ML17348A401

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-250/90-15 & 50-251/90-15 on 900521-25.No Violations or Deviations Noted
ML17348A401
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/25/1990
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17348A402 List:
References
NUDOCS 9007170297
Download: ML17348A401 (6)


See also: IR 05000250/1990015

Text

Docket Nos. 50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power

and Light Company

ATTN:

Nr. J.

H. Goldberg

President - Nuclear

P. 0.

Box 14000

Juno Beach,

FL

33408-0420

'Gentlemen:

SUBJECT:

NRC INSPECTION REPORT

NOS. 50-250/90-15

AND 50-251/90-15

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

R.

R.

Narston

on

Nay 21-25,

1990.

The inspection

included

a review of

activities authorized for your Turkey Point facility.

At the conclusion of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

Inspection Report.

Areas

examined

during the inspection

are identified in the', report.

Ilithin

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of

activities in progress.

Within the

scope

of the

inspection,

no violations

or deviations

were

identified.

In accordance

with 10 CFR 2.790(a),

a copy of this letter

and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter, please

contact us.

Sincerely,

ORIGlNALSJMtEO I3v

JQHN P. POTTER

Enclosure:

NRC Inspection

Report

cc w/encl:

(See

page

2)

Douglas tt. Collins, Chief

Emergency

Preparedness

and

Radiological Protection

Branch

Division of Radiation Safety

and Safeguards

9007i70297

900625

PGR " 'ADOCK 05000250

9

POC

~in'

t

ll I(

~,

I

Florida Power and Light Company

cc w/encl:

K. N. Harris, Vice President

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami, FL

33102

J.

E. Cross,

Plant Manager

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami, FL

33102

L. W..Bladow

Plant

gA Superintendent

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami, FL

33102

D. Powell, Regulatory

and

Compliance Superintendent

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami, FL

33102

Harold F. Reis,

Esq.

Newman and Holtzinger, P.C.

1615

L Street,

NW

Washington,

D. C.

20036

John T. Butler, Esq.

Steel,

Hector and Davis

4000 Southeast

Financial

Center

Miami, FL

33131-2398

Attorney General

Department of Legal Affairs

The Capitol

Tallahassee,

FL

332304

Jacob

Daniel

Nash

Office of Radiation Control

Department of Health and

Rehabilitative Services

1317 Winewood Boulevard

Tallahssee,

FL

32399-0700

Jack Shreve

Office of the Public Counsel

Room 4, Holland Building

Tallahassee,

FL

32304

(cc w/encl:

Cont'd

on page

3)

F

~)*~

h

g

ll

h

H

N

P

pl

4

Florida Power and Light Company

(cc w/encl:

cont'd)

Administrator

Department of Environmental

Regulation

Power Plant Siting Section

State of Florida

Twin Towers

2600 Blair Stone

Road

Tallahassee,

FL

32301

Joaquin

Avino

County Manager of Yietropolitan

Dade County

111

NW 1st Street,

29th Floor

l1iami,

FL

33128

Intergovernmental

Coordination

and Review

Office of Planning

and Budget

Executive Office of the Governor

The Capitol Building

Tallahassee,

FL

32301

State of Florida

bcc w/encl:

G.

E. Edison,

NRR

Document Control

Desk

Ross Butcher, Sr. Resident

Inspector

U.S. Nuclear Regulatory

Commission

P. 0.

Box 1448

Homestead,

FL

33090

RII

RSS

t

RHa

s

n

6/ 490

RI~I)RSS

TDecker

6/yi/90

RII+gg

RCrlenjak

6/@f90

I

I

Il

I

P I

I'l

7

7

0

1

I

t

1