WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]

Sent: Monday, June 11, 2012 8:30 AM To: Poole, Justin

Subject:

Emailing: 2012-06 WBN Project Plan - Unit 2.pdf Attachments: 2012-06 WBN Project Plan - Unit 2.pdf

<<2012-06-07 - WBN Project Plan - Unit 2.pdf>> Justin, Please see attached for Bucket list call.

Thank you,

~*~*~*~*~*~*~*~*~*~*~

Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 708 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF2DDF9EC5)

Subject:

Emailing: 2012-06 WBN Project Plan - Unit 2.pdf Sent Date: 6/11/2012 8:30:11 AM Received Date: 6/11/2012 8:30:14 AM From: Boyd, Desiree L Created By: dlboyd@tva.gov Recipients:

"Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 224 6/11/2012 8:30:14 AM 2012-06 WBN Project Plan - Unit 2.pdf 209724 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

WBN UNIT 2 PROJECT PLAN Page 2 06/07/2012 I. SUBMITTAL LOOK-AHEAD Item Description Resp. Person Due Date No.

License Amendments / Technical Specifications

1. U1 Fuel Handling Accident/Alternate Source Term LAR Shea June 7, 2012
2. Common Service Station Transformer (CSST) A & B Credit Shea October 12, 2012
3. U1 Hydrology LAR Shea July 31, 2012
4. SSER Open Item 32: Diesel Generator Frequency Allowable Value Hilmes January 13, 2013 SSER Appendix HH Open Items (requiring submittal)

SSER Open Item 13: Submit an ASME Section XI Inservice Test Program for the first ten

1. year interval six months before receiving an Operating License. [Commitment McDonald/Crouch March 2014 NCO080008033: Item 017 of Enclosure 2 of letter T90 080128 001]

SSER Open Item 25: Submit documentation of liability insurance coverage pursuant to 10

2. Arent June 2014 CFR 140.11(a)(4)

SSER Open Item 26: Submit Emergency Diesel Generator load calculations and results

3. Hilmes/Arent/Bryan June 21, 2012 from EDSFI Tables
4. SSER Open Item 30: Degraded Voltage Hilmes/Bryan June 7, 2012
5. SSER Open Item 37: Submit changes to the Emergency Plan (REP) prior to fuel load Detchemendy June 2014 SSER Open Item 61: Fuel Thermal Conductivity Degradation Model (PAD Code) - note
6. Koontz October 26, 2012 currently this is a License Condition - tracking PWROG activity to update code SOURCE: POD UPDATES, COMMITMENTS

WBN UNIT 2 PROJECT PLAN Page 3 06/07/2012 Item Description Resp. Person Due Date No.

7. SSER Open Item 70: Submit PreService Inspection program update. McDonald/Crouch September 28, 2012
8. SSER Open Item 81: General Atomic High Range Rad Monitor - Test Results Hilmes August 31, 2012 SSER Open Item 117: Provide calculational basis for access to vital areas - mission dose
9. Koontz/Arent August 16, 2012 and update FSAR. (Amendment 109) [Commitment 112046729]

SSER Open Item 134: Provide resolution of dam stability analysis for Cherokee and

10. Ray August 31, 2012 Douglas Dams finite element analysis.

SSER Open Item 138: Following update of ODCM, update annual Chi/Q values in the

11. Arent August 16, 2012 FSAR.(Amendment 109)
12. SSER Open Item 139: Include cost benefit analysis in next update to FSAR (Amend 109) Arent August 16, 2012 TBD: A new action for a Unit 2 revision was Submit a Technical Specification and Bases change package to TVA Licensing to change created with a Table 3.3.3-1, Line item 6 (Reactor Vessel Water Level) to remove the reference to note
13. Crouch/Hilmes/Clark 06/29/2012 due date; (g) and bases to show RVLIS as a Type A variable. Need calculation WBNO4SG4047 however, this was done revised. PER 488815 [Commitment 113307292]

without Unit 2 concurrence.

