Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000390/2014405 + (ML14252A491)
- ML14252A500 + (ML14252A500)
- ML14252A521 + (ML14252A521)
- ML14252A528 + (ML14252A528)
- ML14252A537 + (ML14252A537)
- ML14252A556 + (ML14252A556)
- ML14252A560 + (ML14252A560)
- ML14252A570 + (ML14252A570)
- ML14252A573 + (ML14252A573)
- ML14252A594 + (ML14252A594)
- OI 1-2014-003, NRC Office of Investigations Case No. 1-2014-003 (RI-2013-A-0082) + (ML14252A638)
- ML14252A643 + (ML14252A643)
- ML14252A703 + (ML14252A703)
- ML14252A721 + (ML14252A721)
- IR 05000219/2014405 + (ML14252A732)
- ML14252A743 + (ML14252A743)
- ML14252A760 + (ML14252A760)
- ML14252A805 + (ML14252A805)
- 05000219/LER-2014-001, Regarding Manual Scram Due to Lowering Vacuum + (ML14252A843)
- ML14252A878 + (ML14252A878)
- ML14252A892 + (ML14252A892)
- ML14252A893 + (ML14252A893)
- ML14252A898 + (ML14252A898)
- ML14252A901 + (ML14252A901)
- ML14252A905 + (ML14252A905)
- ML14252A910 + (ML14252A910)
- ML14253A006 + (ML14253A006)
- ML14253A014 + (ML14253A014)
- ML14253A015 + (ML14253A015)
- ML14253A016 + (ML14253A016)
- ML14253A048 + (ML14253A048)
- IR 05000298/2014202 + (ML14253A079)
- ML14253A117 + (ML14253A117)
- IR 05000313/2014009 + (ML14253A122)
- NL-14-002, Enclosure - NL-14-002, SAMA Engineering Project Cost Estimates Prepared by RCM Technologies + (ML14253A153)
- RNP-RA/14-0083, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (ML14253A161)
- L-2014-243, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (ML14253A162)
- L-2014-277, Inservice Inspection Plan, RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 17 + (ML14253A182)
- L-2014-274, Third Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) + (ML14253A184)
- ML14253A185 + (ML14253A185)
- CP-201401051, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML14253A186)
- MNS-14-067, Third Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML14253A187)
- MNS-14-066, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (ML14253A188)
- ML14253A189 + (ML14253A189)
- ML14253A208 + (ML14253A208)
- RBG-47501, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML14253A209)
- RBG-47502, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (ML14253A210)
- CP-201401035, Relief Requests Nos. B-7, B-12 and B-13 for the Second 10-Year ISI Interval (Second ISI Interval Start Date: August 3, 2004; Second ISI Interval End Date: August 2, 2014) + (ML14253A211)
- L-2014-270, Response to Request for Additional Information Re License Amendment Request for Transition to 10CFR50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for LWR Generating Plants + (ML14253A216)
- RC-14-0142, Withdrawal of License Amendment Request LAR-13-02396, Request for NRC Approval of Radiation Emergency Plan Change + (ML14253A221)
- BSEP 14-0098, Independent Spent Fuel Storage Installation (ISFSI) - Registration and Use of Casks to Store Spent Fuel + (ML14253A223)