License Amendment Request to Transition to National Fire Protection Association Standard 805 Requirements - Establishment of an Online Reference Portal
ML12179A219
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/19/2012
From: Swift P
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML12179A219 (2)


Text

P.O. Box 63 CENGS.

Lycoming, New York 13093 a joint venture of Energy' NINE MILE POINT NUCLEAR STATION June 19, 2012 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:

Document Control Desk

SUBJECT:

Nine Mile Point Nuclear Station Unit No. 1; Docket No. 50-220 License Amendment Request to Transition to National Fire Protection Association Standard 805 Requirements - Establishment of an Online Reference Portal

REFERENCES:

(a) Letter from B. K. Vaidya (NRC) to K. Langdon (NMPNS), dated May 7, 2012, Nine Mile Point Nuclear Station, Unit Nos. 1 and 2 - National Fire Protection Association Standard 805 License Amendment Application Online Reference Portal (b) Letter from K. Langdon (NMPNS) to Document Control Desk (NRC), dated June 11, 2012, License Amendment Request Pursuant to 10 CFR 50.90:

Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)

As discussed in the NRC letter dated May 7, 2012 (Reference a), an online reference portal will be established to allow the NRC staff and contractors limited read-only access to the basis documents and other reference materials cited in the Nine Mile Point Unit 1 (NMP1) license amendment request for adoption of a new risk-informed, performance-based fire protection licensing basis that is based on National Fire Protection Association (NFPA) Standard 805 (Reference b). In Reference (a), the NRC outlined certain terms and conditions associated with the online reference portal. Nine Mile Point Nuclear Station, LLC (NMPNS) agrees to the terms and conditions set forth in Reference (a) and will maintain those conditions throughout the duration of the NRC review process. Following NRC acceptance of the amendment request for review, NMPNS will send to the NRC project manager for NMP1 the information necessary to access the portal.

UJQL

Document Control Desk June 19, 2012 Page 2 Should you have any questions regarding the information in this submittal, please contact John J. Dosa, Director Licensing, at (315) 349-5219.

Very truly yours, Paul M. Swift Manager Engineering Services PMS/DEV cc:

Regional Administrator, Region I, NRC Project Manager, NRC Resident Inspector, NRC