Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-83-264, Forwards GE Affidavit Indicating Reasons Why Util Re Fuel Rod Corrosion Measures Is Proprietary.Ge Re Fuel Rod Control Measures Encl + (ML17277A520)
- GO2-83-249, Forwards Rev 1 to Reverification Instruction QVI-09, Special Structural Steel Reinsp Criteria. Instruction Describes Exceptions Taken to Aws D1.1 During Recent Insp of Structural Steel & Miscellaneous Metal Welds + (ML17277A521)
- ML17277A522 + (ML17277A522)
- ML17277A523 + (ML17277A523)
- GO2-83-266, Forwards marked-up Pages Originally Submitted in Response to NRC Questions 031.139,031.140 & 031.141,closing Out SER Outstanding Issue 10 Re Standby Svc Water Instrumentation & Control Design + (ML17277A525)
- GO2-83-243, Forwards Fire Protection Safe Shutdown Analysis Per 821207 Telcon Discussion.Analysis Utilizes Automatic Depressurization Sys & RHR Loop B Not RCIC & Loop B to Achieve Shutdown.Specific FSAR Revs Being Prepared + (ML17277A526)
- GO2-83-263, Submits Plans for Temporary Deferral of Concrete Block Shielding Wall Const.Fsar Will Be Amended If Any Deferrals Become Deletions + (ML17277A527)
- GO2-83-262, Informs That Recheck Confirmed Turbine Bldg Crane MT-CRA-1 Conformance W/All Seven Guidelines of NUREG-0612 + (ML17277A528)
- GO2-83-244, Forwards Rewrite of FSAR Chapter 4,Sections 4.1 - 4.4 Re Reactor.Info Will Be Incorporated Into FSAR Amend 30 to Be Issued in June 1983 + (ML17277A529)
- GO2-83-248, Forwards Emergency Operating Procedures Package,Consisting of Emergency Procedure guidelines,plant-specific Writers Guide for Emergency Procedures,Procedure Validation Program & Procedure Training Program,Per Generic Ltr 82-33 + (ML17277A530)
- ML17277A531 + (ML17277A531)
- ML17277A532 + (ML17277A532)
- GO2-83-247, Forwards Plant Procedures 1.3.1,1.3.6,1.3.7,1.3.8,1.3.9 & 1.5.1 to Close Out SER (NUREG-0892) Confirmatory Issue 22, Assurance of ESF Functioning (II.K.1.5) & Safety-Related Sys Operability Status (II.K.1.10) + (ML17277A533)
- ML17277A534 + (ML17277A534)
- ML17277A535 + (ML17277A535)
- ML17277A536 + (ML17277A536)
- ML17277A537 + (ML17277A537)
- ML17277A538 + (ML17277A538)
- ML17277A539 + (ML17277A539)
- ML17277A540 + (ML17277A540)
- ML17277A544 + (ML17277A544)
- ML17277A547 + (ML17277A547)
- ML17277A549 + (ML17277A549)
- GO2-83-342, Forwards Control Room Design Review Preliminary Rept, in Response to 821217 Generic Ltr 82-33, Suppl 1 to NUREG-0737,Requirements for Emergency Response Capability + (ML17277A550)
- ML17277A551 + (ML17277A551)
- ML17277A552 + (ML17277A552)
- GO2-83-312, Forwards Rev 2 of marked-up Draft Tech Specs App A,Sections 1,2,3,4,5 & 6.Util Review Has Been Incorporated to Ensure That Rev Addresses Unit 2 Uniquely & Meets Requirements of STS,NUREG-0123 + (ML17277A553)
- GO2-83-338, Forwards Rept of Audit 2 of WPPSS Plant Verification Program for WPPSS Unit 2 + (ML17277A556)
- ML17277A557 + (ML17277A557)
- ML17277A558 + (ML17277A558)
- GO2-83-326, Forwards Rev 2 to Electrical Separation Practices. FSAR Section 8.3.1.4 Will Be Revised to Incorporate Matl + (ML17277A559)
- ML17277A560 + (ML17277A560)
- ML17277A561 + (ML17277A561)
- GO2-83-339, Forwards Summary Review of Actions Taken to Assure Quality of safety-related Const & to Meet Commitments Made to Commission in ,Per 10CFR50.54(f).Actions Included in Restart & Quality Verification Programs + (ML17277A563)
- ML17277A564 + (ML17277A564)
- GO2-83-401, Forwards Vol 4 to WPPSS Nuclear Project 2 Preservice Insp Program Plan,Summary Rept, Documenting Completion of Approx 98% of Volumetric & Surface Exams,Repairs & Replacements & Including Request for Relief PSI-2-001 + (ML17277A566)
- ML17277A567 + (ML17277A567)
- ML17277A568 + (ML17277A568)
- GO2-83-408, Responds to Re TMI Action Item II.K.3.18, Mods to ADS Sys Logic. One of Two Options (2 or 4) Will Be Implemented.Choice Based on Benefit to Design Impact on Schedule,Availability of Hardware & Analysis & Total Cost + (ML17277A571)
- GO2-83-277, Forwards Amend 29 to FSAR + (ML17277A572)
- ML17277A576 + (ML17277A576)
- GO2-83-417, Forwards marked-up FSAR Pages Describing Equipment for Sampling & Monitoring Process & Effluent Streams During Postulated Accidents.Submittal Closes Out Commitment in Section 11.5.2 (Page 11-14) of SER,NUREG-0892 + (ML17277A577)
- GO2-83-420, Forwards Burns & Roe Drawing H501 Defining Jurisdictional Boundary Between Nf & AISC for Supports.W/O Encl + (ML17277A578)
- ML17277A582 + (ML17277A582)
- ML17277A583 + (ML17277A583)
- ML17277A585 + (ML17277A585)
- GO2-83-337, Clarifies Responses to NUREG-0612, Control of Heavy Loads. Turbine Crane MT-CRA-1 Meets Guidelines of NUREG + (ML17277A586)
- ML17277A587 + (ML17277A587)
- GO2-83-433, Advises That Tech Spec 3/4.10.1, Primary Containment Integrity, Will Be Limiting Condition for Operation During Primary Containment Integrated Leak Rate Preoperational & Startup Testing Program + (ML17277A588)
- GO2-83-346, Forwards Proposed Schedule Re Current Status of Emergency Response Capability Per Region V 830301 Meeting (Generic Ltr 82-33 & Suppl 1 to NUREG-0737) + (ML17277A589)
- GO2-83-345, Forwards Descriptions of Responsibilities of Nuclear Safety Assurance Group,In Confirmation of 830209 Meeting.Encl Provides Revised Response to TMI Items I.B.1.2 & I.C.5 + (ML17277A590)