TMI-18-044, Transmittal of Radiological Emergency Plans; EP-AA-1009, Revision 28, EP-TM-1000, Revision 0 and EP-AA-1000, Revision 29

From kanterella
(Redirected from ML18095A058)
Jump to navigation Jump to search
Transmittal of Radiological Emergency Plans; EP-AA-1009, Revision 28, EP-TM-1000, Revision 0 and EP-AA-1000, Revision 29
ML18095A058
Person / Time
Site: Three Mile Island  Constellation icon.png
Issue date: 03/29/2018
From: David Helker
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML18095A048 List:
References
TMI-18-044 EP-AA-1000, Rev. 29, EP-AA-1009, Rev. 28, EP-TM-1000, Rev. 0
Download: ML18095A058 (2)


Text

,;.

Exelon Generation 200 Exelon Way Kennett Square. PA 19348 www.exeloncorp.com 10 CFR 50.54(q)(5) 10 CFR 50.4 10 CFR 72.44(f)

TMl-18-044 March 29, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289 Three Mile Island Nuclear Station, Unit 2 Facility Possession-Only License No. DPR-73 NRC Docket No. 50-320

Subject:

Exelon Generation Company Radiological Emergency Plan Revision In accordance with 10 CFR 50.4(b)(5), "Emergency Plan and related submissions," Exelon Generation Company, LLC (EGC) is submitting the Emergency Plan revisions for Three Mile Island (TMI) Nuclear Station as listed in the table below.

Procedure No. Title Exelon Nuclear Radiological Emergency Plan EP-AA-1009 28 Annex for Three Mile Island TM/ Station Three Mile Island (TM/) Station'Radio/ogical EP-TM-1000 0 Emel'< enc Plan Exelon Nuclear Standardized Radiological EP-AA-1000 (superseded) 29 Erner enc Plan The changes to the Emergency Plan documentation were evaluated under the requirements of 10 CFR 50.54(q) and were determined not to result in a reduction in the effectiveness of the Emergency Plan for TMI. This notification is being submitted within 30 days of implementation of the changes as required by 10 CFR 50.54(q)(5). The changes continue to meet the applicable planning standards established in 10 CFR 50.47(b) and 10 CFR 50, Appendix E.

In addition, as required by 10 CFR 50.54(q)(5), Attachment 1 of this submittal includes a summary analysis of the changes to the TMI Emergency Plan.

_J

U.S. Nuclear Regulatory Commission Emergency Plan Revision Docket Nos. 50-289 and 50-320 March 29, 2018 Page2 Attachments 2 and 3 of this letter contain a copy of the revised Emergency Plan documents. A copy of the superseded procedure (EP-AA-1000) pertaining to TMI is not included as an attachment.

This submittal also satisfies the reporting requirements associated with 10 CFR 72.44(f), which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Storage and Transportation.

There are no regulatory commitments in this submittal.

If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557.

Respectfully, David P. Helker Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments:

1. 10 CFR 50.54(q)(5) Procedure Change Summary Analysis
2. EP-AA-1009, Revision 28, "Exelon Nuclear Radiological Emergency Plan Annex for Three Mile Island (TM/) Station"
3. EP-TM-1000, Revision 0, "Three Mile Island (TM/) Station Radiological Emergency Plan" cc: w/ Attachment 1 only Regional Administrator - NRC Region I Director, NRC Division of Spent Fuel Storage and Transportation, ONMSS NRC Senior Resident Inspector- Oyster Creek Nuclear Generating Station NRC Project Manager, NRR- Oyster Creek Nuclear Generating Station Director, Bureau of Radiation Protection - Pennsylvania Department of Environmental Resources Chairman, Board of County Commissioners of Dauphin County, PA Chairman, Board of Supervisors of Londonderry Township, PA R. R. Janati, Commonwealth of Pennsylvania