Search results

Jump to navigation Jump to search
Results 1 – 20 of 98,900
Advanced search

Search in namespaces:

  • the Plant Performance Review cycle in ' May 1999. Enclosure 1 contains a historical listing of plant issues, referred to as the Plant issues Matrix (PIM)
    67 KB (8,981 words) - 21:23, 22 November 2020
  • nature. Enclosure 2 contains a historical listing of plant issues, referred to as the Plant issues Matrix (PIM), that was considered during the IRPM. The PIM
    125 KB (12,951 words) - 05:32, 13 November 2020
  • conducted in the plant support area. Enclosure 1 contains a historical listing of plant issues, referred to as the Plant issues Matrix (PIM), that were
    60 KB (7,801 words) - 10:17, 30 December 2020
  • of the Plant Performance Review cycle in May 1999. Enclosure 1 contains a historicallisting of plant issues, referred to as the Plant issues Matrix (PIM)
    42 KB (4,433 words) - 21:43, 22 November 2020
  • program. l Enclosure 1 contains a historicallisting of plant issues, referred to as the Plant issues Matrix (PIM), that were considered during this PPR process
    119 KB (13,127 words) - 18:59, 29 December 2020
  • Undated - Braidwood-Plant issues Matrix (39 pages) 2. Undated Byron-Plant issues Matrix (25 pages) 3. 12/09/97 Dresden-Plant issues Matrix (57 pages) 4. 12/09/97
    6 KB (609 words) - 10:39, 7 December 2021
  • Event Number <= 28335 ASSIGNMENT DATE: 02/06/95 ASSIGNED TO: HUNEMULLER N. PLANT & UNIT: DRESDEN 3 EVENT DATE: 02/03/95 50.72 REPORT NO: 28335 DAILY REPORT
    6 KB (779 words) - 13:48, 11 December 2021
  • Assessment IA-97-451, Plant Issues Matrix1997-12-0909 December 1997 Plant Issues Matrix ML20203J7501997-12-0909 December 1997 Plant Issues Matrix ML20197A4991997-12-0808
    4 KB (179 words) - 04:06, 21 February 2021
  • 1997-12-0909 December 1997 Plant Issues Matrix IA-97-451, Plant Issues Matrix1997-12-0909 December 1997 Plant Issues Matrix ML20210N6061997-08-14014 August
    503 bytes (0 words) - 17:33, 13 November 2023
  • 1997-12-0909 December 1997 Plant Issues Matrix IA-97-451, Plant Issues Matrix1997-12-0909 December 1997 Plant Issues Matrix ML20210N6061997-08-14014 August
    576 bytes (0 words) - 17:52, 13 November 2023
  • ML23069A231 (category Plant Issues Matrix)
    Holtec Letter 5014959 Attachment 2 100 CoC Reorganization Matrix The reorganization sections identified in these tables are based on the outline proposed
    24 KB (2,066 words) - 11:18, 15 March 2023
  • 1997-12-0909 December 1997 Plant Issues Matrix IA-97-451, Plant Issues Matrix1997-12-0909 December 1997 Plant Issues Matrix ML20210N6061997-08-14014 August
    2 KB (179 words) - 08:36, 2 September 2020
  • ML023260433 (category Plant Issues Matrix)
    RT grouped the recommendations into a matrix format with four overarching categories as discussed below. The matrix is provided as Attachment 1 and includes
    74 KB (8,378 words) - 21:51, 24 March 2020
  • public. 2. Compile the plant issues matrix, the results of the PIs, and the proposed inspection plan for each plant. 3. Develop a Plant Performance Summary
    156 KB (22,472 words) - 18:10, 6 December 2019
  • ML040830319 (category Plant Issues Matrix)
    Y Description of Issue - Trip of Reactor Protection System During Plant Cooldown. Davis-Besse Operations Procedure DB-OP-06903, Plant Shutdown and Cooldown
    48 KB (7,535 words) - 20:40, 18 March 2020
  • ML040830417 (category Plant Issues Matrix)
    safety in the considerations when reviewing a plant modification. The inspector concluded that the issues associated with this unresolved item had been
    75 KB (11,380 words) - 20:37, 18 March 2020
  • ML100750390 (category Plant Issues Matrix)
    Modify11ant Issue Page 1 of2 plant status daily enter daily plant status safety meeting branch chief reports focus items pita search archives information
    2 KB (262 words) - 21:48, 13 November 2019
  • ML100750411 (category Plant Issues Matrix)
    Modify Plant Issue "'Page I of 2 plant status daily enter daily plant status safety meeting branch chiet reports focus items . pita search guid archives
    2 KB (265 words) - 21:47, 13 November 2019
  • discussion should be supported by issues that are documented in the attached Plant Issues Matrix (PIM). Significant issues should be included in the discussion
    28 KB (3,814 words) - 07:02, 22 November 2020
  • inspection plan 5. Prepare a plant-specific action matrix as an attachment to the Plant Performance Summary. The plant specific action matrix should show the timeline
    142 KB (20,641 words) - 18:05, 6 December 2019
View (previous 20 | ) (20 | 50 | 100 | 250 | 500)