Emergency Air Conditioning Sys,Dtd 990107.Revised TS mark-ups,also Encl + (ML18106B078)
- ML18106B079 + (ML18106B079)
- ML18106B080 + (ML18106B080)
- LR-N990073, Forwards fitness-for-duty Performance Data Rept for Six Month Period Ending 981231.Without,encl + (ML18106B081)
- ML18106B083 + (ML18106B083)
- ML18106B084 + (ML18106B084)
- ML18106B085 + (ML18106B085)
- ML18106B086 + (ML18106B086)
- LR-N990078, Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1998, IAW TS 6.9.1.8.Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Plant + (ML18106B087)
- ML18106B088 + (ML18106B088)
- ML18106B089 + (ML18106B089)
- ML18106B090 + (ML18106B090)
- ML18106B093 + (ML18106B093)
- IR 05000272/1998301 + (ML18106B094)
- LR-N990127, Provides Clarification of Design & Fabrication Code Requirements & post-installation Test Requirements for Salem Outage Equipment Hatch,As Described in License Amends 217 & 199 + (ML18106B095)
- ML18106B096 + (ML18106B096)
- ML18106B098 + (ML18106B098)
- ML18106B099 + (ML18106B099)