Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17348A380 + (ML17348A380)
- ML17348A382 + (ML17348A382)
- LIC-17-0075, Design and Licensing Basis Reconstitution Project (Dlbrp) Commitment Revision + (ML17348A383)
- L-90-238, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/90-08 & 50-251/90-08.Corrective Actions:Training Dept Increased Emphasis on Radiological Postings in Radiation Worker Training + (ML17348A385)
- L-90-237, Advises That New Date for Submittal of Response to Insp Repts 50-250/90-09 & 50-251/90-09 Is 900702 + (ML17348A386)
- L-90-249, Requests Audit of NRC Records to Independently Verify Reasonableness of Charges Assessed Against Util,Per 10CFR170 Svcs + (ML17348A388)
- L-90-260, Summarizes Facility Performance Since Last SALP Evaluation Period Which Ended 890731.Util Pursued Aggressive self- Assessment Program,Including Significant Internal or Outside Assessments in Areas of Operator Performance & EOPs + (ML17348A392)
- L-90-256, Forwards Requested Addl Info Re Emergency Power Sys Enhancement Project.Specific Detailed Changes Will Be Made to Procedures to Address Mods Affecting Equipment Relied Upon for Safe Shutdown + (ML17348A394)
- ML17348A395 + (ML17348A395)
- IR 05000250/1990020 + (ML17348A397)
- L-90-242, Comment Opposing Proposed Rule 10CFR55 Re fitness-for-duty Programs.Believes Current Program Aggressively Supports Performance Objective of fitness-for-duty Regulation & Applied Equally to All Persons Granted Unescorted Access + (ML17348A398)
- ML17348A400 + (ML17348A400)
- ML17348A401 + (ML17348A401)
- IR 05000250/1990015 + (ML17348A403)
- L-90-255, Forwards Addl Info Re Responses to NRC Questions on Piping Codes Used for Emergency Power Sys Enhancement Project + (ML17348A404)
- L-90-241, Comment Supporting NUMARC Position on Revised Wording of Petition for Rulemaking PRM-50-55 Concerning Fsars.Resulting Longer Interval Between FSAR Updates Would Benefit Many Licensees + (ML17348A405)
- L-90-257, Monthly Operating Repts for June 1990 for Turkey Point Units 3 & 4 + (ML17348A408)
- 05000250/LER-1990-013, :on 900615,reactor Trip Occurred When Operator Raised Power Above 10% W/Turbine in Tripped Condition.Caused by Personnel Error.Event Reviewed W/Operations Personnel & Operator Training in Selfchecking Initiated + (ML17348A411)
- L-90-266, Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount + (ML17348A412)
- ML17348A414 + (ML17348A414)
- L-90-263, Provides Info Re Plant Implementation of 10CFR50.44 & NUREG- 0737,Item II.E.4.1 Re Hydrogen Recombiners,Per 900518 Meeting & Insp Repts 50-250/90-13 & 50-251/90-13.Agreement Re Use of External Recombiners Will Be Reactivated + (ML17348A415)
- L-90-264, Responds to Commitment Re Reverse Testing of Containment Isolation Valves Per Insp Repts 50-250/90-13 & 50-251/90-13. Corrective Action Plan Addresses Penetrations 16 & 53 for Unit 3 Only & Penetrations 11,47,54A & 54B for Both Units + (ML17348A416)
- L-90-270, Forwards May 1990 Integrated Schedule Regulatory Rept for Plant + (ML17348A417)
- L-90-275, Advises That Comments on NRC Safety Evaluation Re Implementation of Station Blackout Rule Will Be Provided by 900921 + (ML17348A419)
- L-90-247, Forwards Revised No Significant Hazards Determination for Proposed Tech Specs 1.17 & 3.0.5 & Bases,Per + (ML17348A420)
- ML17348A422 + (ML17348A422)
- ML17348A423 + (ML17348A423)
- L-90-268, Withdraws 900207 & 0424 Proposed Changes to Tech Specs Re Util Nuclear Review Board Composition + (ML17348A425)
- L-90-267, Special Rept:On 900604 & 13,fire Barriers Breached for More than 7 Days.Caused by Welding in Area.Plant Continues to Implement Compensatory Measures as Applicable + (ML17348A426)
- L-90-245, Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b) + (ML17348A428)
- L-90-251, Documents Written & Verbal Request of Region II Personnel for Temporary Waiver of Compliance of Tech Spec 3.4.2.b.1 Re Allowable Out of Svc Time for One Emergency Containment Cooler from 24 H to 72 Hr W/Addl Reasons + (ML17348A431)
- L-90-248, Forwards Rev 8 to Updated FSAR for Turkey Point Units 3 & 4. Rev Includes Activities Completed Between 890123 & 900122. Rept of Changes for Jul 1989 Through June 1990 Will Be Provided by 900901 + (ML17348A432)
- ML17348A433 + (ML17348A433)
- IR 05000250/1990019 + (ML17348A436)
- ML17348A442 + (ML17348A442)
- IR 05000250/1990022 + (ML17348A448)
- ML17348A454 + (ML17348A454)
- IR 05000250/1990023 + (ML17348A460)
- IR 05000250/1990009 + (ML17348A462)
- ML17348A463 + (ML17348A463)
- ML17348A464 + (ML17348A464)
- IR 05000250/1990024 + (ML17348A466)
- 05000251/LER-1990-006-02, :on 900705,automatic Start of Component Cooling Water Pump 4B Occurred Due to Low Pump Discharge Header Pressure.Caused by Personnel Error.Responsible Individual Required to Review Procedure + (ML17348A467)
- 05000250/LER-1990-014, :on 900627,plant Mgt Declared Both PORV Block Valves Inoperable.Caused by Unconservative Min Required Thrust Values Specified by Valve.Util Plans to Readjust PORV Block Valve Operator Torque Switches + (ML17348A468)
- L-90-277, Forwards Addl Info on Emergency Power Sys Enhancement Project Re Load Sequencer,Programmable Logic Controllers & Implementation of Sys in Plant,Per NRC 900705 Request + (ML17348A469)
- L-90-232, Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance Testing + (ML17348A470)
- ML17348A471 + (ML17348A471)
- IR 05000250/1990021 + (ML17348A473)
- ML17348A474 + (ML17348A474)
- LR-N17-0188, Response to Integrated Inspection Report 05000272/2017003 and 05000311/2017003 + (ML17348A477)
- ML17348A478 + (ML17348A478)