Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML12178A456 + (ML12178A456)
- IR 07200048/2011001 + (ML12178A470)
- ML12178A472 + (ML12178A472)
- ML12178A473 + (ML12178A473)
- ML12178A474 + (ML12178A474)
- ML12178A475 + (ML12178A475)
- ML12178A513 + (ML12178A513)
- Press Release-12-077, Statement of NRC Chairman Gregory B. Jaczko on the Report from the Office of the Inspector General + (ML12178A529)
- ML12178A534 + (ML12178A534)
- ML12178A537 + (ML12178A537)
- 05000335/LER-2012-002, Manual Trip During Physics Testing Due to Unexpected Movement of Control Element Assemblies (Ceas) + (ML12178A550)
- ML12178A557 + (ML12178A557)
- ML12178A564 + (ML12178A564)
- ML12178A567 + (ML12178A567)
- ML12178A595 + (ML12178A595)
- ML12178A613 + (ML12178A613)
- ML12178A614 + (ML12178A614)
- ML12178A628 + (ML12178A628)
- ML12178A660 + (ML12178A660)
- ML12178A661 + (ML12178A661)
- ML12178A662 + (ML12178A662)
- ML121790346 + (ML121790346)
- ML121790429 + (ML121790429)
- ML12179A074 + (ML12179A074)
- ML12179A137 + (ML12179A137)
- ML12179A155 + (ML12179A155)
- ML12179A166 + (ML12179A166)
- ML12179A169 + (ML12179A169)
- ML12179A172 + (ML12179A172)
- ML12179A174 + (ML12179A174)
- ML12179A176 + (ML12179A176)
- ML12179A179 + (ML12179A179)
- ML12179A180 + (ML12179A180)
- ML12179A182 + (ML12179A182)
- ML12179A186 + (ML12179A186)
- NL-12-1321, Special Report 12-001-00 for Edwin I. Hatch, Unit 2, Regarding Post Accident Temperature Instrument Out of Service Greater than 30 Days + (ML12179A187)
- ML12179A188 + (ML12179A188)
- IR 05000333/2012404 + (ML12179A192)
- ML12179A196 + (ML12179A196)
- ML12179A210 + (ML12179A210)
- 05000482/LER-2012-003, Regarding B Train ECCS and Containment Spray System Inoperable Due to Damaged Watertight Containment Spray Pump Door Seal + (ML12179A215)
- L-12-252, Readiness for NRC Inspection Procedure (IP) 95002 Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area + (ML12179A216)
- ML12179A219 + (ML12179A219)
- ML12179A224 + (ML12179A224)
- ML12179A231 + (ML12179A231)
- IR 05000440/2012406 + (ML12179A267)
- 05000387/LER-2012-004, Regarding Unit 1 Secondary Containment TS 3.6.4.2 Combined LCO Time Exceeded on Two Occasions When the Primary Containment N2 Spectacle Flange Was Rotated in the Open Position + (ML12179A275)
- SBK-L-12129, Response to Confirmatory Action Letter 1-2012-002, Information Related to Concrete Degradation Issues + (ML12179A281)
- ML12179A282 + (ML12179A282)
- L-2012-248, Turkey Point, Units 3 and 4, License Amendment Request - Cyber Security Plan Implementation Schedule Milestone Change + (ML12179A283)
- ML12179A283 + (ML12179A283)