Notice of Violation from Insp on 940507-0603.Violation Noted:Acceptance Testing for Plant Mod to Install Start Time Recorder for B EDG Changed to Delete Specified Loop Calibrations W/O Required Reviews
ML18022A930
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/17/1994
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18022A929 List:
References
50-400-94-12, NUDOCS 9406290192
Download: ML18022A930 (2)


Text

ENCLOSURE 1

NOTICE OF VIOLATION Carolina Power and Light Company Shearon Harris Unit 1

Docket No.:

50-400 License No.:

NPF-63 During an NRC inspection conducted on May 7 - June 3, 1994, violations of NRC requirements were identified.

In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions,"

10 CFR Part 2, Appendix C, the violations are listed below:

A.

Technical Specification 6.8. l.a requires written procedures to be properly established and implemented covering activities referenced in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.

Regulatory Guide 1.33, Appendix A, paragraph 9.e. requires procedures for the control of maintenance and modification work.

B.

Procedure MOD-204, Modification Implementation, step 5.7.7 requires that revisions to modification acceptance tests receive appropriate reviews by engineering and affected organizations..

Contrary to the above, on April 19,

1994, the acceptance testing for a plant modification to install a start time recorder for the "B" emergency diesel generator, was changed to delete specified loop calibrations without the required reviews.

This is a Severity Level IV violation (Supplement I).

10 CFR 50, Appendix B, Criterion XVI requires that measures shall be established to assure conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, and non-conformances are properly identified and corrected.

The licensee's Corporate guality Assurance Manual, section 12, requires that significant conditions adverse to quality be identified and corrected; Contrary to the above, on January 22,

1994, an emergency plan implementing procedure which contained a condition adverse to quality regarding the improper designation of a deleted watchstation as a

replacement for the shift supervisor when acting as the site emergency coordinator was not promptly, corrected.

This is a Severity Level IV violation (Supplement VIII).

Pursuant to the provisions of 10 CFR 2.201, Carolina Power and Light Company is hereby required to submit a written statement or explanation to the U. S.

Nuclear Regulatory Commission, ATTN:

Document Control

Desk, Washington, D.

C.

20555, with a copy to the Regional Administrator, Region II, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).

This reply should be clearly marked as a "Reply to a Notice of 9406290l92 940617 PDR ADOCK 05000400 8

PDR

Notice of Viol at i on Violation" and should include for each violation:

(1) the reason for the violation, or, if contested, the b'asis for disputing the violation, (2) the corrective steps that have been taken and the results

achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.

If an adequate reply is not received within the time specified in this Notice, an order or demand for information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken.

Where good cause is shown, consideration will be given to extending the response time.

Dated at Atlanta, Georgia this day of June 1994