Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18022A818 + (ML18022A818)
- ML18022A819 + (ML18022A819)
- ML18022A820 + (ML18022A820)
- ML18022A821 + (ML18022A821)
- ML18022A822 + (ML18022A822)
- ML18022A823 + (ML18022A823)
- ML18022A824 + (ML18022A824)
- ML18022A825 + (ML18022A825)
- ML18022A826 + (ML18022A826)
- ML18022A827 + (ML18022A827)
- JAFP-18-0012, Supplemental Response Concerning License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 + (ML18022A829)
- ML18022A830 + (ML18022A830)
- 05000400/LER-1990-011-01, :on 900405,tech Spec Violation Occurred Due to Missed Leakage Tests on Valve.Caused by Procedural Deficiency.Appropriate Procedure Revised & Personnel Trained + (ML18022A875)
- ML18022A881 + (ML18022A881)
- ML18022A883 + (ML18022A883)
- ML18022A884 + (ML18022A884)
- ML18022A885 + (ML18022A885)
- IR 05000400/1992030 + (ML18022A887)
- ML18022A894 + (ML18022A894)
- ML18022A897 + (ML18022A897)
- ML18022A900 + (ML18022A900)
- ML18022A901 + (ML18022A901)
- ML18022A903 + (ML18022A903)
- ML18022A904 + (ML18022A904)
- ML18022A905 + (ML18022A905)
- ML18022A906 + (ML18022A906)
- ML18022A907 + (ML18022A907)
- ML18022A909 + (ML18022A909)
- HNP-93-819, Submits Proposed Alternative to Shearon Plant Commitment to Perform Biennial Reviews of Plant Procedures Per ANSI Standard N18.7-1976 Re Change in QA Program + (ML18022A913)
- ML18022A914 + (ML18022A914)
- RAIO-0118-58286, LLC Response to NRC Request for Additional Information No. 316 (Erai No. 9222) on the NuScale Design Certification Application + (ML18022A915)
- HNP-93-828, Suppls 930226 Application for Amend to License NPF-63 Re RCS pressure-temp Limits + (ML18022A916)
- ML18022A918 + (ML18022A918)
- HNP-93-851, Forwards Rev 21 to PLP-201, Emergency Plan & Revised EPIPs Including Change 1,Rev 11 to PEP-102,Rev 8 to PEP-103,Change 1,Rev 4 to PEP-104,Rev 9 to PEP-204,Rev 5 to PEP-206,Rev 3 to PEP-216 & Change 1,Rev 7 to PEP-217.W/3 Oversize Figs + (ML18022A920)
- ML18022A924 + (ML18022A924)
- HNP-94-032, Forwards Vols 1,2 & 3 of Radiological Environ Operating Rept 1993 + (ML18022A926)
- ML18022A928 + (ML18022A928)
- ML18022A930 + (ML18022A930)
- IR 05000400/1994012 + (ML18022A931)
- HNP-94-065, Forwards ISI Summary 1st Interval,2nd Period,5th Refueling Outage 1-2-05 Completed 940803, in Accordance W/Asme Boiler & PV Code,Section Xi,Article IWA-6220(b) + (ML18022A933)
- HNP-94-071, Transmits Rev 23 to Emergency Plan PLP-201 & Rev 4 to EPIP- PEP-001,rev 8 to EPIP PEP-101,rev 12 Change 4 to EPIP PEP-102,rev 10 to EPIP PEP-103, Rev 6 to EPIP PEP-104,rev 6 to EPIP PEP-201 & Rev 5 to EPIP PEP-202 + (ML18022A936)
- ML18022A941 + (ML18022A941)
- ML18022A945 + (ML18022A945)
- HNP-95-019, Forwards Request for Enforcement Discretion from TS 3.3.1, Table 3.3-1, RTS Instrumentation & 3.3.2,Table 3.3-3, ESFAS Instrumentation, Permitting Continued Operation W/ Ssps Inoperable for Longer than Allowed by TS 3.3.2 + (ML18022A946)
- ML18022A947 + (ML18022A947)
- ML18022A948 + (ML18022A948)
- HNP-95-016, Proposed Tech Specs 3.1.1.2 Re Relocating Shutdown Margin Vs Boron Concentration Curve to COLR + (ML18022A949)
- ML18022A950 + (ML18022A950)
- IR 05000207/2002017 + (ML18022A951)
- HNP-95-097, Forwards Vols 1 & 2 of Special Rept - SG Tube ISI Results RFO 5. Rept Provides Results of SG Tube ISIs Performed in Apr 1994 + (ML18022A952)
- ML18022A954 + (ML18022A954)