On January 26, 2018, a containment entry wOn January 26, 2018, a containment entry was made to identify the source of elevated Unidentified Reactor Coolant System (RCS) operational leakage. A through-wall leak was identified on a Class 1 piping weld on the letdown line at 0853 EST. It was determined that the leak was RCS pressure boundary leakage. Ginna entered Technical Specification (TS) LCO (Limiting Condition for Operation) 3.4.13, RCS Operational Leakage, Condition B. for the existence of pressure boundary leakage. This condition requires the plant to be in MODE 3 within 6 hours and MODE 5 within 36 hours. The leak was isolated and TS LCO 3.4.13 exited at 1015 EST.</br>This event is reportable within 8 hours in accordance with 10CFR50.72(b)(3)(ii)(A) for 'Any event or condition that results in: (A) The condition of the nuclear power plant, including its principal safety barriers, being seriously degraded'.</br>The Station (Ginna) is developing an evaluation and a repair plan at this time.</br>This condition has no impact on public health and safety.</br>The licensee has informed the NRC Resident Inspector.e has informed the NRC Resident Inspector.  +
13:53:00, 26 January 2018  +
13:06:00, 26 January 2018  +
13:53:00, 26 January 2018  +
On January 26, 2018, a containment entry wOn January 26, 2018, a containment entry was made to identify the source of elevated Unidentified Reactor Coolant System (RCS) operational leakage. A through-wall leak was identified on a Class 1 piping weld on the letdown line at 0853 EST. It was determined that the leak was RCS pressure boundary leakage. Ginna entered Technical Specification (TS) LCO (Limiting Condition for Operation) 3.4.13, RCS Operational Leakage, Condition B. for the existence of pressure boundary leakage. This condition requires the plant to be in MODE 3 within 6 hours and MODE 5 within 36 hours. The leak was isolated and TS LCO 3.4.13 exited at 1015 EST.</br>This event is reportable within 8 hours in accordance with 10CFR50.72(b)(3)(ii)(A) for 'Any event or condition that results in: (A) The condition of the nuclear power plant, including its principal safety barriers, being seriously degraded'.</br>The Station (Ginna) is developing an evaluation and a repair plan at this time.</br>This condition has no impact on public health and safety.</br>The licensee has informed the NRC Resident Inspector.e has informed the NRC Resident Inspector.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
6.944444e-5 d (0.00167 hours, 9.920635e-6 weeks, 2.283e-6 months)  +, 4.166667e-4 d (0.01 hours, 5.952381e-5 weeks, 1.3698e-5 months)  +  and 9.259259e-5 d (0.00222 hours, 1.322751e-5 weeks, 3.044e-6 months)  +
00:00:00, 26 January 2018  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
05:13:34, 30 January 2018  +
13:06:00, 26 January 2018  +
false  +
-0.0325 d (-0.78 hours, -0.00464 weeks, -0.00107 months)  +
13:53:00, 26 January 2018  +
Reactor Coolant System Operational Leakage  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +