Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000250/LER-1990-020, :on 901013,surveillance Interval of Tech Spec 4.8.2.1 Exceeded Due to Personnel Error.Personnel Involved Counseled & Procedure 4-OSP-201.3 Revised + (ML17348B137)
- 05000250/LER-1991-005-02, :on 910830,3A Component Cooling Water (CCW) Pump Started Automatically on Low Pressure Due to Personnel Error.Training Brief Will Be Written & Distributed to Appropriate Personnel to Discuss Subj LER + (ML17348B138)
- L-91-246, Responds to NRC Concerns Noted in Insp Repts 50-250/91-35 & 50-251/91-35 on 910826-30.Corrective Actions:Environ Documentation Packages Will Be Updated to Reflect Installed Configuration of All Known Periodic Update Items by 911231 + (ML17348B139)
- NL-17-2061, Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B + (ML17348B140)
- ML17348B142 + (ML17348B142)
- ML17348B145 + (ML17348B145)
- ML17348B148 + (ML17348B148)
- 05000251/LER-1991-002-03, :on 910107 & 0729,permanent Magnet Generator Failed During Performance of Emergency Diesel Generator 4A Tests.Caused by Misalignment of Drive Shaft & Ground in Voltage Regulator.New Drive Shaft Installed + (ML17348B149)
- 05000250/LER-1991-006, :on 910921,RWST Had Less than 320,000 Gallons of Borated Water Required by TS 3/4.5.4 & Safety Injection Pumps Not Aligned to Operable Flow Path.Caused by Procedural Inadequacy.Pumps Realigned + (ML17348B150)
- ML17348B153 + (ML17348B153)
- ML17348B154 + (ML17348B154)
- L-91-266, Forwards Proposed Operator Licensing,Requalification & Generic Fundamental Exam Schedules,Reflecting Anticipated Number of Candidates to Be Examined,Per Generic Ltr 91-12, Operator Licensing Natl Exam Schedule + (ML17348B157)
- Press Release-17-051, NRC Approves Changes to Fort Calhoun Nuclear Plants Emergency Planning Requirements + (ML17348B164)
- ML17348B167 + (ML17348B167)
- L-91-273, Monthly Operating Repts for Sept 1991 for Turkey Point,Units 3 & 4 + (ML17348B182)
- ML17348B185 + (ML17348B185)
- ML17348B186 + (ML17348B186)
- IR 05000250/1991032 + (ML17348B188)
- ML17348B189 + (ML17348B189)
- IR 05000250/1991040 + (ML17348B191)
- 05000250/LER-1991-007, :on 910925,detector Cables for ex-core Nuclear Instrument intermediate-range Channel N-35 Found Disconnected.Caused by Lifted Leads Between N-35 Drawer & Detector.Maint Policy Issued + (ML17348B192)
- L-91-287, Forwards Emergency Response Data Sys Implementation Plan & Description of Plant Computer Sys Configuration & Interface. Emergency Procedures Will Be Revised,As Necessary,To Ensure Activation of Sys within 1 H of Declaration of Alert + (ML17348B193)
- L-91-256, Forwards Response to Generic Ltr 91-06, Resolution of Generic Issue A-30, Adequacy of Safety-Related DC Power Supplies + (ML17348B196)
- L-91-303, Submits Rev 1 to 911029 Temporary Waiver of Compliance from TS 3.2.1.b, Axial Flux Difference to Clarify That ex-core Calibr Cannot Be Performed at Power Level Recommended in TS Table 4.3-1 + (ML17348B198)
- L-91-301, Application for Amends to Licenses DPR-31 & DPR-41, Supporting Util 911029 & 30 Requests for Temporary Waiver of Compliance from Tech Spec 3.2.1, Axial Flux Difference + (ML17348B199)
- ML17348B200 + (ML17348B200)
- ML17348B201 + (ML17348B201)
- 05000250/LER-1991-008, :on 911003,reactor Tripped Manually Due to Loss of Main Turbine Generator Load.Caused by Mechanical Failure of Piping Nipple in Control Oil Sys Due to Pipe Vibration. Nipples Will Be Replaced During Next Outage + (ML17348B202)
- L-91-302, Forwards Proprietary Response to NRC 910905 Request for Addl Info Re B&W Owners WF-70 Program & App G Analysis.Encl Withheld (Ref 10CFR2.790) + (ML17348B203)
- L-91-294, Requests Temporary Waiver of Compliance from TS 3.2.1.b, Axial Flux Difference to Allow Operation Outside Plus or Minus 5% Target Band W/O Accruing Penalty Deviation Time to Calibr ex-core Detectors + (ML17348B206)
- ML17348B210 + (ML17348B210)
- L-91-305, Forwards Rev 23 to Radiological Emergency Plan.Revised EPIPs 20101,20104,20110 & 20127 Also Encl + (ML17348B217)
- ML17348B221 + (ML17348B221)
- L-91-312, Responds to Ltr Re Violations Noted in Insp Repts 50-250/91-38 & 50-251/91-38.Corrective Actions:Off Normal Operating Procedure ONOP-030 Revised 910912 to Incorporate Monitoring Requirements + (ML17348B222)
- ML17348B224 + (ML17348B224)
- ML17348B225 + (ML17348B225)
- ML17348B226 + (ML17348B226)
- ML17348B228 + (ML17348B228)
- ML17348B229 + (ML17348B229)
- ML17348B230 + (ML17348B230)
- ML17348B232 + (ML17348B232)
- ML17348B233 + (ML17348B233)
- ML17348B236 + (ML17348B236)
- ML17348B238 + (ML17348B238)
- ML17348B240 + (ML17348B240)
- IR 05000250/1991039 + (ML17348B241)
- ML17348B242 + (ML17348B242)
- ML17348B244 + (ML17348B244)
- ML17348B245 + (ML17348B245)
- L-91-309, Monthly Operating Repts for Oct 1991 for Turkey Point,Units 3 & 4 + (ML17348B246)
- L-91-278, Forwards Comments on SER Accompanying 910423 Amends to Licenses DPR-31 & DPR-41 Re RTD Bypass Elimination Project, Per 900913 Application for Amends to Licenses + (ML17348B247)