Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML110470338 + (ML110470338)
- ML110470403 + (ML110470403)
- L-11-001, Containment Liner Random and Non-Random Examinations Report + (ML110470404)
- ML110470405 + (ML110470405)
- ML110470406 + (ML110470406)
- 0CAN021101, Response to Request for Additional Information on Cyber Security Plan + (ML110470416)
- ML110470446 + (ML110470446)
- ML110470447 + (ML110470447)
- ML110470452 + (ML110470452)
- IR 05000387/2011301 + (ML110470491)
- NL-11-0255, Outage Inservice Inspection Summary Report + (ML110470527)
- ML110470544 + (ML110470544)
- ML110470557 + (ML110470557)
- RIS 2012-06, NRC Policy Regarding Submittal of Amendments for Processing of Equivalent Feed at Licensed Uranium Recovery Facilities + (ML110470571)
- ML110470572 + (ML110470572)
- ML110470585 + (ML110470585)
- ML110470587 + (ML110470587)
- ML110470588 + (ML110470588)
- ML110470592 + (ML110470592)
- ML110470594 + (ML110470594)
- Press Release-11-026, Nuclear Regulatory Commission Lays Out Framework for Conducting Mandatory Hearings on New Reactor Licenses + (ML110470595)
- Press Release-11-027, Public Meeting Feb. 24 to Discuss Revisions to Key NRC Document on Classification of Low-Level Waste + (ML110470596)
- Press Release-I-11-002, Licensing Board to Hold Evidentiary Hearing on March 9th in Plymouth, Mass., on Pilgrim License Renewal Contention + (ML110470597)
- ML110480046 + (ML110480046)
- L-2011-042, Inservice Inspection Program Fourth Interval-Second Period-Third Refueling Outage Owners Activity Report (OAR-1) + (ML110480047)
- L-2010-243, Response to Request for Additional Information Relief Request No. 8, Transfer Canal Drain Line Piping Repair + (ML110480049)
- L-2011-036, Turkey Point, Units 3 & 4 - Response to NRC Request for Additional Information (RAI) Regarding NRC General Letter 2008-01 Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems + (ML110480050)
- ML110480050 + (ML110480050)
- L-2011-019, Cycle 25 Sartup Report + (ML110480051)
- 05000251/LER-2010-008, For Turkey Point Unit 4, Regarding Manual Reactor Trip Due to Condenser Tube Leak + (ML110480052)
- LR-N11-0024, Submittal of Attached Form AP-Q No Changes Report in Support of the Us Additional Protocol + (ML110480053)
- ML110480054 + (ML110480054)
- ML110480057 + (ML110480057)
- ML110480061 + (ML110480061)
- ML110480116 + (ML110480116)
- ML110480134 + (ML110480134)
- ML110480139 + (ML110480139)
- ML110480157 + (ML110480157)
- ML110480280 + (ML110480280)
- ML110480295 + (ML110480295)
- NOC-AE-11002637, Submittal of Operations Quality Assurance Plan Change QA-072 + (ML110480373)
- ML110480373 + (ML110480373)
- ML110480377 + (ML110480377)
- ML110480403 + (ML110480403)
- NL-11-0298, Joseph M. Farley, Units 1 and 2, Edwin I. Hatch, Units 1 and 2, and Vogtle, Units 1 and 2, Comments on Draft NRC Regulatory Issue Summary 2011-xx, Adequacy of Station Electric Distribution System Voltages. + (ML110480403)
- ML110480405 + (ML110480405)
- ML110480452 + (ML110480452)
- ML110480461 + (ML110480461)
- ML110480481 + (ML110480481)
- W3F1-2011-0013, Request for Alternative W3-ISI-018, Inspection of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles During the Third Ten-Year Inservice Inspection Interval + (ML110480484)
- IR 05000397/2010005 + (ML110480486)
- W3F1-2011-0014, Request for Alternative W3-ISI-019, Inspection of Reactor Vessel Head In-Core Instrument Nozzles During the Third Ten-Year Inservice Inspection Interval + (ML110480488)