Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18102B404 + (ML18102B404)
- ML18102B405 + (ML18102B405)
- ML18102B406 + (ML18102B406)
- ML18102B407 + (ML18102B407)
- LR-N970334, Submits Revised Supplement to Relief Request for Alternatives to Welding Restrictions in 1989 Edition of ASME Code for Station Service Water Pumps,Per 970423 Telcon Request + (ML18102B408)
- ML18102B413 + (ML18102B413)
- ML18102B416 + (ML18102B416)
- ML18102B417 + (ML18102B417)
- ML18102B418 + (ML18102B418)
- 05000272/LER-1997-009, :on 970418,determined That Past Operation of ECCS Was Outside of Plant Design Basis.Caused by Failure to Address All Accident Scenarios Affecting Assumptions Made. Issued New NPSH Calculation Re RHR Pumps + (ML18102B421)
- ML18102B422 + (ML18102B422)
- LR-N970371, Responds to NRC Re Violations Noted in Insp Rept 50-311/97-06 on 970301-0412.Corrective Actions:Personnel Involved Were Held Accountable for Actions IAW Disciplinary Policy & Procedure NC.DE-AP.ZZ-0012(Q) Was Replaced + (ML18102B423)
- LR-N970418, Special Rept 97-01:on 970615,radiation Monitoring Sys Channel 1R15 Was Inoperable for More than Seven Days.Caused by Configuration of Plant.Required Operational Surveillances Will Be Completed on 2R15 & Channel Restored + (ML18102B424)
- LR-N970402, Responds to NRC Re Violations Noted in Insp Repts 50-272/97-05 & 50-311/97-05 on 970207-0328.Corrective Actions:Safety Evaluation for Separation Distance of Cables in Free Air Installed in Limited Hazard Areas Was Approved + (ML18102B425)
- LR-N970399, Requests Agreement That Facility Is Ready for Restart & Confirmatory Action Ltr of 950609 Be Appropriately Modified + (ML18102B426)
- ML18102B427 + (ML18102B427)
- ML18102B429 + (ML18102B429)
- CNL-18-054, Supplement to License Amendment Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report + (ML18102B430)
- ML18102B431 + (ML18102B431)
- ML18102B432 + (ML18102B432)
- IR 05000272/1997013 + (ML18102B434)
- ML18102B435 + (ML18102B435)
- LR-N970390, Comment Opposing NUREG-1606, Proposed Regulatory Guidance Re Implementation of 10CFR50.59 (Changes,Tests or Experiments). Util Endorses Comments Submitted by Nuclear Energy Inst + (ML18102B436)
- 05000272/LER-1996-008-02, :on 960613,failure to Meet TS Requirements While in Mode 5 for Natural Circulation Was Noted.Caused by Insufficient Technical Input for Development of Controls. Revised Plant Operating Logs for Mode 5 + (ML18102B437)
- ML18102B440 + (ML18102B440)
- ML18102B443 + (ML18102B443)
- IR 05000272/1997008 + (ML18102B444)
- GNRO-2018/00013, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) + (ML18102B445)
- ML18102B446 + (ML18102B446)
- ML18102B447 + (ML18102B447)
- ML18102B451 + (ML18102B451)
- LR-N970442, Monthly Operating Rept for June 1997 for Salem Unit 1 + (ML18102B452)
- LR-N970443, Monthly Operating Rept for June 1997 for Salem Unit 2 + (ML18102B453)
- LR-N970439, Submits Annual Fuel Clad Temp Rept,Describing Changes to Calculated PCT for Plant Large & Small Break LOCA Analyses + (ML18102B454)
- LR-N970449, Forwards Supplemental Response to Violations Noted in Insp Rept 50-311/97-06.Corrective Actions:Ar 970320247 Issued to Evaluate White Chalky Film Observed on Coil + (ML18102B455)
- LR-N970453, Informs That Commitment to Evaluate & Identify Improvements to TS Tracking Action Log Has Been Revised to Be Implemented by 970815.Commitment in Response to Violations Noted in Insp Repts 50-272/97-07 & 50-311/97-07 + (ML18102B456)
- ML18102B458 + (ML18102B458)
- LR-N970471, Submits Supplemental Info for Exigent Request for Change to TS Chilled Water Sys Re Auxiliary Bldg Subsystem + (ML18102B459)
- ML18102B460 + (ML18102B460)
- 05000311/LER-1997-007-01, :on 970623,TS 4.0.5 ISI Requirement to Perform Radiography of Check Valves 2CC195 & 2CC210 Every 92 Days Determined to Have Been Missed.Caused by Personnel Error. Check Valves Subsequently Tested + (ML18102B461)
- ML18102B462 + (ML18102B462)
- ML18102B464 + (ML18102B464)
- ML18102B465 + (ML18102B465)
- LR-N970462, Responds to 970610 RAI Re GL 95-07, Presssure Locking & Thermal Binding of Safety Related Power Operated Gate Valves + (ML18102B467)
- 05000272/LER-1997-005-02, :on 970625,radioactive Liquid Effluent Samples Were Not Analyzed within Required Surveillance Interval. Caused by Incorrect Interpretation of TS Sr.Training Will Be Provided to Chemistry Supervisors + (ML18102B468)
- LR-N970469, Forwards 120-day Response to GL 97-01, Degradation of Control Rod Mechanism Nozzle & Other Vessel Closure Head Penetrations + (ML18102B472)
- LR-N970440, Responds to NRC Re Violations Noted in Insp Repts 50-272/97-12 & 50-311/97-12.Corrective Actions:Issued Required Reading Matl Re Mgt Expectations to Personnel, Corrected Identified Deficiencies & Disciplined Personnel + (ML18102B473)
- 05000272/LER-1997-007-02, :on 970630,failure to Perform Independent Verification for Radioactive Release Lineup as Required by TS 3.3.3.8,noted.Caused by Personnel Error.Cr Supervisor Was Held Accountable for Actions + (ML18102B475)
- ML18102B477 + (ML18102B477)
- IR 05000272/1997010 + (ML18102B479)
- ML18102B482 + (ML18102B482)