Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000272/LER-1990-007-01, :on 900321,found Tech Spec Surveillance for Containment Spray Not Performed Historically.Root Cause of Event Attributed to Past Inadequate Administrative Controls. Administrative Procedure Revised + (ML18094B425)
- ML18094B426 + (ML18094B426)
- ML18094B427 + (ML18094B427)
- ML18094B428 + (ML18094B428)
- ML18094B430 + (ML18094B430)
- ML18094B431 + (ML18094B431)
- ML18094B432 + (ML18094B432)
- ML18094B433 + (ML18094B433)
- ML18094B434 + (ML18094B434)
- 05000272/LER-1990-008-01, :on 900327,controlled Shutdown Commenced,Per Tech Spec Action Statement Due to Inoperability of Safeguards Equipment Controls Cabinet 1A.Caused by Equipment Failure.Spare Chassis Installed + (ML18094B435)
- ML18094B436 + (ML18094B436)
- ML18094B437 + (ML18094B437)
- ML18094B438 + (ML18094B438)
- ML18094B439 + (ML18094B439)
- ML18094B441 + (ML18094B441)
- 05000272/LER-1990-009-01, :on 900328,main Steamline Isolation Signal Actuated During Performance of Channel I Main Steamline Flow Calibr.Caused by Inadequate Procedure.Main Steamline Flow Detector Calibr Procedure Revised + (ML18094B443)
- ML18094B444 + (ML18094B444)
- ML18094B445 + (ML18094B445)
- ML18094B446 + (ML18094B446)
- 05000272/LER-1990-010-01, :on 900403,reactor Trip Signal Initiated Due to lo-lo Level in Steam Generator 12.Caused by Personnel Error. Event Reviewed by Operations Dept Mgt & Personnel Involved Held Accountable + (ML18094B447)
- ML18094B448 + (ML18094B448)
- 05000272/LER-1990-011-01, :on 900406,turbine Trip & Feedwater Isolation Actuation Occurred on Steam Generator 14 hi-hi Level. Caused by Equipment Failure.Valve Stem on Valve 12TB10 Polished & Adjusted + (ML18094B450)
- 05000272/LER-1990-012-01, :on 900409,reactor Trip on Steam Generator 12 lo-lo Level Occurred.Caused by Equipment Failure.Steam Generator 12 Governor Valve Linkage Repaired + (ML18094B451)
- ML18094B452 + (ML18094B452)
- ML18094B453 + (ML18094B453)
- ML18094B454 + (ML18094B454)
- ML18095A005 + (ML18095A005)
- 05000316/LER-1978-101, Forwards LER 78-101/01T-0 + (ML18095A006)
- ML18095A007 + (ML18095A007)
- ML18095A010 + (ML18095A010)
- ML18095A011 + (ML18095A011)
- ML18095A012 + (ML18095A012)
- IR 05000354/2018301 + (ML18095A013)
- ML18095A014 + (ML18095A014)
- ML18095A017 + (ML18095A017)
- PMNS20180433, Honeywell Metropolis Workslicensee Performance Review Meeting + (ML18095A022)
- BSEP 18-0047, Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test + (ML18095A026)
- ML18095A029 + (ML18095A029)
- ML18095A033 + (ML18095A033)
- ML18095A037 + (ML18095A037)
- PMNS20180444, Louisiana Energy Services (Les), LLC (D.B.A Urenco Usa)Licensee Performance Review Meeting + (ML18095A038)
- ML18095A039 + (ML18095A039)
- LR-N18-0041, Annual Property Insurance Status Report + (ML18095A046)
- LR-N18-0042, Guarantees of Payment of Deferred Premiums + (ML18095A047)
- ML18095A048 + (ML18095A048)
- ML18095A050 + (ML18095A050)
- ML18095A053 + (ML18095A053)
- ML18095A054 + (ML18095A054)
- ML18095A056 + (ML18095A056)
- L-2018-068, Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations + (ML18095A057)
- ML18095A058 + (ML18095A058)