ML17277A544

From kanterella
Jump to navigation Jump to search
Notification of 830420 Meeting W/Util in Bethesda,Md to Discuss Status of Independent Design Verification Program
ML17277A544
Person / Time
Site: Columbia 
Issue date: 04/07/1983
From: Rajender Auluck
Office of Nuclear Reactor Regulation
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8304150005
Download: ML17277A544 (6)


Text

~ aft+

19

~e APR' 1983 D)STRIBUTION:

See next page Docket No.:

50-397 HEHORANDUH FOR:

A. Schwencer, Chief Licensing Branch No.

2 Di'vision of Licensing FROf1:

SUBJECT:

DATE fIt TIHE:

LOCATION:

PURPOSE:

R. Auluck, Prospect f<anager Licensing Branch No.

2 Division of Licensing FORTHCOHING HEETING WITH WASHINGTON PUBLIC POWER SUPPLY SYSTEfl (WPPSS)

April 20, 1983 9:00 am - 1:00 pm thNBB 6110

Bethesda, flD Presentation by WPPSS ffanagement on the status of Independent Design Verification Program (IDVP) for WNP-2.

PARTICI PANTS:

NRC T. Novak A. Schwencer J..Taylor/WHaass RVollmer/ESullivan WHouston/TCollins JCrews/RDodds R. Auluck HPPSS J.

Hoaekamp S

support staff

(./

'6iigiriaXe~e4'by!

cc:

See next page R. Aul.uck, Prospect flanager Licensing Branch No.

2 Division of Licensing 83041 50005 830407 PDR ADOCK 05000397 OFFICE/

EURNAME$

DATEf D.L (H

ck: pt 4 g/83 NRC FORM 318 (10-80) NRCM 0240 I

DL: B¹2/BC ASc wencei 4

/83

~

~

~

~

OFFlCIAf RECORD COPY USGPO: 1991~9.960

~ ~ ~

~

1 t

~ ~

~

~ y ~I~ 4 ~

bp 1

I L

MHP-2 fear.

R. L. Ferguson t'anaging Director Washington Public Power Supply System P. 0. Box 968 3000 George Mashington May

Richland, Washington 99352 CC:

Nicholas Reynolds, Esquire Debevoise 5 Liberman 1200 Seven'teenth

Street, N.

W.

Washington, D. C.

20036 lIr'. G.E.

Doupe, Esquire Washington Public Power Supply System P.O.

Box 968 3000 George Washington May

Richland,

'Washington 99352 Nicholas Lewi s, Chqirman

'Energy Facility Site Evaluation Council hail Stop PY-ll Olympi a, Washington 98504 Roger Nelson, Licensing tlanager Washington Public Power Supply System P.O.

Box 968

Richland, Mashington 99352 fir. W.G. Conn, Sr.

H/M Group Supervisor Burns. and Roe, Incorporated 691 Williams Boulevard

Richland, Mashington 99352 i~r. Richard Feil U.S.

HRC Resident Inspector MPPSS-2 HPS P.O.

Box 69 Richl and, Washington 99352 Dr. G.D.

Bouchey Deputy Director, Safety 5 Security

)washington Public Power Supply System P.O.

Box 968, tlD 650

Richland, Washington 99352

p7 l'

~

~

MEETING NOTI'CE DISTRIBUTION:

Vr APR 7

egg Date:

',Document Control (50- 395>.

NRC PDR L PDR NSIC PRC LB82 Reading E. Hylton Project Manager R. Auluck H, Denton/E.

Case D. Eisenhut/R.

Purple T.'. Novak*

B. Youngblood A. Schwencer G. Knighton E. Adensam G. Lainas F. Miragl ia J.

P. Kniglit W. JoFinston D. Muller T. Speis R. Houston L. Rubenstes".n F. Schroeder M. Ernst J.

Kramer NRR Division Directors*

A YJb'.

L. Jordan, DEQA:IE J.

M. Taylor, DRP:IE Phillips 'Building Receptionist*"

ACRS (16)

Region V

Resident Inspector NRC PARTICIPANTS:

T. Novak A. Schwencer J. Taylor/W. Haass R. Vollmer/E. Sullivan W. Houston/T. Collins J.

Crews/R.

Dodds R. Auluck cc:

Service Ltst

  • Only if participant in meeti'ng
    • Onlyif meeting held in Bethesda

00 k,

v

~

~

~

'i