Semantic search

Jump to navigation Jump to search
 Issue dateTitle
WBL-23-045, 10 CFR 50.59 Summary Report7 November 202310 CFR 50.59 Summary Report
WBL-22-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual11 May 2022Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual
CNL-21-010, Correction of Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology (WBN-TS-19-04) (EPID26 January 2021Correction of Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology (WBN-TS-19-04) (EPID L
CNL-20-016, Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23)22 June 2020Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23)
CNL-19-051, Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology17 January 2020Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology
CNL-18-067, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14)12 October 2018Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14)
NL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System17 November 2017Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System.
CNL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power Syste17 November 2017Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System.
ML17334A1702 November 2017Amendment 1 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System
CNL-17-098, Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels27 July 2017Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels
ML17180A02411 July 2017Issuance of Amendment Regarding One-Time Extension of Intervals for Specified Surveillance Requirements
CNL-17-085, Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels7 July 2017Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels
ML17165A49314 June 2017302 Final Simulator Scenarios
ML17165A48314 June 2017302 Draft Simulator Scenarios
ML16257A72113 September 2016Initial Exam 2016-301 Final SRO Written Exam - Delay Release 2 Years
ML15251A58722 October 2015Issuance of Facility Operating License No. NPF-96 Watts Bar Nuclear Plant, Unit 2
ML15301A14022 October 2015Current Facility Operating License NPF-96, Tech Specs, Revised 11/08/2017
NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 5.0 - Reactor Coolant System11 September 2015Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 5.0 - Reactor Coolant System
ML15279A27211 September 2015Amendment 114 to Final Safety Analysis Report, Section 5.0 - Reactor Coolant System
CNL-15-137, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 13 (TAC No. MD6311) and Status of Generic Communications for Unit 2 - Revision 1327 July 2015Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 13 (TAC No. MD6311) and Status of Generic Communications for Unit 2 - Revision 13
CNL-15-104, Submittal of Revision 106, Appendix C to Central Emergency Control Center, Radiological Emergency Plan15 June 2015Submittal of Revision 106, Appendix C to Central Emergency Control Center, Radiological Emergency Plan
CNL-14-154, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 12 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 122 September 2014Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 12 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 12
ML14170A04516 June 2014Attachment 1 - TS Developmental Revision I Changes (Mark-Up) for WBN Unit 2
ML14160B10530 May 2014Final Safety Analysis Report, Amendment 112, Section 5.0, Reactor Coolant System
ML14080A02311 March 2014Submittal of Pre-Operational Test Instruction
ML14055A27618 February 2014Pre-Operational Test Instruction 2-PTI-063-01, Safety Injection System SIS Integrated Test.
ML13357A05312 December 2013Technical Specifications
ML13357A05012 December 2013Synopsis of Revisions Included in Watts Bar Unit 2 Developmental Revision H of Technical Specifications and Technical Specification Bases. Part 1 of 2
ML13255A27914 August 2013Final Safety Analysis Report (Fsar), Amendment 110, Section 5, Reactor Coolant System
ML13210A06326 July 2013Initial Exam 2013-301 Final Administrative JPMs
ML13213A19425 July 2013Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 10 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 10
ML13023A31517 January 2013Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 9 (TAC No. MD6311), and Status of Generic Communications for Unit 2 -Revision 9
ML13036A24517 January 2013OL - TVA Letter to Nrc_Regulatory Framework Submittal Letter Rev 9
ML12242A47627 August 2012Update to Technical Specification (TS) Table 3.3.3-1 and Technical Specification Bases (Tsbs) 3.3.3
ML12261A17327 August 2012OL - TVA Letter to NRC_08-27-2012__TS Table 3.3.3-1 and Tsb 3.3.3
ML12261A17227 August 2012OL - 2012-08-27 - WBN Project Plan - Unit 2.pdf
ML12244A07023 August 2012Final Safety Analysis Report (Fsar), Amendment 109 - Section 5, Reactor Coolant System - Page 5-I Through 5.6-8
ML12235B36120 August 2012OL - 2012-08-20 - WBN Project Plan - Unit 2.pdf
ML12235B36216 August 2012OL - TVA Letter to NRC_2012-08-15 - Regulatory Framework Submittal Letter Rev 8
ML12235B36016 August 2012OL - 2012-08-16 - WBN Project Plan - Unit 2.pdf
ML12234A68815 August 2012Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 8 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 8
ML12235B35913 August 2012OL - 2012-08-13 - WBN Project Plan - Unit 2.pdf
ML12227A4346 August 2012OL -
ML12216A38130 July 2012OL - 2012-07-30 - WBN Project Plan - Unit 2.pdf
ML12216A37523 July 2012OL - 2012-07-23 - WBN Project Plan - Unit 2.pdf
ML12216A37219 July 2012OL - 2012-07-19 - WBN Project Plan - Unit 2.pdf
ML12216A37012 July 2012OL - 2012-07-12 - WBN Project Plan - Unit 2.pdf
ML12216A36912 July 2012OL - 2012-07-12 - WBN Project Plan - Unit 2.pdf
ML12181A22128 June 2012OL - 2012-06-28 - WBN Project Plan - Unit 2.pdf
ML12179A17225 June 2012OL - 2012-06-25 - WBN Project Plan - Unit 2.pdf