Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
WBL-23-045, 10 CFR 50.59 Summary Report | 7 November 2023 | 10 CFR 50.59 Summary Report |
WBL-22-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual | 11 May 2022 | Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual |
CNL-21-010, Correction of Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology (WBN-TS-19-04) (EPID | 26 January 2021 | Correction of Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology (WBN-TS-19-04) (EPID L |
CNL-20-016, Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23) | 22 June 2020 | Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23) |
CNL-19-051, Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology | 17 January 2020 | Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology |
CNL-18-067, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14) | 12 October 2018 | Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14) |
NL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System | 17 November 2017 | Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System. |
CNL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power Syste | 17 November 2017 | Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System. |
ML17334A170 | 2 November 2017 | Amendment 1 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System |
CNL-17-098, Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels | 27 July 2017 | Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels |
ML17180A024 | 11 July 2017 | Issuance of Amendment Regarding One-Time Extension of Intervals for Specified Surveillance Requirements |
CNL-17-085, Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels | 7 July 2017 | Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels |
ML17165A493 | 14 June 2017 | 302 Final Simulator Scenarios |
ML17165A483 | 14 June 2017 | 302 Draft Simulator Scenarios |
ML16257A721 | 13 September 2016 | Initial Exam 2016-301 Final SRO Written Exam - Delay Release 2 Years |
ML15251A587 | 22 October 2015 | Issuance of Facility Operating License No. NPF-96 Watts Bar Nuclear Plant, Unit 2 |
ML15301A140 | 22 October 2015 | Current Facility Operating License NPF-96, Tech Specs, Revised 11/08/2017 |
NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 5.0 - Reactor Coolant System | 11 September 2015 | Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 5.0 - Reactor Coolant System |
ML15279A272 | 11 September 2015 | Amendment 114 to Final Safety Analysis Report, Section 5.0 - Reactor Coolant System |
CNL-15-137, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 13 (TAC No. MD6311) and Status of Generic Communications for Unit 2 - Revision 13 | 27 July 2015 | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 13 (TAC No. MD6311) and Status of Generic Communications for Unit 2 - Revision 13 |
CNL-15-104, Submittal of Revision 106, Appendix C to Central Emergency Control Center, Radiological Emergency Plan | 15 June 2015 | Submittal of Revision 106, Appendix C to Central Emergency Control Center, Radiological Emergency Plan |
CNL-14-154, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 12 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 12 | 2 September 2014 | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 12 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 12 |
ML14170A045 | 16 June 2014 | Attachment 1 - TS Developmental Revision I Changes (Mark-Up) for WBN Unit 2 |
ML14160B105 | 30 May 2014 | Final Safety Analysis Report, Amendment 112, Section 5.0, Reactor Coolant System |
ML14080A023 | 11 March 2014 | Submittal of Pre-Operational Test Instruction |
ML14055A276 | 18 February 2014 | Pre-Operational Test Instruction 2-PTI-063-01, Safety Injection System SIS Integrated Test. |
ML13357A053 | 12 December 2013 | Technical Specifications |
ML13357A050 | 12 December 2013 | Synopsis of Revisions Included in Watts Bar Unit 2 Developmental Revision H of Technical Specifications and Technical Specification Bases. Part 1 of 2 |
ML13255A279 | 14 August 2013 | Final Safety Analysis Report (Fsar), Amendment 110, Section 5, Reactor Coolant System |
ML13210A063 | 26 July 2013 | Initial Exam 2013-301 Final Administrative JPMs |
ML13213A194 | 25 July 2013 | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 10 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 10 |
ML13023A315 | 17 January 2013 | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 9 (TAC No. MD6311), and Status of Generic Communications for Unit 2 -Revision 9 |
ML13036A245 | 17 January 2013 | OL - TVA Letter to Nrc_Regulatory Framework Submittal Letter Rev 9 |
ML12242A476 | 27 August 2012 | Update to Technical Specification (TS) Table 3.3.3-1 and Technical Specification Bases (Tsbs) 3.3.3 |
ML12261A173 | 27 August 2012 | OL - TVA Letter to NRC_08-27-2012__TS Table 3.3.3-1 and Tsb 3.3.3 |
ML12261A172 | 27 August 2012 | OL - 2012-08-27 - WBN Project Plan - Unit 2.pdf |
ML12244A070 | 23 August 2012 | Final Safety Analysis Report (Fsar), Amendment 109 - Section 5, Reactor Coolant System - Page 5-I Through 5.6-8 |
ML12235B361 | 20 August 2012 | OL - 2012-08-20 - WBN Project Plan - Unit 2.pdf |
ML12235B362 | 16 August 2012 | OL - TVA Letter to NRC_2012-08-15 - Regulatory Framework Submittal Letter Rev 8 |
ML12235B360 | 16 August 2012 | OL - 2012-08-16 - WBN Project Plan - Unit 2.pdf |
ML12234A688 | 15 August 2012 | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 8 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 8 |
ML12235B359 | 13 August 2012 | OL - 2012-08-13 - WBN Project Plan - Unit 2.pdf |
ML12227A434 | 6 August 2012 | OL - |
ML12216A381 | 30 July 2012 | OL - 2012-07-30 - WBN Project Plan - Unit 2.pdf |
ML12216A375 | 23 July 2012 | OL - 2012-07-23 - WBN Project Plan - Unit 2.pdf |
ML12216A372 | 19 July 2012 | OL - 2012-07-19 - WBN Project Plan - Unit 2.pdf |
ML12216A370 | 12 July 2012 | OL - 2012-07-12 - WBN Project Plan - Unit 2.pdf |
ML12216A369 | 12 July 2012 | OL - 2012-07-12 - WBN Project Plan - Unit 2.pdf |
ML12181A221 | 28 June 2012 | OL - 2012-06-28 - WBN Project Plan - Unit 2.pdf |
ML12179A172 | 25 June 2012 | OL - 2012-06-25 - WBN Project Plan - Unit 2.pdf |