Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13079A185 + (ML13079A185)
- ML13079A186 + (ML13079A186)
- ML13079A190 + (ML13079A190)
- ML13079A214 + (ML13079A214)
- ML13079A215 + (ML13079A215)
- ML13079A216 + (ML13079A216)
- ML13079A217 + (ML13079A217)
- ML13079A218 + (ML13079A218)
- ML13079A219 + (ML13079A219)
- ML13079A226 + (ML13079A226)
- ML13079A227 + (ML13079A227)
- ML13079A233 + (ML13079A233)
- ML13079A238 + (ML13079A238)
- ML13079A247 + (ML13079A247)
- L-13-119, LER 13-S01-00 for Perry Nuclear Power Plant, Unit 1, Regarding Local Power Range Monitors Delivered to the Incorrect Address + (ML13079A250)
- HNP-13-031, Flooding Hazard Reevaluation Report + (ML13079A253)
- 05000397/LER-2012-006-01, Regarding Both Visions of SDC Isolation Valves Made Inoperable + (ML13079A260)
- 05000397/LER-2013-001, Regarding Secondary Containment Inoperable Due to Both Airlock Doors Being Open + (ML13079A261)
- 05000482/LER-2013-001, Regarding Broken Cylinder Head Stud Causes Inoperable Diesel Generator Longer than Technical Specification Completion Time + (ML13079A262)
- ML13079A267 + (ML13079A267)
- ML13079A282 + (ML13079A282)
- NL-13-0570, Edwin I Hatch, Units 1 & 2, Joseph M. Farley, Units 1 & 2 and Vogtle, Units 1 & 2 - Nuclear Property Insurance Coverage as of April 1, 2013 + (ML13079A286)
- ML13079A293 + (ML13079A293)
- ML13079A297 + (ML13079A297)
- ML13079A320 + (ML13079A320)
- ML13079A321 + (ML13079A321)
- ML13079A329 + (ML13079A329)
- ML13079A330 + (ML13079A330)
- 05000445/LER-2013-001, Regarding Inoperability of Unit Emergency Airlock Exterior Door + (ML13079A331)
- 05000446/LER-2013-001, (Cnpnpp) Regarding Unit 2 Hot Shutdown Panel Transfer Switch Inoperable Due to Wiring Error + (ML13079A332)
- CP-201300286, Submittal of Property Damage Insurance + (ML13079A333)
- NOC-AE-13002969, Response to Requests for Additional Information for Review of License Renewal Application Concerning Wildlife Management (TAC Nos. ME5122 and ME5123) + (ML13079A334)
- ML13079A334 + (ML13079A334)
- 05000499/LER-2013-002, Regarding Reactor Trip Due to Main Transformer Lockout Relay Trip + (ML13079A335)
- ML13079A336 + (ML13079A336)
- ML13079A345 + (ML13079A345)
- ML13079A346 + (ML13079A346)
- NL-13-042, Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (ML13079A348)
- ML13079A361 + (ML13079A361)
- ML13079A362 + (ML13079A362)
- ML13079A372 + (ML13079A372)
- ML13079A449 + (ML13079A449)
- ML13079A488 + (ML13079A488)
- ML13079A496 + (ML13079A496)
- ML13079A497 + (ML13079A497)
- ML13079A500 + (ML13079A500)
- ML13079A501 + (ML13079A501)
- ML13079A505 + (ML13079A505)
- IR 05000416/2012005 + (ML13079A543)
- ML13079A549 + (ML13079A549)
- ML13079A551 + (ML13079A551)