Modify Plant Issue "'Page I of 2 plant status daily enter daily plant status safety meeting branch chiet reports focus items . pita search guid archives information Crystal River Information for 10/13/2009 (Modify/Update)

Unit 3 status: (no commas, please)

INo Mode; GREEN RCS Leak:

9:15mtg. C Yes ( No Routine Activities / TS Activities:

Significant TS / Issues:

9:15mtg. C Yes

  • No L*

add attachment Risk Significant / Emergent Activities:

No Mode. The core off load was completed Friday morning. Both trains of spent fuel cooling are in service. Due to an Alpha train bus outage (scheduled completion Oct 18), the alpha train spent fuel pump in on temporary power.

The outage is 27 shifts behind after 20 shifts (10 days) was added to schedule on Friday due to the need to re-engineer the steam generator lift system so that no load is placed on the containment wall. jj 9:15mtg.( Yes (- No E add attachment Findings and Observations:

9:15mtg. ( Yes r No Site Visits:

A. Alen onsite for 5 week training rotation.

B. Collins is onsite for ISI inspection.

Containment special inspection entrance today. Team is lead by L. Lake.

9:15 mtg. (" Yes C No ErA delete http://r2.nrc.gov/webapps/pita/ModifyIssue.cfm?iid= 15362&sname=Crystal River 10/20/2009

WModity Plant Issue Page 2 of 2 Chairman and LuisNRC 5.jpg add attachment Other:

9:15mtg. C Yes ( No Rw add attachment LUpdated:

Last updated: 10/1312009 1 8:51 AM http://r2.nrc.gov/webapps/pita/Modifylssue.cfm?iid= 15362&sname=Crystal River 10/20/2009