Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | 6 January 2022 | Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections |
IR 05000261/2020004 | 9 February 2021 | Integration Inspection Report 05000261/2020004 and Independent Spent Fuel Storage Fuel Storage Installation Inspection (ISFSI) Report 0720060/2020002 |
ML20090F893 | 29 April 2020 | Relief Request RA-19-0138 Regarding Proposed Alternative to ASME Code, Section XI Volumetric Examination Frequency Requirements |
ML19128A326 | 20 June 2019 | Alternative to Depth Sizing Qualification Examination of Welds |
RA-18-0180, Supplement to Relief Request for an Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 | 12 November 2018 | Supplement to Relief Request for an Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 |
ML18074A005 | 15 March 2018 | Heat Sink Emailed Heat Sink RFI Request 2018 |
ML17298A878 | 25 September 2017 | Revision 27 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and Activities |
RNP-RA/14-0125, Response to NRC Request for Additional Information Related to Refueling Outage 28 Steam Generator Tube Inspection Report | 13 November 2014 | Response to NRC Request for Additional Information Related to Refueling Outage 28 Steam Generator Tube Inspection Report |
ML14188B019 | 7 July 2014 | Environmental Report, Amendment 6 |
ML14112A471 | 2 May 2014 | Conference Call Summary - Regarding the Spring 2014 Steam Generator Inspections During a Forced Outage |
IR 05000261/2014002 | 29 April 2014 | IR 05000261-14-002, Duke Energy Progress, Inc.: 1/01/2014-3/31/2014; H.B. Robinson Steam Electric Plant, Unit 2; Fire Protection, Inservice Inspection Activities, Maintenance Effectiveness, Operability Determinations |
PNO-II-14-004, H. B. Robinson Unit 2 Shutdown Due to Steam Generator Tube Leak | 7 April 2014 | PNO-II-14-004: H. B. Robinson Unit 2 Shutdown Due to Steam Generator Tube Leak |
ML13198A367 | 29 August 2013 | Issuance of an Amendment to Revise the Steam Generator Program Inspection Frequencies and Tube Sample Selection and Application of Permanent Alternate Repair Criteria (H*) |
ML12278A399 | 31 August 2012 | WCAP-17077-NP, Rev 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals at Robinson Nuclear Plant |
IR 05000261/2012003 | 30 July 2012 | IR 05000261-12-003 and 05000261-12-502, Carolina Power and Light Company; on 4/01/2012-6/30/2012; H.B. Robinson Steam Electric Plant, Unit 2; Maintenance Effectiveness, Performance Indicator Verification |
ML12167A215 | 13 July 2012 | Relief Request (RR)-6 for the Fifth 10-Year Interval Inservice Inspection Program Plan |
RNP-RA/12-0037, Response to NRC Request for Additional Information Related to the Proposed Nickel-Alloy Nozzles and Penetrations Program Inspection Plan | 12 April 2012 | Response to NRC Request for Additional Information Related to the Proposed Nickel-Alloy Nozzles and Penetrations Program Inspection Plan |
RNP-RA/12-0023, Inservice Inspection Program for the Fifth Ten-Year Interval | 14 March 2012 | Inservice Inspection Program for the Fifth Ten-Year Interval |
RNP-RA/10-0130, Steam Generator Tube Inspection Report | 13 January 2011 | Steam Generator Tube Inspection Report |
ML103010406 | 28 December 2010 | Review of Refueling Outage 25 Inspections of the Reactor Vessel Nozzle Dissimilar Metal Butt Welds |
IR 05000261/2010003 | 28 July 2010 | IR 05000261-10-003, on 04/01/2010 - 06/30/2010, Carolina Power and Light Company, H. B. Robinson Steam Electric Plant, Unit 2, Identification and Resolution of Problems |
IR 05000261/2010010 | 3 June 2010 | IR 05000261-10-010; on 05/03/2010 - 05/07/2010; H.B. Robinson Steam Electric Plant, Unit 2; Post-Approval Site Inspection for License Renewal |
RNP-RA/10-0034, Revised Nickel-Alloy Nozzles and Penetrations Program Inspection Plan | 13 April 2010 | Revised Nickel-Alloy Nozzles and Penetrations Program Inspection Plan |
IR 05000261/2010008 | 12 April 2010 | IR 05000261-10-008; 02/08/2010 - 02/26/2010; H.B. Robinson Steam Electric Plant, Unit 2; Post Approval Site Inspection for License Renewal |
ML100970495 | 7 April 2010 | IR 05000261-10-008; 02/08/2010 - 02/26/2010; H.B. Robinson Steam Electric Plant, Unit 2; Post Approval Site Inspection for License Renewal |
RNP-RA/09-0081, WCAP-17077-NP, Revision 0, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals at Robinson Nuclear Plant. | 31 July 2009 | WCAP-17077-NP, Revision 0, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals at Robinson Nuclear Plant. |
