ML110470587

From kanterella
Jump to navigation Jump to search

Request for Additional Information LAR to Revise Technical Specification to Relocate Operating and Surveillance Requirements for the Power Operated Relief Valve
ML110470587
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/16/2011
From: Lynnea Wilkins
Plant Licensing Branch IV
To: Hansher B
Omaha Public Power District
Wilkins, L E, NRR/DORL/LPL4, 415-1377
Shared Package
ML110470586 List:
References
TAC ME4541
Download: ML110470587 (1)


Text

From: Wilkins, Lynnea Sent: Wednesday, February 16, 2011 4:35 PM To: HANSHER, BILL R Cc: Lent, Susan; Burkhardt, Janet

Subject:

DRAFT RAI for Fort Calhoun Station, Unit 1 LAR (TAC No. ME4541)

Attachments: ME4541 RAI.docx

Bill, By letter dated August 16, 2010, as supplemented by letter dated September 27, 2010, (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML102290067 and ML102720964), Omaha Public Power District requested to relocate operating and surveillance requirements for the power operated relief valve position, safety valve position and tailpipe temperature instrumentation from Fort Calhoun Station Unit 1 Technical Specifications to Fort Calhoun Station Unit 1 Updated Safety Analysis Report.

The NRC staff has reviewed your submittal and has determined that the information specified in the attached draft Request for Additional Information (RAI) is needed for the staff to complete its evaluation.

Please contact me if a clarifying teleconference is needed for the attached RAIs.

Thank You Lynnea Wilkins, Project Manager Fort Calhoun Station, Unit 1 Cooper Nuclear Station Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: 301-415-1377