Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000397/1991027 + (ML17289A604)
- GO2-92-133, Discusses Implementation of Phase II Emergency Operating Procedures,Per Insp Rept 50-397/91-27 & Corrective Action Plan for Licensed Operator Requalification Program.Proposes That Phase I of Procedures Be Used Through Nov 1992 Exam + (ML17289A604)
- GO2-92-130, Requests Waiver of Compliance from TS 3.6.5.1.a Re Secondary Containment Integrity & 3.6.3.a Re Primary Containment Isolation Valves,Per Generic Ltr 89-10 + (ML17289A605)
- ML17289A608 + (ML17289A608)
- 05000397/LER-1992-021, :on 920513,discovered That Certain QC-2 Instruments Were Not Appropriately Isolated from QC-1.Caused by Less than Adequate Design.No Corrective Action Was Taken + (ML17289A612)
- 05000397/LER-1992-022, :on 920514,plant Engineer Determined That Labyrinth Seals Installed in Replacement CAC Blowers Were Not Environmentally Qualified.Caused by Inadequate Work Practices & Procedures.Personnel Counseled + (ML17289A620)
- ML17289A621 + (ML17289A621)
- ML17289A625 + (ML17289A625)
- ML17289A626 + (ML17289A626)
- 05000397/LER-1992-014, :on 920326,920414 & 920512,engineers Identified TS Violations Associated W/Flow Measurements in Hpcs,Lpcs & RHR Sys,Respectively.Caused by Inadequate Design Analysis. Tests Performed to Verify Flows + (ML17289A629)
- ML17289A630 + (ML17289A630)
- ML17289A633 + (ML17289A633)
- ML17289A635 + (ML17289A635)
- ML17289A636 + (ML17289A636)
- ML17289A638 + (ML17289A638)
- ML17289A640 + (ML17289A640)
- IR 05000397/1992017 + (ML17289A642)
- GO2-92-143, Responds to NRC Re Violations Noted in Insp Rept 50-397/92-09.Corrective Actions:Warning Flashing Light Unit Installed & Procedure PPM 11.2.24.1 Changed + (ML17289A643)
- ML17289A645 + (ML17289A645)
- ML17289A647 + (ML17289A647)
- GO2-92-144, Comments on 920609 Telcon Re Fuel Rod Growth in Siemens Nuclear Power (Snp) 8x8 Fuel Assemblies.Util Will Conduct Insp of Subj Assemblies During R8 Refueling Outage,In Ref to 920225 Request for Amend to TS + (ML17289A648)
- 05000397/LER-1992-024, :on 920519,discovered Inadvertent Emergency Ventilation Actuation.Caused by Work Practices Being Less than Adequate.Technicians Were Counseled + (ML17289A650)
- GO2-92-154, Submits Addl Info Re 920318 Application for Amend to License NPF-21,changing TS Surveillance Requirement 4.6.6.1.B.3 to Include Addl Acceptance Criterion for Temp Profile within Hydrogen Recombiner Bed,Per NRC Request + (ML17289A651)
- ML17289A652 + (ML17289A652)
- ML17289A653 + (ML17289A653)
- ML17289A654 + (ML17289A654)
- NL-17-115, Attachment 6 to NL-17-115, Revised HI-2094289, Licensing Report on the Inter-Unit Transfer of Spent Fuel at the Energy Center, Revision 9 + (ML17289A655)
- GO2-92-147, Forwards Rev 14 to WPPSS-QA-004, Operational QA Program Description, Topical Rept + (ML17289A656)
- ML17289A658 + (ML17289A658)
- GO2-92-153, Application for Amend to License NPF-21,relocating Battery Profiles of Surveillance Requirement 4.8.2.1.d.2 to FSAR & Modifying Surveillance Requirement to Refer to FSAR for Specific Details of Profile + (ML17289A660)
- ML17289A661 + (ML17289A661)
- ML17289A663 + (ML17289A663)
- ML17289A665 + (ML17289A665)
- 05000397/LER-1992-017, :on 920508,personnel Determined That Heat Removal Capability of Train a RHR Heat Exchanger Less than Design Allowable.Caused by Insufficient Monitoring of Plant Components.Corrective Actions Not Required + (ML17289A667)
- GO2-92-138, Monthly Operating Rept for May 1992 for WNP Unit 2 + (ML17289A676)
- ML17289A677 + (ML17289A677)
- ML17289A689 + (ML17289A689)
- ML17289A691 + (ML17289A691)
- ML17289A692 + (ML17289A692)
- ML17289A695 + (ML17289A695)
- ML17289A697 + (ML17289A697)
- 05000397/LER-1992-026, :on 920605,determined That Mo of RHR Train a May Have Prevented Full Closure of Drywell Spray Supply Valve.Caused by Inadequate Testing of Plant Equipment.Mo Repaired & Tested to Perform Design Function + (ML17289A698)
- GO2-92-157, Requests Change in Reactor Vessel Capsule Withdrawal Schedule.Since Capsule Missed Some early-in-life Exposure, Placing Capsule in Standby Mode Rather than Being Withdrawn at 24 EFPY Appropriate + (ML17289A699)
- ML17289A700 + (ML17289A700)
- ML17289A702 + (ML17289A702)
- ML17289A703 + (ML17289A703)
- ML17289A705 + (ML17289A705)
- ML17289A707 + (ML17289A707)
- ML17289A708 + (ML17289A708)
- GO2-92-148, Requests Withdrawal of Request for Waiver of Compliance from TS 3.6.5.1.a to Facilitate Testing of Movs,Per Generic Ltr 89-10,per .Problems W/Test Equipment Cannot Be Resolved within Time Frame to Support Testing + (ML17289A709)
- ML17289A710 + (ML17289A710)