TBD: A new action for a Unit 2 revision was Submit a FSAR Change Package to TVA Licensing to Amendment 108, Table 7.5-2, created with a Regulatory Guide 1.97 Post Accident Monitoring Variables Lists, will be updated to show

14. Crouch/Hilmes/Clark 06/29/2012 due date; RVLIS as a Type A variable. Need calculation WBNO4SG4047 revised. PER 488815 however, this was done

[Commitment 113307350]

without Unit 2 concurrence.

SOURCE: POD UPDATES, COMMITMENTS

WBN UNIT 2 PROJECT PLAN Page 4 06/07/2012 Item Description Resp. Person Due Date No.

Other Submittals

1. Environmental Qualification of Category 2 Cables Hilmes/Bushnell June 21, 2012 Revised WBN 2 Emergency Response Data System (ERDS) Data Point Library (DPL)
2. Hilmes June 15, 2012

[Commitment 113469683 - T02111114001; IPS 519]

3. As-Constructed Fire Protection Report [Commitment 113461862] Hilmes July 2014
4. U2 FSAR With As-Constructed Figures [Commitment 112068531] Arent July 2014 Prior to fuel load, a final report will be submitted following certain validation activities as
5. Koontz/Enis July 2014 described in the IPEEE Design Report (Enclosure 1). [Commitment 111027893]

TVA will provide the NRC staff an updated [security] classification scheme that reflects

6. these changes for WBN Unit 2. [Commitment 111033038: RAI Response 3.r of Reynolds May 2014 Enclosure 2. of Letter T02 100427 001]
7. Submit a merged U2 FSAR / U1 UFSAR [Commitment 111360889] Licensing April 2016 Provide a non-proprietary version of a Westinghouse FSAR Chapter 15 Transient Analysis
8. Bryan July 2012 Submittal
9. Fire Protection Report Hilmes June 28, 2012
10. 10 CFR Part 70 License Extension Bryan June 2013
11. 2 Unit ODCM Woods/Shea September 14, 2012
12. As-Constructed PRA Guey/Koontz October 2014
13. TMI Commitment Review Letter Licensing January 2014 SOURCE: POD UPDATES, COMMITMENTS

WBN UNIT 2 PROJECT PLAN Page 5 06/07/2012 Item Description Resp. Person Due Date No.

Regional Submittals 20-days following

1. Allegation Response: provide updated response including Crack Study Wiggall/Enis/Arent report (June 15, 2012)
2. NOV 391/2012-612-01: Component PM Program Beecken/Olson/Stockton June 8, 2012
3. NOV 391/2010-603-08: Heinemann Breakers Wiggall/Enis/Stockton June 17, 2012 SOURCE: POD UPDATES, COMMITMENTS

WBN UNIT 2 PROJECT PLAN Page 6 06/07/2012 II. CORRESPONDENCE (INCOMING / ANTICIPATED / OUTGOING)

INCOMING CORRESPONDENCE PROJ.

PLAN PP-25 NO. DOC. DATE SUBJECT FROM UPDATED CHECKLIST ROUTED TO

1. 05/18/2012 NOV Heinemann Breakers NRC Yes N/A Engineering 2.

3.

ANTICIPATED CORRESPONDENCE EXPECTED RECEIPT NO. DESCRIPTION FROM EXIT DATE DATE SOURCE: CORRESPONDENCE DATABASE

WBN UNIT 2 PROJECT PLAN Page 7 06/07/2012 OUTGOING CORRESPONDENCE SUBJECT SUBMITTAL DATE Pre-op Test Instruction 2-PTI-067-01 06/05/2012 Revised Section 4.3 Fuel Storage Developmental Revision G of the Unit 2 Technical Specification (TS) 06/05/2012 NUREG-0847 Supplemental Safety Evaluation Report (SSER) Related to the Operation of Watts Bar Nuclear Plant, Unit 2, 06/07/2012 Appendix HH Open Item 26 - Diesel Generator.

NUREG-0847 Supplemental Safety Evaluation Report (SSER) Related to the Operation of Watts Bar Nuclear Plant, Unit 2, 06/07/2012 Appendix HH Open Item 30 - Power System Degraded Voltage Reply to a Notice Of Violation 391/2012612 Failure to Correct a Condition Adverse to Quality Associated with Containment 06/07/2012 Spray Pump Layup And Preventive Maintenance SOURCE: CORRESPONDENCE DATABASE