Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17076A178 + (ML17076A178)
- 05000373/LER-2017-002, Regarding Secondary Containment Inoperable Due to Interlock Doors Open + (ML17076A183)
- ML17076A186 + (ML17076A186)
- ML17076A198 + (ML17076A198)
- ML17076A216 + (ML17076A216)
- RA-17-029, Cycle 17 Core Operating Limits Report (COLR) + (ML17076A255)
- ML17076A338 + (ML17076A338)
- ML17076A359 + (ML17076A359)
- ML17076A370 + (ML17076A370)
- ML17076A375 + (ML17076A375)
- ML17076A376 + (ML17076A376)
- IR 05000498/2017301 + (ML17076A426)
- 05000341/LER-2017-002, Regarding High Water Level Indications at Low Reactor Pressures Causes Some Functions of High Pressure Coolant Injection System and Reactor Core Isolation Cooling System to Be Inoperable + (ML17076A431)
- ML17076A432 + (ML17076A432)
- ML17076A434 + (ML17076A434)
- 05000341/LER-2016-003, Cancellation of Licensee Event Reports (Lers) for Secondary Containment Wind Events: LER-16-003, LER 16-004, LER 16-007, Er 16-008, LER 16-010, LER 16-013; LER 16-014, LER 15-015, LER 16-016 and LER 16-017 + (ML17079A003)
- ML17079A009 + (ML17079A009)
- ML17079A016 + (ML17079A016)
- IR 05000352/2017301 + (ML17079A017)
- Press Release-I-17-005, NRC to Hold Pilgrim Nuclear Plant Public Exit Meeting for Inspection, Annual Assessment Discussion + (ML17079A020)
- Press Release-I-17-006, NRC to Conduct Open House to Discuss 2016 Performance of Beaver Valley Nuclear Power Plant + (ML17079A021)
- Press Release-17-012, NRC to Begin Full Certification Review of NuScale Small Modular Reactor + (ML17079A022)
- Press Release-17-013, NRC Extends Public Involvement Opportunities for Waste Control Specialists Spent Fuel Storage Application + (ML17079A023)
- ML17079A037 + (ML17079A037)
- ML17079A040 + (ML17079A040)
- IR 05000413/2017007 + (ML17079A044)
- RS-17-005, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal + (ML17079A052)
- Press Release-I-17-007, NRC to Discuss 2016 Performance at Millstone Station Meeting with Connecticut Nuclear Energy Advisory Council + (ML17079A088)
- ML17079A101 + (ML17079A101)
- ML17079A109 + (ML17079A109)
- ML17079A110 + (ML17079A110)
- ML17079A111 + (ML17079A111)
- ML17079A112 + (ML17079A112)
- ML17079A113 + (ML17079A113)
- ML17079A115 + (ML17079A115)
- ML17079A116 + (ML17079A116)
- ML17079A117 + (ML17079A117)
- ML17079A118 + (ML17079A118)
- ML17079A119 + (ML17079A119)
- ML17079A120 + (ML17079A120)
- ML17079A121 + (ML17079A121)
- ML17079A122 + (ML17079A122)
- RS-17-032, Response to Request for Additional Information Regarding the License Amendment Request to Utilize the TORMIS Computer Code Methodology + (ML17079A130)
- ML17079A134 + (ML17079A134)
- ML17079A136 + (ML17079A136)
- HCH-2017-011, Residuals Discharge Monitoring Report, SL1A STP Monitoring System + (ML17079A138)
- CNS-17-008, Commitment Change Evaluation Report for 2016 + (ML17079A139)
- ML17079A142 + (ML17079A142)
- FOIA/PA-2016-0736 + (ML17079A150)
- ML17079A154 + (ML17079A154)
- ML17079A164 + (ML17079A164)