ML20116D482  +
L 11 +, TXX-4422 +, TXX-4395, Forwards Response to Re Safe Handling of Heavy Loads.Facility Design Employs roll-away Steel Missile Shield Over Reactor.No Concrete Structures Lifted in Vicinity Of,Or Over Spent Fuel +, TXX-4399, Forwards Updated Engineering & Const Status Rept.Pages Deleted for Items Whose Deferral Beyond Fuel Load Has Been Accepted by NRC +, TXX-4384, Forwards Partial Rev to Response to NRC Question 033.1 Describing Mod to Design of Core Cooling Monitor/Spds Interface as Interim Justification for Operation During First Operating Cycle +, TXX-4391, Forwards Process Control Program for Comanche Peak Steam Electric Station. Revised FSAR Section 11.4 to Amend 54 Also Encl +, TXX-4413, Forwards Addl Info Re Equipment Adequacy for Mitigation of Steamline Breaks Outside Reactor Bldg Containment.Info Will Be Included in Future FSAR Amend +, TXX-4389, Forwards Status Rept Describing Unit 1 Engineering & Const Items Which Will Not Be Completed by 850117.Technical Review Team Insp Items & ASLB Issues Not Included +, TXX-4386, Forwards Response to NRC Question Q022.22 & Revised FSAR Text Re Containment Integrated Leak Rate Test.Changes Will Be Part of Amend 54 to FSAR Scheduled for Transmittal in Jan 1985 +, TXX-4360, Submits List of Requested Changes to Final Draft Tech Specs. Review of Final Draft Tech Specs Incomplete.Addl Mods May Be Necessary at Future Date +, TXX-4304, Forwards New Justifications for Interim Operation for NSSS Auxiliary Relay Rack.Justification Provides Analysis Required to Show That Plant Can Be Safely Operated Until Equipment Qualification Program for Relay Rack Completed +, TXX-4274, Forwards marked-up Proposed Tech Spec Changes Re Remote Shutdown Instrumentation,Fire Detection Instrumentation,Fire Suppression Sys & Liquid Effluents +, TXX-4242, Forwards Source Range Neutron Flux Indication Backfit Description for Alternate Shutdown Which Supercedes Methods for Removing High Voltage from Source Range Detector +, TXX-4328, Informs That Suppl to Human Factors Control Room Design Review of Comanche Peak Steam Electric Station Will Be Submitted Prior to Startup for Second Operating Cycle for Unit 1 +, TXX-4320, Forwards Justification Required to Allow Fuel Load & Full Power Operation Re Deficiencies Identified in 840702 & 0830 Ltrs Concerning Impact of Temp Due to Main Steam Line Break Outside Containment +, TXX-4208, Forwards Justification for Interim Operation Re Seismic & Dynamic Qualification Program for Equipment.Encl Analysis Shows Plant Can Be Operated Safely Until Equipment Qualification Programs Completed +, TXX-4209, Forwards Equipment Environ Qualification Analysis Justifications for Interim Operation Required by 10CFR50.49. Facilities Can Be Safely Operated Until Qualification Program Completed +  and TXX-4062 +
05000445  +, 05000446  +  and 00445  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
9.259259e-5 d (0.00222 hours, 1.322751e-5 weeks, 3.044e-6 months)  +, 3.472222e-5 d (8.333333e-4 hours, 4.960317e-6 weeks, 1.1415e-6 months)  +  and 1.157407e-5 d (2.777778e-4 hours, 1.653439e-6 weeks, 3.805e-7 months)  +
April 30, 1985  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
03:42:41, 13 December 2024  +
175  +
IMP +, CP-6 +, RT-1 +, IAP +  and RT-3 +
Processing error"Processing error" is a predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> and represents errors that appeared in connection with improper value annotations or input processing.
Request  +
April 30, 1985  +
TXX-4422 +, TXX-4395, Forwards Response to Re Safe Handling of Heavy Loads.Facility Design Employs roll-away Steel Missile Shield Over Reactor.No Concrete Structures Lifted in Vicinity Of,Or Over Spent Fuel +, TXX-4399, Forwards Updated Engineering & Const Status Rept.Pages Deleted for Items Whose Deferral Beyond Fuel Load Has Been Accepted by NRC +, TXX-4384, Forwards Partial Rev to Response to NRC Question 033.1 Describing Mod to Design of Core Cooling Monitor/Spds Interface as Interim Justification for Operation During First Operating Cycle +, TXX-4391, Forwards Process Control Program for Comanche Peak Steam Electric Station. Revised FSAR Section 11.4 to Amend 54 Also Encl +, TXX-4413, Forwards Addl Info Re Equipment Adequacy for Mitigation of Steamline Breaks Outside Reactor Bldg Containment.Info Will Be Included in Future FSAR Amend +, TXX-4389, Forwards Status Rept Describing Unit 1 Engineering & Const Items Which Will Not Be Completed by 850117.Technical Review Team Insp Items & ASLB Issues Not Included +, TXX-4386, Forwards Response to NRC Question Q022.22 & Revised FSAR Text Re Containment Integrated Leak Rate Test.Changes Will Be Part of Amend 54 to FSAR Scheduled for Transmittal in Jan 1985 +, TXX-4360, Submits List of Requested Changes to Final Draft Tech Specs. Review of Final Draft Tech Specs Incomplete.Addl Mods May Be Necessary at Future Date +, TXX-4304, Forwards New Justifications for Interim Operation for NSSS Auxiliary Relay Rack.Justification Provides Analysis Required to Show That Plant Can Be Safely Operated Until Equipment Qualification Program for Relay Rack Completed +, TXX-4274, Forwards marked-up Proposed Tech Spec Changes Re Remote Shutdown Instrumentation,Fire Detection Instrumentation,Fire Suppression Sys & Liquid Effluents +, TXX-4242, Forwards Source Range Neutron Flux Indication Backfit Description for Alternate Shutdown Which Supercedes Methods for Removing High Voltage from Source Range Detector +, TXX-4328, Informs That Suppl to Human Factors Control Room Design Review of Comanche Peak Steam Electric Station Will Be Submitted Prior to Startup for Second Operating Cycle for Unit 1 +, TXX-4320, Forwards Justification Required to Allow Fuel Load & Full Power Operation Re Deficiencies Identified in 840702 & 0830 Ltrs Concerning Impact of Temp Due to Main Steam Line Break Outside Containment +, TXX-4208, Forwards Justification for Interim Operation Re Seismic & Dynamic Qualification Program for Equipment.Encl Analysis Shows Plant Can Be Operated Safely Until Equipment Qualification Programs Completed +, TXX-4209, Forwards Equipment Environ Qualification Analysis Justifications for Interim Operation Required by 10CFR50.49. Facilities Can Be Safely Operated Until Qualification Program Completed +  and TXX-4062 +
Comprehensive Action List  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.