- RAIO-1217-57528, LLC Response to NRC Request for Additional Information No. 250 (Erai No. 9191) on the NuScale Design Certification Application + (ML17341B188)
- ML17341B189 + (ML17341B189)
- ML17341B190 + (ML17341B190)
- L-82-207, Advises That Util 800613 & s Committed to Meeting Requirements of TMI Action Plan Item II.K.3.3, Reporting Safety & Relief Valve Failures & Challenges, in Response to NRC + (ML17341B191)
- L-82-227, Advises That Response to Generic Ltr 82-10 Re post-TMI Requirements Will Be Submitted by 820702 + (ML17341B193)
- L-82-229, Forwards Emergency Operating Procedure 20002.2 on Loss of Secondary Coolant,Referred to in .(Ref IE Bulletin 80-04) + (ML17341B194)
- ML17341B195 + (ML17341B195)
- ML17341B196 + (ML17341B196)
- L-82-220, Forwards Response to 820409 Request for Addl Info Re Seismic Qualification of Auxiliary Feedwater Sys + (ML17341B197)
- L-82-225, Forwards Addl Info Requested 820329 Re Response to IE Bulletin 80-11, Masonry Wall Design + (ML17341B198)
- ML17341B199 + (ML17341B199)
- ML17341B200 + (ML17341B200)
- ML17341B205 + (ML17341B205)
- ML17341B210 + (ML17341B210)
- ML17341B212 + (ML17341B212)
- ML17341B213 + (ML17341B213)
- L-82-235, Discusses 820518 Meeting Re App R Fire Protection Submittal Dates.Util Attempting to Provide Unit 1 App R Fire Protection Submittal Before 820701 to Provide Addl Review Time Prior to in of Industry Submittals on 820701 + (ML17341B214)
- ML17341B220 + (ML17341B220)
- L-82-240, Forwards Initial Response to NRC 820428 & 0503 Requests for Addl Info Re Control Room Habitability Requirements of NUREG-0737,Item III.D.3.4.Response to Questions 1 & 2 Will Be Submitted by 820716 + (ML17341B221)
- L-82-236, Forwards Final Radiological Progress Rept(5),810624- 820407 + (ML17341B222)
- ML17341B223 + (ML17341B223)
- ML17341B224 + (ML17341B224)
- L-82-241, Submits Revised Schedules for Implementation of NUREG-0737, Items II.B.2,II.B.3 & II.F.1,per Generic Ltr 82-05 + (ML17341B225)
- ML17341B226 + (ML17341B226)
- ML17341B228 + (ML17341B228)
- ML17341B229 + (ML17341B229)
- ML17341B230 + (ML17341B230)
- L-82-244, Application to Amend App a of Licenses DPR-31 & DPR-41, Adding safety-related Mechanical Snubbers to Table 3.13-1 + (ML17341B233)
- ML17341B234 + (ML17341B234)
- ML17341B235 + (ML17341B235)
- L-82-245, Forwards Response to NRC 820316 Preliminary Questions Re Inservice Insp Program + (ML17341B239)
- L-82-250, Forwards Revision 5 to Topical QA Rept FPL-NQA-100, QA Manual. Revision Includes Latest Organization Changes Submitted on 810928 & New Reg Guide & ANSI Std Commitments Requested & Approved in Facility SER + (ML17341B240)
- ML17341B241 + (ML17341B241)
- ML17341B242 + (ML17341B242)
- L-82-252, Forwards Check for Payment of Proposed License Amend Re safety-related Snubbers + (ML17341B243)
- ML17341B249 + (ML17341B249)
- L-82-271, Responds to Generic Ltr 82-10, Post-TMI Requirements. Status Provided for Items I.A.1.3.1 Re Limitations on overtime,I.A.1.4.2 Re Min Shift Crew & I.D.1 Re Control Room Design Review + (ML17341B253)
- L-82-263, Responds to NRC 820524 Request for Addl Info Re NUREG-0737, Items I.A.2.1, Upgrading Senior Reactor Operator & Reactor Operator Training, & II.B.4, Training to Mitigate Core Damage + (ML17341B254)
- L-82-265, Advises That Completion of Const Project Described in to NRC Delayed Until 820816,due to Unforeseen Engineering & Procurement Problems + (ML17341B255)
- Information Notice 2018-08, Failure to Enter the Required Technical Specifications Action Statement for Operation During Recent Surveillance Testing While Using a Reactor Protection System Test Box + (ML17341B256)
- L-82-268, Provides Results of Engineering Evaluation of Loss of Ventilation on Components in Critical Areas During Loss of Ac Power.Loss of Ventilation Will Not Affect Capability to Maintain Coolant Inventory & Heat Removal + (ML17341B257)
- ML17341B259 + (ML17341B259)
- ML17341B261 + (ML17341B261)
- L-82-258, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 20101 Re Duties of Emergency coordinator,20106 Re Natural Emergencies & 20107 Re Fire & Explosion Emergencies + (ML17341B263)
- L-82-276, Submits Suppl 2 of Response to Generic Ltr 82-05 Re Progress in Completing post-TMI Items II.B.2, Plant Shielding, II.B.3, Post-Accident Sampling Capability, II.F.1.6 & II.F.1.4, Containment Hydrogen & Pressure Monitors + (ML17341B271)
- L-82-275, Responds to 820701 Request for Submittal Addressing Functionability of Pressurizer Safety Valves & Power Operated Relief Valves,Required by NUREG-0737,Item II.D.1.A. Final Safety Valve Evaluation Will Be Sent by 820901 + (ML17341B272)
- L-82-281, Forwards Reactor Containment Bldg Integrated Leak Rate Test,Types A,B & C + (ML17341B273)
- ML17341B274 + (ML17341B274)
- ML17341B275 + (ML17341B275)
- L-82-293, Responds to Requesting Clarification of NUREG- 0737,Item II.K.3.25, Loss of AC Power to Reactor Coolant Pump Seals. Component Cooling Water Sys Exchange Is Automatically Restored During Event + (ML17341B277)
- L-82-295, Forwards Turkey Point Units 3 & 4 Updated Fsar,Vols 1-4 + (ML17341B278)