Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18011A558 + (ML18011A558)
- ML18011A559 + (ML18011A559)
- IR 05000400/1994015 + (ML18011A561)
- HNP-94-068, Forwards Seminannual Radioactive Effluent Release Rept for Jan-June 1994 & ODCM, Rev 4 + (ML18011A562)
- ML18011A563 + (ML18011A563)
- HNP-94-070, Responds to NRC Re Violations Noted in Insp Rept 50-400/94-13.Corrective Actions:Maint Surveillance Test Procedures & Process Instrumentation Calibr Procedures Will Be Revised.Violation a Denied + (ML18011A564)
- ML18011A566 + (ML18011A566)
- IR 05000400/1994016 + (ML18011A568)
- HNP-94-067, Application for Amend to License NPF-63,revising TS Tables 2.2-1 & 3.3-4,reflecting Results of Revised SG Water Level Setpoint Accuracy Calculation + (ML18011A569)
- ML18011A571 + (ML18011A571)
- ML18011A572 + (ML18011A572)
- ML18011A574 + (ML18011A574)
- 05000400/LER-1994-004-03, :on 940805,discovered That Failures of B EDG Occurred.Caused by Inadequate Procedures & Administrative Controls.Edg Tested & Implemented Increased Test Frequency of Once Per Seven Days on Staggered Test Basis + (ML18011A575)
- ML18011A576 + (ML18011A576)
- IR 05000400/1994018 + (ML18011A579)
- ML18011A580 + (ML18011A580)
- ML18011A582 + (ML18011A582)
- IR 05000400/1994013 + (ML18011A583)
- ML18011A584 + (ML18011A584)
- ML18011A585 + (ML18011A585)
- ML18011A586 + (ML18011A586)
- ML18011A589 + (ML18011A589)
- HNP-94-075, Monthly Operating Rept for Aug 1994 for Shearon Harris Nuclear Power Plant + (ML18011A592)
- ML18011A593 + (ML18011A593)
- ML18011A594 + (ML18011A594)
- ML18011A596 + (ML18011A596)
- ML18011A597 + (ML18011A597)
- HNP-94-076, Informs That Shnpp No Longer Has Need for SRO License,Docket 55-20750 & Requests That License Be Terminated.Individual Reassigned to Position Which Does Not Require Operator or Senior Operator License + (ML18011A598)
- ML18011A600 + (ML18011A600)
- 05000400/LER-1994-005-02, :on 940901,TS Surveillance Violation Occurred. Caused by Personnel Error During Sample Analysis Process. Individuals Involved in Incident Counseled & Event Reviewed W/Applicable E&C Personnel + (ML18011A601)
- ML18011A602 + (ML18011A602)
- ML18011A603 + (ML18011A603)
- HNP-94-079, Monthly Operating Rept for Sept 1994 for Shearon Harris Nuclear Power Plant + (ML18011A605)
- HNP-94-080, Responds to NRC Re Violations Noted in Insp Rept 50-400/94-17.Corrective Actions:Edg B Tested to Verify Operability Status & to Implement Increased Test Frequency of Once Per Seven Days on Staggered Test Basis for EDGs + (ML18011A606)
- ML18011A607 + (ML18011A607)
- ML18011A608 + (ML18011A608)
- IR 05000400/1994014 + (ML18011A610)
- ML18011A611 + (ML18011A611)
- ML18011A613 + (ML18011A613)
- HNP-94-073, Application for Amend to License NPF-63,relocating Selected TS Per NUREG-1431 + (ML18011A614)
- ML18011A615 + (ML18011A615)
- ML18011A616 + (ML18011A616)
- ML18011A619 + (ML18011A619)
- ML18011A620 + (ML18011A620)
- ML18011A621 + (ML18011A621)
- HNP-94-085, Forwards Svc Water Sys Operational Performance self- Assessment Plan Summary,Per Administrative Ltr 94-03 + (ML18011A622)
- ML18011A623 + (ML18011A623)
- ML18011A624 + (ML18011A624)
- ML18011A625 + (ML18011A625)
- ML18011A626 + (ML18011A626)
- HNP-94-083, Forwards Retyped TS Pages for License Amend Re Radiological Effluent TSs + (ML18011A632)