RNP-RA/09-0067, Nickel-Alloy Nozzles and Penetrations Program Inspection Plan | 29 July 2009 | Nickel-Alloy Nozzles and Penetrations Program Inspection Plan |
IR 05000261/2008005 | 27 January 2009 | IR 05000261-08-005, on 10/01/2008 - 12/31/2008, H.B. Robinson Steam Electric Plant, Unit 2, Routine Integrated Report |
ML083470836 | 8 December 2008 | Results of MRP-139 Inspections of the Reactor Vessel Nozzle Dissimilar Metal Butt Welds During Refueling Outage 25 |
RNP-RA/08-0047, Response to NRC Request for Additional Information on the Steam Generator Inservice Inspection Results | 30 April 2008 | Response to NRC Request for Additional Information on the Steam Generator Inservice Inspection Results |
IR 05000261/2007003 | 27 July 2007 | IR 05000261-07-003, Carolina Power and Light Company; on 04/01/2007-06/30/2007; H.B. Robinson Steam Electric Plant, Unit 2 |
ML071920158 | 27 June 2007 | Comment (23) of Charles A. Tomes on Proposed Rules Pr 50 Regarding Industry Codes and Standards; Amended Requirements |
ML071770248 | 15 June 2007 | Comment (16) Submitted by Charles A. Tomes on Proposed Rule Pr 50 Regarding Industry Codes and Standards; Amended Requirements |
RNP-RA/05-0045, Response to NRC Request for Additional Information on the Steam Generator Inservice Inspection Results | 25 May 2005 | Response to NRC Request for Additional Information on the Steam Generator Inservice Inspection Results |
IR 05000261/2004005 | 28 January 2005 | IR 05000261-04-005, IR 07200003-04-002, on 09/12/2004 - 12/31/2004, Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit 2; Emergency Preparedness |
ML043640546 | 20 December 2004 | CP&L on Robinson, Unit 2 Meeting Summary Via Conf Call on 5/6/04 Spring 2004 Steam Generator Inspections |
ML040370024 | 6 February 2004 | September 25, 2003 Summary of Meeting with Carolina Power & Light Company to Discuss Request for Relaxation from Order for Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized-water Reactors |
ML040200985 | 20 January 2004 | Section 3 - Aging Management Reviews |
RNP-RA/03-0414, Supplement to the Request for Relaxation from the Order for Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors (EA-03-009) | 21 November 2003 | Supplement to the Request for Relaxation from the Order for Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors (EA-03-009) |
ML032370443 | 25 August 2003 | SER-Section 3, Aging Management Review |
ML032370407 | 25 August 2003 | SER-Cover Page, H. B. Robinson |
RNP-RA/03-0084, Response to NRC Request for Additional Information on Steam Generator for Inservice Inspection Results | 16 July 2003 | Response to NRC Request for Additional Information on Steam Generator for Inservice Inspection Results |
RNP-RA/03-0031, Response to Request for Additional Information Re Application for Renewal of Operating License, Attachment III, Pages 356 - 504 | 28 April 2003 | Response to Request for Additional Information Re Application for Renewal of Operating License, Attachment III, Pages 356 - 504 |
ML030640168 | 5 March 2003 | Summary of December 17, 18, and 19, 2002, and January 8, 2003, Meeting and Telephone Conference on January 16, 2003, with Progress Energy Concerning Requests for Additional Information Pertaining to the H. B. Robinson Steam Electric Plant |
RNP-RA/02-0175, Submittal of Results of Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspections Performed During Refueling Outage 21 | 13 December 2002 | Submittal of Results of Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspections Performed During Refueling Outage 21 |
RNP-RA/02-0093, Response to NRC Request for Additional Information on Steam Generator Inservice Inspection Results | 3 July 2002 | Response to NRC Request for Additional Information on Steam Generator Inservice Inspection Results |
ML20079G427 | 17 January 1984 | Suppl to Answer to First Set of Interrogatories & Request to Produce |
ML20082U124 | 1 December 1983 | Responds to NRC Re Violations Noted in IE Insp Rept 50-261/83-26.Corrective Actions:Individual Excluded from Radiation Control Area Until Contamination Incident Resolved.Bioassay Program Initiated |
ML20081F857 | 12 September 1983 | Ro:On 830905,facility Shut Down Due to Secondary Leak in Steam Generator A.Two Tubes Exhibited through-wall Indications Which Should Have Been Plugged.Tubes Plugged & Tested Satisfactorily |
ML20028D244 | 7 January 1983 | Updated LER 80-009/01T-1:on 800414,primary to Secondary Leak of Approx 0.5 Gpm Detected in B Steam Generator,Exceeding Tech Spec Limit.Caused by Leaking Tubes.Leaks Repaired by Explosive Plugging |