Issue date | Title | |
---|---|---|
BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 | 10 October 2023 | License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 |
ML19175A042 | 11 September 2019 | Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules |
BVY 17-004, Technical Specifications Proposed Change No. 313: Revision to License and Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool | 20 July 2017 | Technical Specifications Proposed Change No. 313: Revision to License and Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool |
ML15117A551 | 7 October 2015 | Issuance of Amendment for Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition |
ML15082A234 | 6 March 2015 | Comment (6) by William Irwin, on Behalf of State of Vermont Department of Health, Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report |
BVY 15-009, Response to Request for Additional Information Regarding Amendment Request for Permanently Defueled Emergency Plan and Emergency Action Level Scheme - Supplement 2 | 5 February 2015 | Response to Request for Additional Information Regarding Amendment Request for Permanently Defueled Emergency Plan and Emergency Action Level Scheme - Supplement 2 |
ML14168A302 | 12 June 2014 | Permanently Defueled Emergency Plan and Emergency Action Level Scheme |
BVY 14-010, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition | 28 March 2014 | Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition |
ML14164A048 | 25 March 2014 | Walk-through Retake Exam Administered 3/24-25/2014 |
BVY 14-011, Revision to Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima ... | 25 February 2014 | Revision to Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima ... |
ML13234A360 | 22 August 2013 | NRC Response Letter to D. Springer, Vermont Department of Public Service, Recent Equipment Failures at Vermont Yankee |
BVY 11-040, Submittal of 2010 Annual Radiological Environmental Operating Report | 9 May 2011 | Submittal of 2010 Annual Radiological Environmental Operating Report |
ML110330256 | 26 January 2011 | Transcript - 10 CFR 2.206 Petition Review Board Re Vermont Yankee, Telephone Conference on January 26, 2011. Pages 1 - 23 |
ML081570608 | 28 April 2008 | New England Coalition, Inc. Contention 4, Prefiled Exhibits, NEC-JH_36 - NEC-JH_53, NEC_RH_03, NEC-UW_03 - NEC-UW_13, Volume 1 |
ML070860733 | 26 March 2007 | Technical Specifications, Modify Requirements for Inoperable Snubbers by Relocating the Current TS Requirements Limiting Condition for Operation (LCO) 3.6.1 and Surveillance Requirement (SR) 4.6.1 |
BVY 07-015, Technical Specifications Proposed Change No. 272 - Transmittal of Final Retyped Technical Specifications Pages | 14 March 2007 | Technical Specifications Proposed Change No. 272 - Transmittal of Final Retyped Technical Specifications Pages |
ML070530371 | 30 January 2007 | Email: (PA-LR) VYNPS TRM |
ML061570364 | 25 May 2006 | Entergy'S Response to New England Coalition'S Request for Leave to File a New Contention, with Exhibits 1 - 6 |
ML061440245 | 17 May 2006 | Entergy'S Initial Statement of Position on New England Coalition Contention 3; Testimony and Affidavits of Craig J. Nichols and Jose L. Casillas on NEC Contention 3 - Large Transient Testing, with Exhibits 1 - 22 |
BVY 06-028, Technical Specifications Proposed Change No. 272, Relocation of LCO 3.6.I and SR 4.6.I and Addition of LCO 3.0.8 Regarding Snubbers | 22 April 2006 | Technical Specifications Proposed Change No. 272, Relocation of LCO 3.6.I and SR 4.6.I and Addition of LCO 3.0.8 Regarding Snubbers |
ML061040090 | 6 April 2006 | New England Coalition'S Request for Leave to File New Contentions and the Declaration of Dr. Joram Hopenfeld |
ML053490276 | 2 December 2005 | Entergy'S Motion for Summary Disposition of New England Coalition Contention 3 |
IR 05000271/2004007 | 22 June 2005 | EA-04-174, Vermont Yankee, Notice of Violation for NRC Special IR 05000271-04-007 |
ML050800432 | 16 March 2005 | TS Pages for Amendment 221 to License DPR-28, Relocating Current Definition of Surveillance Frequency to New Technical Specification (TS) Sections 4.0.2 and 4.0.3 and Revises Requirements for Missed Surveillance in TS Section 4.0.3 |
ML042080181 | 25 May 2004 | E-mail from M. Hamer of Vermont Yankee to Various, Regarding Pro for CR-VTY-01 017 - V23-3 Failed LLRT |
ML042080139 | 17 May 2004 | E-mail from M. Hamer of Vermont Yankee to Various, Regarding Pro for MSIV V2-80B LLRT Failure |
