- GO2-82-285, Responds to J Rosenthal 820219 Concerns Re on Rod Block Monitors.Rod Block Monitor Sys Design Is Similar to Zimmer Design.Facility Sys Has Been Reviewed & Resolution Provided + (ML17276B342)
- GO2-82-280, Forwards Schematic Re Various Supplies & Flow Paths for Facility Control Room Chillers Per 820226 Request.Control Room Cooling Sys Consists of Two Redundant Room Coolers & Chilled Water Supply Sys + (ML17276B343)
- GO2-82-314, Responds to 820305 Telcon.Submits Info Re Training Program for Shift Support Supervisor Per SER Open Items.Course Outlines for BWR Sys Analysis & Sys & Procedures Encl + (ML17276B345)
- ML17276B348 + (ML17276B348)
- GO2-82-324, Forwards Burns & Roe Review of BNL Comments Re Effects of Desynchronization Methodology Used in Generic & plant-unique Chugging Load Specs,Per Mark II Owners Group 820209 Meeting. Structural Responses Not Significant + (ML17276B349)
- GO2-82-327, Forwards Two Sections of Util 820201 Draft Tech Specs, Omitted Due to Duplication Errors + (ML17276B362)
- ML17276B367 + (ML17276B367)
- GO2-82-239, Forwards Revised FSAR Pages Describing Jet Area Based on Target Location to Replace Page 3.6-46 + (ML17276B370)
- GO2-82-237, Forwards Response to SER Question 23 Amending Util 820114 Response Re Criteria for balance-of-plant & NSSS Tables. Info Will Be Incorporated + (ML17276B371)
- GO2-82-344, Forwards Review of Summary of Conformance to NRC Regulations of 10CFR20,50 & 100 + (ML17276B372)
- ML17276B373 + (ML17276B373)
- ML17276B374 + (ML17276B374)
- IR 05000397/1979010 + (ML17276B377)
- GO2-82-319, Submits Revised Response to NRC Re Violations Noted in IE Insp Repts 50-397/79-10 & 50-397/80-08. Corrective Actions:Piping post-weld Heat Treatment Will Follow Bechtel Procedures + (ML17276B379)
- ML17276B382 + (ML17276B382)
- ML17276B385 + (ML17276B385)
- ML17276B390 + (ML17276B390)
- GO2-82-323, Forwards Public Version of Followup Emergency Plan Info Re Relation of Containment Radiation Levels to Core Damage,In Response to NRC 820208 Telcon Request + (ML17276B392)
- GO2-82-351, Forwards Results of Recomputed Condensation Oscillation Load Analysis & Comparisons of Chugging & Load in Terms of Bldg Acceleration Response Spectra for Three Representative Critical Locations,In Response to NRC 820302 Request + (ML17276B394)
- GO2-82-362, Forwards Study Results Re Comparison of Structural Response to Symmetric & Asymmetric Chugging & Seismic Loads.Results Show Similarity of Responses Between Load Cases + (ML17276B395)
- GO2-82-367, Advises That Decision Re Resolution of Vacuum Breaker Cycling Will Be Issued by 820715.Decision Pending Outcome of Generic Programs to Establish Structural Capacity of Vacuum Breakers for Mark II Facilities + (ML17276B396)
- GO2-82-373, Forwards Transmittal Ltr & Certificate of Svc for Amend 22 to FSAR + (ML17276B399)
- ML17276B400 + (ML17276B400)
- ML17276B401 + (ML17276B401)
- ML17276B405 + (ML17276B405)
- ML17276B407 + (ML17276B407)
- GO2-82-383, Forwards Corporate Organizational Changes Reflecting Planned Evolution as Operation Nears.Changes Will Be Reflected in Next FSAR Amend + (ML17276B409)
- GO2-82-368, Confirms Info Re Sys Training & Procedures for Shift Support Supervisor,Per 820322 Telcon.Sys & Procedures Will Be Included in Simulator Training + (ML17276B411)
- ML17276B412 + (ML17276B412)
- GO2-82-395, Forwards Revised Initial Response to NUREG-0803, Safety Concerns Associated W/Pipe Breaks in BWR Scram Sys + (ML17276B415)
- ML17276B416 + (ML17276B416)
- GO2-82-396, Submits Info in Response to SER Re FSAR Section 9.5.1,fire Protection Program.Keene Corp Concerning Burns & Roe Request for Info on Fire Rated Doors Encl + (ML17276B418)
- ML17276B419 + (ML17276B419)
- ML17276B421 + (ML17276B421)
- ML17276B424 + (ML17276B424)
- ML17276B425 + (ML17276B425)
- GO2-82-400, Forwards Specific Discussions Supplementing FSAR W/Addl Geologic Info,Per Geosciences Branch Verbal Requests + (ML17276B426)
- ML17276B427 + (ML17276B427)
- ML17276B428 + (ML17276B428)
- ML17276B430 + (ML17276B430)
- ML17276B431 + (ML17276B431)
- GO2-82-421, Documents NRC Approval of ASME Code Case N-328, Thermit Brazing or Welding of Nonstructural Attachments, to Be Implemented on Nuclear Project 2 + (ML17276B433)
- GO2-82-427, Forwards Revisions to Min Shift Crew & Staffing Plan, Reflecting 820208 Generic Ltr 82-02, Nuclear Power Plant Staff Working Hours, Guidelines + (ML17276B435)
- GO2-82-437, Forwards Transmittal Ltr & Certificate of Svc for Amend 23 to FSAR + (ML17276B436)
- GO2-82-422, Forwards Amend 23 to FSAR + (ML17276B437)
- IR 05000397/1981003 + (ML17276B442)
- GO2-82-409, Revises 810904 Response to NRC Re Violations Noted in IE Insp Rept 50-397/81-03.Requests Extension to 820730 to Make Corrective Actions,Incorporating Changes Into Spec Control List & Drawing Control List + (ML17276B444)
- GO2-82-436, Forwards Info Re Control Rod Drive Sys Line Break,Missile Protection of Equipment & UHS Capabilities During Seismic Tornado Events.Info Closes Out SER Outstanding Issue 1.7(28), Pipe Break in BWR Scram Sys + (ML17276B445)
- GO2-82-447, Transmits Results of Analysis of Remote Shutdown Sys to Close SER Open Item.Util Will Perform Listed Mods During First Refueling Outage + (ML17276B446)
- GO2-82-454, Forwards Revised Response to NRC Question 361.016 Re Ground Motion.Response Informally Transmitted on 820510 & Will Be Incorporated Into FSAR Amend 27 + (ML17276B447)
- GO2-82-446, Provides Justification for Adequacy of Present Design Re Tornado Missile Protection for Diesel Generator Exhausts. New SRP Requirement Should Not Be Imposed.Removal of Item from SER Outstanding Issue List Requested.Rept Encl + (ML17276B448)