Browse wiki

Jump to navigation Jump to search
The following event description is based oThe following event description is based on information currently available. If through subsequent reviews of this event additional information is identified that is pertinent to this event or alters the information being provided at this time, a follow-up notification will be made via the ENS or under the reporting requirements of 10 CFR 50.73.</br>This telephone notification is being made pursuant to the reporting requirements of 10 CFR 50.73(a)(2)(iv)(A) to describe an invalid actuation of the Palo Verde Nuclear Generating Station Unit 2 'A' train Main Steam and Feedwater Isolation System (MSFIS) logic.</br>On December 11, 2013, at approximately 2011, Mountain Standard Time, Unit 2 was shut down in Mode 4 with Reactor Coolant System (RCS) temperature at approximately 425 degrees Fahrenheit and 1900 pounds per square inch absolute. While starting up the plant following completion of repairs to the 1A reactor coolant pump, an invalid actuation of the 'A' train MSFIS fast close logic occurred due to a random electrical failure in the 'A' train MSFIS logic cabinet. This resulted in the closure of all four Main Steam Isolation Valves and the two 'A' train Economizer Feed Water Isolation Valves. No other engineered safety feature actuations occurred and none were required. The invalid actuation was initiated by a ground fault in a 30-volt direct current power supply in the 'A' train MSFIS Logic cabinet. Repairs were completed on December 12, 2013. </br>This was a complete actuation of 'A' train MSFIS equipment and all the affected equipment responded as designed. RCS temperature and pressure were maintained stable using atmospheric dump valves. Feed water to the steam generators was being provided by Auxiliary Feed Water and was not affected by the event. </br>The NRC Resident Inspector has been notified. NRC Resident Inspector has been notified.  +
03:11:00, 12 December 2013  +
49,807  +
16:31:00, 7 February 2014  +
03:11:00, 12 December 2013  +
The following event description is based oThe following event description is based on information currently available. If through subsequent reviews of this event additional information is identified that is pertinent to this event or alters the information being provided at this time, a follow-up notification will be made via the ENS or under the reporting requirements of 10 CFR 50.73.</br>This telephone notification is being made pursuant to the reporting requirements of 10 CFR 50.73(a)(2)(iv)(A) to describe an invalid actuation of the Palo Verde Nuclear Generating Station Unit 2 'A' train Main Steam and Feedwater Isolation System (MSFIS) logic.</br>On December 11, 2013, at approximately 2011, Mountain Standard Time, Unit 2 was shut down in Mode 4 with Reactor Coolant System (RCS) temperature at approximately 425 degrees Fahrenheit and 1900 pounds per square inch absolute. While starting up the plant following completion of repairs to the 1A reactor coolant pump, an invalid actuation of the 'A' train MSFIS fast close logic occurred due to a random electrical failure in the 'A' train MSFIS logic cabinet. This resulted in the closure of all four Main Steam Isolation Valves and the two 'A' train Economizer Feed Water Isolation Valves. No other engineered safety feature actuations occurred and none were required. The invalid actuation was initiated by a ground fault in a 30-volt direct current power supply in the 'A' train MSFIS Logic cabinet. Repairs were completed on December 12, 2013. </br>This was a complete actuation of 'A' train MSFIS equipment and all the affected equipment responded as designed. RCS temperature and pressure were maintained stable using atmospheric dump valves. Feed water to the steam generators was being provided by Auxiliary Feed Water and was not affected by the event. </br>The NRC Resident Inspector has been notified. NRC Resident Inspector has been notified.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 7 February 2014  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
01:51:46, 2 March 2018  +
16:31:00, 7 February 2014  +
false  +
false  +
57.555 d (1,381.33 hours, 8.222 weeks, 1.892 months)  +
03:11:00, 12 December 2013  +
60 Day Report for an Invalid Main Steam Line Actuation  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
2  +