ML042080170 | 26 April 2004 | E-mail from M. Hamer to Various, Regarding Pro for CRVTY- 2004-00981 |
ML042080450 | 3 March 2004 | E-mail from M. Hamer of Vermont Yankee to Various, Regarding CR-VTY-2004-00406 Reportability |
ML040020301 | 23 December 2003 | Technical Specifications, Logic System Functional Test |
ML032681101 | 16 September 2003 | Technical Specification (TS) Proposed Change No. 261 Regarding Missed Surveillances and Adoption of a TS Bases Control Program Using the Consolidated Line Item Improvement Process |
IR 05000271/2003002 | 5 May 2003 | IR 05000271-03-002; on 12/29/02 - 03/28/03, Entergy Nuclear Vermont Yankee LLC, Vermont Yankee Nuclear Power Station; Adverse Weather Protection, Access Control, Identification and Resolution of Problems |
ML030130037 | 9 January 2003 | Technical Specification Proposed Change No. 255 Definition of Logic System Functional Test |
ML092110065 | 31 July 2002 | Appendix a to Operating License Number DPR-28 |
ML20217G204 | 13 October 1999 | Safety Evaluation Supporting Amend 179 to License DPR-28 |
BVY-99-106, TS Proposed Change 225 to License DPR-28,revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance | 18 August 1999 | TS Proposed Change 225 to License DPR-28,revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance |
ML20211B678 | 18 August 1999 | Proposed Tech Specs Revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance |
IR 05000271/1999003 | 14 June 1999 | Insp Rept 50-271/99-03 on 990329-0509.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance,Plant Support & Review of Maint Rule Program Implementation |
ML20202G278 | 28 January 1999 | Insp Rept 50-271/98-14 on 981122-990104.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering |
ML20203D180 | 10 January 1999 | Discusses Safety Concern,Inaccurate LERs & Accurate Plant Internal Documents.Lists Some Troubles from New Insp 98-13 |
IR 05000271/1998013 | 23 December 1998 | Insp Rept 50-271/98-13 on 981011-1121.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support |
DD-98-13, Forwards Director'S Decision DD-98-13 Denying 980527 Petition to Suspend OL Or,In Alternative,Modify License Requiring Util to Certify That All Safety Sys & All Security Sys Are Fully Operable Before Restart | 7 December 1998 | Forwards Director'S Decision DD-98-13 Denying 980527 Petition to Suspend OL Or,In Alternative,Modify License Requiring Util to Certify That All Safety Sys & All Security Sys Are Fully Operable Before Restart |
IR 05000271/1998010 | 14 August 1998 | Insp Rept 50-271/98-10 on 980614-0718.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support |
ML20148B870 | 22 April 1997 | Special Rept:On 970123,periodic Source Leakage Test of 150 Uci Cs-137 Source Revealed Presence of Greater than 0.005 Uci of Removable Contamination.Source Removed from Svc & Will Be Disposed of IAW Applicable Regulatory Requirements |
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly | 5 August 1996 | Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly |
05000271/LER-1993-004 | 19 August 1993 | LER 93-004-01:on 930225,discovered That Surveillance for Jet Pumps Not Performed During Single Loop Operations Due to Inadequate Plant Procedures.Procedures OP-4110 & OP-2428 revised.W/930819 Ltr |
ML20101S126 | 15 May 1992 | Application to Dispose in Place Contaminated Soil |
BVY-91-113, Requests Approval of Proposed Procedures to Dispose,By Leaving in place,82 Mci of Total Activity,Principally Tritium,Contained in Fill Matl Located Under Existing Plant Structures & Bldgs,Per 10CFR20.302(a) | 18 November 1991 | Requests Approval of Proposed Procedures to Dispose,By Leaving in place,82 Mci of Total Activity,Principally Tritium,Contained in Fill Matl Located Under Existing Plant Structures & Bldgs,Per 10CFR20.302(a) |
BVY-90-123, Forwards Response to Violations Noted in Insp Rept 50-271/90-11 Re Personnel Access Control Program.Response Withheld (Ref 10CFR2.790) | 14 December 1990 | Forwards Response to Violations Noted in Insp Rept 50-271/90-11 Re Personnel Access Control Program.Response Withheld (Ref 10CFR2.790) |
ML20029C258 | 14 December 1990 | Responds to Violations Noted in Insp Rept 50-271/90-11. Corrective Actions Withheld (Ref 10CFR2.790) |
ML20141A088 | 28 March 1986 | Part 21 Rept Re Potential Defect in Contact Block Kits Supplied by Namco Controls.Initially Reported on 860227. Defective Kits Replaced.Vendor QA Program Under Reevaluation |