ML17348A382

From kanterella
Jump to navigation Jump to search
Safety Evaluation Supporting Amends 136 & 131 to Licenses DPR-31 & DPR-41,respectively
ML17348A382
Person / Time
Site: Turkey Point  
Issue date: 07/03/1990
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17348A381 List:
References
NUDOCS 9007090077
Download: ML17348A382 (6)


Text

gp,it RROtr rp yG 1p0r %~

o"

++*<<9s UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. l TO FACILITY OPERATING LICENSE NO.

DPR<<31 AND AMENDMENT NO.

TO FACILITY OPERATING LICENSE NO.

DPR-41 FLORIDA POWER AND LIGHT COMPANY TURKEY POINT UNIT NOS.

3 AND 4 DOCKET NOS. 50-250 AND 50-251

1.0 INTRODUCTION

By letter dated February 7, 1990-,

as supplemented April 24, 1990, Florida Power Im Light Company (FPL or the licensee) requested amendments to the Technical Specifications (TS) appended to Facility Operating License Nos.

DPR-31 and DPR-41 for the Turkey Point Unit Nos.

3 and 4 Nuclear Generating Plants.

The proposed amendments would change TS 6.5.2.2 by removing the specific composition list for the Company Nuclear Review Board (CNRB), and TS 6.5.2.6 to redefine a

quorum of the CNRB.

The April 24, 1990 letter provided supplemental information as requested by the staff to revise the quorum requirements in TS 6.5.2.6.

This information did not change the staff's proposed determination of no significant hazards consideration as published in the Federal

~Re ister on March 21, 1990 (55 FR 10532).

2.0 EVALUATION The licensee proposes to change the description of the CNRB contained in TS 6.5.2.2 from one that describes its members by title of the position they hold to one that describes its members by technical discipline, level of education, and professional experience.

This change will eliminate the need to process license amendments when the licensee makes organizational changes that affect the position titles of the CNRB members.

The change requires the FPImL Executive Vice President to appoint at least five members of the CNRB whose qualifications meet the criteria of Section 4.7 of ANSI/ANS-3.1 - 1987, and have at least 5 years of cumulative professional experience in one ot more of the fields listed in TS 6.5.2.1.

The Chairman of the CNRB shall meet the criteria of ANSI/ANS-3.1 - 1987, Section 4.7.1.

The proposed changes are consistent with recent Commission practice in the case of several other plants (for example, Vogtle 1 and 2, Shearon Harris 1, St.

Lucie 1 and 2, Crystal River 3).

Therefore, the staff finds the proposed changes acceptable.

90070'00077 900703 PDR AOGCK 05000250 PDC

In addition, TS 6.5.2.6 is being revised to require that a quorum consist of the Chairman or his designated alternate and at least a majority of the CNRB

members, including alternates.

The current TS require that a quorum consist of the Chairman or designated Acting Chairman and four members, including alternates.

Since this change is consistent with the CTS philosophy of requiring a majority to comprise a quorum, the staff finds the proposed change acceptable.

3.0

SUMMARY

Based on our review, the changes proposed in this request are adequate and acceptable.

4. 0 ENVIRONMENTAL CONSIDERATIONS These amendments relate to changes in recordkeeping, reporting or administrative procedures or requirements.

Accordingly, these amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10).

Pursuant to 10 CFR 51,22(b),

no environmental impact statement or environmental assessment need be prepared in connection with the issuance of these amendments.

5. 0 CONCLUSION We have concluded, based on the considerations discussed above, that:

(1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed

manner, and (2) such activities will be conducted in compliance with the Commission's regulation and the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.

Dated:

Ju]y 3, l990 Princi al Contributor:

G.

Wunder

i l

DATED:

July 3, 1990 AMENDMENT NO.

136 TO FACILITY OPERATING LICENSE NO. DPR-31-TURKEY POINT UNIT 3 AMENDMENT N0.131 TO FACILITY OPERATING LICENSE NO. DPR-41-TURKEY POINT UNIT 4 i.Docket File

'RC II Local PDRs PDII-2 Reading S. Varga, 14/E/4 G. Lainas, 14/H/3 H. Berkovi D. Hiller G. Edison OGC-WF D. Hagan, 3302 MNBB E. Jordan, 3302 NNBB B. Grimes, 9/A/2 G. Hill (8), P-137 Wanda Jones, P-130A J. Calvo, 11/F/23 G. Wunder ACRS (10)

GPA/PA OC/LFHB PD Plant-specific fi N. Sinkule, R-II Others as required le LGray File]

cc:

Plant Service list

P

\\

1, A

F dl

>1