Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17276B683 + (ML17276B683)
- ML17276B684 + (ML17276B684)
- GO2-82-825, Forwards Recommendations on Proposed Plant Operating Procedure Changes,Equipmemt Mods & Discussion of Design Basis Ashfall.Advance Warning Arrangements in Section Ii.A. Fulfill Commitment Per Supplemental SER Section 2.5.1.3.1 + (ML17276B686)
- GO2-82-823, Informs That Hydrostatic Test of Diesel Engine Auxiliary Piping to 125% of Design Pressure Performed,In Response to Supplemental SER Item 9.5.4.1,Open Item 15 & FSAR Question 040.084.Exemption Requested for Intake & Exhaust Lines + (ML17276B687)
- GO2-82-822, Advises That Section 14.2.14.3.17 Will Be Amended to Remove Any Ref to Containment Hot Pipe Penetration Testing.Ser Outstanding Issue 21 (NUREG-0892) Closed W/O Need for Acceptance Criteria.Diagrams Re Penetration Assembly Encl + (ML17276B688)
- GO2-82-839, Confirms 821005 Telcon Re Use of ASME Code Case N-310-1, Certification of Bolting Matls Section Iii,Div 1,Class 1, 2,3,MC & Cs. Util Will Implement Code Case as Agreed + (ML17276B689)
- ML17276B690 + (ML17276B690)
- ML17276B693 + (ML17276B693)
- GO2-82-864, Forwards Revision 1 to Plant Verification Rept, Dtd Oct 1982 + (ML17276B695)
- ML17276B697 + (ML17276B697)
- GO2-82-865, Forwards Revision 1 to Plant Verification Rept, Dtd Oct 1982 + (ML17276B698)
- ML17276B699 + (ML17276B699)
- ML17276B700 + (ML17276B700)
- ML17276B701 + (ML17276B701)
- ML17276B705 + (ML17276B705)
- GO2-82-874, Forwards marked-up Section 8.3 to FSAR Amend 23,clarifying Electrical Separation Issues,Per 821006 Meeting.Changes Will Be Incorporated Into Future FSAR Amend + (ML17276B706)
- GO2-82-827, Forwards Dynamic Qualification Rept for Safety-Related Equipment, Vols I & Ii.Rept Will Be Incorporated Into FSAR Amend + (ML17276B707)
- ML17276B708 + (ML17276B708)
- ML17276B709 + (ML17276B709)
- ML17276B712 + (ML17276B712)
- ML17276B713 + (ML17276B713)
- ML17276B715 + (ML17276B715)
- GO2-82-880, Forwards Pump & Valve Operability Assurance Review Audit Forms,In Response to 820809 Request for Addl Info.Components Identified by Eg&G Via Telcon.Valves MS-RV-1A & RCIC-V-19 Not Installed.Remaining Components Installed + (ML17276B716)
- GO2-82-886, Informs of Option Selected to Justify Use of Square Root of Sum of Squares Method for Combining Dynamic Responses Due to Seismic & Hydrodynamic Loads,Per NRC 820722 Request. Generation of Cumulative Distribution Functions Chosen + (ML17276B718)
- ML17276B719 + (ML17276B719)
- ML17276B726 + (ML17276B726)
- GO2-82-900, Advises That 821022 Meeting W/Yakima Indian Nation to Discuss Offsite Emergency Planning Not Held.Yakima Indian Nation Either Unable or Unwilling to Meet.Meeting Not Rescheduled + (ML17276B727)
- GO2-82-907, Forwards Proprietary Three-H Fire Endurance Tests on Thermo-Log 330-1 Subliming Coating Envelope Sys. Rept Withheld (Ref 10CFR2.790) + (ML17276B728)
- GO2-82-899, Requests Limited Exemption from Emergency Notification Requirements in 10CFR50,App E.Proposed Prompt Notification Sys Achieves Objectives of App E at 10% of Cost.Nearest Residents Located 4 Miles from Plant.Assessment Encl + (ML17276B732)
- GO2-82-936, Responds to NRC Re Resolution of Licensing Review Group II Issue 3-CPB Concerning Channel Box Deflection.Util Channel Mgt Program for Facility Discussed + (ML17276B734)
- GO2-82-940, Forwards GE Svc Info Ltr 382 Re Deletion of Electronic Overspeed Trip Package Based on Seismic Qualification Review Team Audit + (ML17276B735)
- ML17276B736 + (ML17276B736)
- ML17276B737 + (ML17276B737)
- GO2-82-943, Forwards Revised Schedule for Responding to Questions 031.135 - 031.138 Re IE Bulletins 79-27 & 80-06 & IE Info Notice 79-22 + (ML17276B738)
- ML17276B739 + (ML17276B739)
- GO2-82-961, Forwards Util 800616 & 1212 & 810320 & 0408 Ltrs Re Emergency Response Facilities (ERF) in Response to Generic Ltr 81-10,per NRC Request.Util Does Not Plan to Provide Backup Erf.Requested Info Provided + (ML17276B741)
- ML17276B745 + (ML17276B745)
- ML17276B748 + (ML17276B748)
- GO2-82-946, Responds to 821027 SALP Rept.Corrective Actions:Task Force Established to Revisit Electrical Separation & Follow Up Surveillances on Const Deficiency Repts Incorporated Into Project QA + (ML17276B750)
- ML17276B751 + (ML17276B751)
- GO2-82-976, Forwards Responses to NRC Questions 010.067 Through 010.074 Re Internally Generated Missiles,Per 821209 Commitment. Responses Close Out Outstanding Issue 2 in SER,NUREG-0892 + (ML17276B752)
- GO2-82-975, Responds to NRC Question 010.066 Re Pipe Break in BWR Scram Sys (NUREG-0803).Response to Questions 010.067 - 010.074 Will Be Submitted Under Separate Cover During Dec 1982 + (ML17276B753)
- GO2-82-977, Responds to Telephone Request for Info Re Analytical Models Used to Predict Forcing Functions & Response of drywell-to-wetwell Vacuum Breakers.Final Rept to Be Provided Following Completion of Vacuum Breaker Mod + (ML17276B754)
- ML17276B755 + (ML17276B755)
- GO2-82-974, Forwards marked-up Revision to FSAR Section 8.3.1.4 Reflecting Analysis Justification for coil-to-contact Relay Isolation Between Redundant Class IE Circuits & Revision 0 to Electrical Separation Practices + (ML17276B756)
- ML17276B757 + (ML17276B757)
- ML17276B758 + (ML17276B758)
- ML17276B759 + (ML17276B759)
- GO2-82-967, Forwards Summary Info Re Containment Vessel out-of-roundness Issue Raised During Litigation Following Termination of Contract 206 Per R Auluck request.Out-of-roundness Will Have No Detrimental Effect on Structural Capacity + (ML17276B762)
- ML17276B763 + (ML17276B763)
- GO2-82-968, Forwards Sweepolet Stress Calculation Per SER,NUREG-0892, Confirmatory Issue 6 & 820930 Telcon + (ML17276B764)