Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-82-281, Confirms Info Provided During 820301 Telcon Re Containment Instrument Air Sys Design Compliance W/Reg Guide 1.80 & ANSI Std MC11.1-1975.Sys Design Complies W/Reg Guide & Is Being Redesigned to Supply Nitrogen Gas from Cryogenic Source + (ML17276B341)
- GO2-82-285, Responds to J Rosenthal 820219 Concerns Re on Rod Block Monitors.Rod Block Monitor Sys Design Is Similar to Zimmer Design.Facility Sys Has Been Reviewed & Resolution Provided + (ML17276B342)
- GO2-82-280, Forwards Schematic Re Various Supplies & Flow Paths for Facility Control Room Chillers Per 820226 Request.Control Room Cooling Sys Consists of Two Redundant Room Coolers & Chilled Water Supply Sys + (ML17276B343)
- GO2-82-314, Responds to 820305 Telcon.Submits Info Re Training Program for Shift Support Supervisor Per SER Open Items.Course Outlines for BWR Sys Analysis & Sys & Procedures Encl + (ML17276B345)
- ML17276B348 + (ML17276B348)
- GO2-82-324, Forwards Burns & Roe Review of BNL Comments Re Effects of Desynchronization Methodology Used in Generic & plant-unique Chugging Load Specs,Per Mark II Owners Group 820209 Meeting. Structural Responses Not Significant + (ML17276B349)
- GO2-82-327, Forwards Two Sections of Util 820201 Draft Tech Specs, Omitted Due to Duplication Errors + (ML17276B362)
- ML17276B367 + (ML17276B367)
- GO2-82-239, Forwards Revised FSAR Pages Describing Jet Area Based on Target Location to Replace Page 3.6-46 + (ML17276B370)
- GO2-82-237, Forwards Response to SER Question 23 Amending Util 820114 Response Re Criteria for balance-of-plant & NSSS Tables. Info Will Be Incorporated + (ML17276B371)
- GO2-82-344, Forwards Review of Summary of Conformance to NRC Regulations of 10CFR20,50 & 100 + (ML17276B372)
- ML17276B373 + (ML17276B373)
- ML17276B374 + (ML17276B374)
- IR 05000397/1979010 + (ML17276B377)
- GO2-82-319, Submits Revised Response to NRC Re Violations Noted in IE Insp Repts 50-397/79-10 & 50-397/80-08. Corrective Actions:Piping post-weld Heat Treatment Will Follow Bechtel Procedures + (ML17276B379)
- ML17276B382 + (ML17276B382)
- ML17276B385 + (ML17276B385)
- ML17276B390 + (ML17276B390)
- GO2-82-323, Forwards Public Version of Followup Emergency Plan Info Re Relation of Containment Radiation Levels to Core Damage,In Response to NRC 820208 Telcon Request + (ML17276B392)
- GO2-82-351, Forwards Results of Recomputed Condensation Oscillation Load Analysis & Comparisons of Chugging & Load in Terms of Bldg Acceleration Response Spectra for Three Representative Critical Locations,In Response to NRC 820302 Request + (ML17276B394)
- GO2-82-362, Forwards Study Results Re Comparison of Structural Response to Symmetric & Asymmetric Chugging & Seismic Loads.Results Show Similarity of Responses Between Load Cases + (ML17276B395)
- GO2-82-367, Advises That Decision Re Resolution of Vacuum Breaker Cycling Will Be Issued by 820715.Decision Pending Outcome of Generic Programs to Establish Structural Capacity of Vacuum Breakers for Mark II Facilities + (ML17276B396)
- GO2-82-373, Forwards Transmittal Ltr & Certificate of Svc for Amend 22 to FSAR + (ML17276B399)
- ML17276B400 + (ML17276B400)
- ML17276B401 + (ML17276B401)
- ML17276B405 + (ML17276B405)
- ML17276B407 + (ML17276B407)
- GO2-82-383, Forwards Corporate Organizational Changes Reflecting Planned Evolution as Operation Nears.Changes Will Be Reflected in Next FSAR Amend + (ML17276B409)
- GO2-82-368, Confirms Info Re Sys Training & Procedures for Shift Support Supervisor,Per 820322 Telcon.Sys & Procedures Will Be Included in Simulator Training + (ML17276B411)
- ML17276B412 + (ML17276B412)
- GO2-82-395, Forwards Revised Initial Response to NUREG-0803, Safety Concerns Associated W/Pipe Breaks in BWR Scram Sys + (ML17276B415)
- ML17276B416 + (ML17276B416)
- GO2-82-396, Submits Info in Response to SER Re FSAR Section 9.5.1,fire Protection Program.Keene Corp Concerning Burns & Roe Request for Info on Fire Rated Doors Encl + (ML17276B418)
- ML17276B419 + (ML17276B419)
- ML17276B421 + (ML17276B421)
- ML17276B424 + (ML17276B424)
- ML17276B425 + (ML17276B425)
- GO2-82-400, Forwards Specific Discussions Supplementing FSAR W/Addl Geologic Info,Per Geosciences Branch Verbal Requests + (ML17276B426)
- ML17276B427 + (ML17276B427)
- ML17276B428 + (ML17276B428)
- ML17276B430 + (ML17276B430)
- ML17276B431 + (ML17276B431)
- GO2-82-421, Documents NRC Approval of ASME Code Case N-328, Thermit Brazing or Welding of Nonstructural Attachments, to Be Implemented on Nuclear Project 2 + (ML17276B433)
- GO2-82-427, Forwards Revisions to Min Shift Crew & Staffing Plan, Reflecting 820208 Generic Ltr 82-02, Nuclear Power Plant Staff Working Hours, Guidelines + (ML17276B435)
- GO2-82-437, Forwards Transmittal Ltr & Certificate of Svc for Amend 23 to FSAR + (ML17276B436)
- GO2-82-422, Forwards Amend 23 to FSAR + (ML17276B437)
- IR 05000397/1981003 + (ML17276B442)
- GO2-82-409, Revises 810904 Response to NRC Re Violations Noted in IE Insp Rept 50-397/81-03.Requests Extension to 820730 to Make Corrective Actions,Incorporating Changes Into Spec Control List & Drawing Control List + (ML17276B444)
- GO2-82-436, Forwards Info Re Control Rod Drive Sys Line Break,Missile Protection of Equipment & UHS Capabilities During Seismic Tornado Events.Info Closes Out SER Outstanding Issue 1.7(28), Pipe Break in BWR Scram Sys + (ML17276B445)
- GO2-82-447, Transmits Results of Analysis of Remote Shutdown Sys to Close SER Open Item.Util Will Perform Listed Mods During First Refueling Outage + (ML17276B446)
- GO2-82-454, Forwards Revised Response to NRC Question 361.016 Re Ground Motion.Response Informally Transmitted on 820510 & Will Be Incorporated Into FSAR Amend 27 + (ML17276B447)