MONTHYEARIR 05000261/20240032024-10-30030 October 2024 Integrated Inspection Report 05000261/2024003 ML24297A2182024-10-28028 October 2024 – NRC Operator License IR 05000261/20244022024-10-16016 October 2024 – Security Target Set Baseline Inspection Report 05000261/2024402 IR 05000261/20244012024-09-11011 September 2024 Security Baseline Inspection Report 05000261/2024401 IR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 ML24169A2712024-08-14014 August 2024 – Issuance of Amendment No. 280 to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification 5.7, High Radiation Area IR 05000261/20240022024-08-0101 August 2024 Integrated Inspection Report 05000261/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000261/20240112024-06-0303 June 2024 Focused Engineering Inspection- Commercial Grade Dedication Report 05000261/2024011 ML24114A0152024-06-0303 June 2024 Unit 2 – Issuance of Amendment No. 279 Regarding Application of Leak-Before-Break Methodology for Auxiliary Reactor Coolant System Piping IR 05000261/20240012024-05-0909 May 2024 Integrated Inspection Report 05000261/2024001 IR 05000261/20240102024-04-30030 April 2024 Biennial Problem Identification and Resolution Inspection Report 05000261/2024010 IR 05000261/20230062024-02-28028 February 2024 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261-2023006 IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 ML24033A0592024-02-0202 February 2024 Response to Request for Additional Information License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology IR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 – Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 – Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) 05000261/LER-2023-002, Plant Trip During Reactor Protection System Testing2023-08-17017 August 2023 Plant Trip During Reactor Protection System Testing 05000261/LER-2023-001, Condition Prohibited by Technical Specification Due to Missed Entry Into Limiting Condition for Operation2023-08-10010 August 2023 Condition Prohibited by Technical Specification Due to Missed Entry Into Limiting Condition for Operation IR 05000261/20230022023-08-0707 August 2023 – Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 – Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 – Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 – Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 2024-09-11
[Table view] Category:Safety Evaluation
MONTHYEARML24169A2712024-08-14014 August 2024 – Issuance of Amendment No. 280 to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification 5.7, High Radiation Area ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24114A0152024-06-0303 June 2024 Unit 2 – Issuance of Amendment No. 279 Regarding Application of Leak-Before-Break Methodology for Auxiliary Reactor Coolant System Piping ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22193A2122022-08-0404 August 2022 Request of Alternatives to ASME Code Section XI Subsection IWE Requirements for Containment Inspections ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML21259A0992021-11-0404 November 2021 Proposed Alternatives to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML21242A2982021-09-21021 September 2021 Proposed Alternative to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML21155A2132021-08-26026 August 2021 Plant ML21214A2222021-08-10010 August 2021 Proposed Alternatives to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML21209A9962021-08-0202 August 2021 Proposed Alternative Request IST-RR-8 Related to the Inservice Testing Program ML21202A3982021-07-27027 July 2021 Relief Request Proposed Alternatives to American Society of Mechanical Engineers Operation and Maintenance Code Isolation Valve Seal Water System ML21113A0132021-05-0606 May 2021 Request for Use of a Later Edition of ASME Boiler and Pressure Vessel Code, Section XI for Repair and Replacement Activities ML21029A3352021-02-16016 February 2021 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20300A2062020-11-0909 November 2020 Duke Fleet - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20258A2712020-09-21021 September 2020 Correction Letter to Amendment Nos. 301, 329, 307, 303, 178, 317, 296, 416, 418, 417, and 268 ML20083F9272020-08-12012 August 2020 Issuance of Amendments to Relocate the Unit/Facility/Plant Staff Qualification Requirements to the Duke Energy Quality Assurance Program Description ML20097F0882020-06-19019 June 2020 Relief Request RA-19-0106 Regarding Proposed Alternative to ASME Code Case N-729-4 Volumetric or Surface Examination Requirements EPID-L-2019-LLR-0065) ML20058E8992020-06-18018 June 2020 Issuance of Amendment No. 267 Regarding Change to Surveillance Requirement 3.8.2.1 ML20021A0132020-02-19019 February 2020 Request for Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML19205A2892019-09-24024 September 2019 Issuance of Amendment No. 266 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML19254A6202019-09-17017 September 2019 Duke Energy Fleet (Brunswick, Catawba, Robinson, McGuire, Oconee, and Shearon Harris) - Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography ML19158A3072019-08-15015 August 2019 Issuance of Amendment No. 265, Regarding Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs ML19128A3262019-06-20020 June 2019 Alternative to Depth Sizing Qualification Examination of Welds ML19121A4822019-06-11011 June 2019 Staff Evaluation the 2017 Annual Report of Changes and Error Corrections Affecting the Large-Break Loss-of-Coolant Accident Analysis ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins ML18288A1392019-04-29029 April 2019 Issuance of Amendments 171, 263 Revising Technical Specifications to Support Self Performance of Core Reload Design and Safety Analyses ML19050A2972019-04-18018 April 2019 McGuire Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, H B. Robinson Steam Electric Plant, Unit 2 - Issuance of Amendments Regarding Removal ML18200A0422018-08-16016 August 2018 Issuance of Amendment No. 260 Regarding Request to Revise Technical Specification Reactor Coolant System Pressure and Temperature Limits to Reflect 24-Month Fuel Cycles ML18172A1722018-08-15015 August 2018 Issuance of Amendments to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application ML18115A1502018-05-25025 May 2018 Issuance of Amendment 258 Regarding Request to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (CAC No. MF9544; EPID L-2017-LLA-0206) ML18060A4012018-04-10010 April 2018 Redacted Issuance of Amendments Revising TSs for Methodology Reports DPC-NE-3008-P, Revision 0, and DPC-NE-3009-P, Revision 0) (CAC Nos. MF8439 and MF8440; EPID L-2016-LLA-0012) ML17331A0862017-12-26026 December 2017 Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads ML17188A3872017-08-21021 August 2017 Issuance of Amendments Regarding Application to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes (CAC Nos. MF7650 Through MF7660) ML17102A9232017-05-18018 May 2017 Nonproprietary Issuance of Amendments Revising Technical Specifications for Methodology Reports DPC Ne 1008 P Revision 0, DPC Nf 2010 Revision 3 and DPC Ne 2011 P Revision 2 (CAC Nos. MF6648, MF6649, MF7693/MF7694) ML17055A6472017-05-0808 May 2017 Brunswick, Catawba, McGuire, Shearon Harris, and H. B. Robinson - Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-522, Revision 0 (CAC Nos. MF8422, MF8423, MF8424, MF8425, MF8426, MF8427, MF8428, and MF8429) ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML17039A1532017-03-23023 March 2017 H.B. Robinson, Unit 2 - Issuance of Amendment 250 to Adopt Technical Specification Task Force (TSTF) Change Traveler TSTF-339, Revision 2, "Relocate TS Parameters to the COLR," Consistent with WCAP-14483 (CAC No. MF7615) ML16337A2642017-02-0303 February 2017 Issuance of Amendments Regarding National Fire Protection Association Standard 805 2024-08-14
[Table view] Category:Code Relief or Alternative
MONTHYEARML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-02-17017 February 2023 Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML21259A0992021-11-0404 November 2021 Proposed Alternatives to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML21214A2222021-08-10010 August 2021 Proposed Alternatives to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML21209A9962021-08-0202 August 2021 Proposed Alternative Request IST-RR-8 Related to the Inservice Testing Program ML21202A3982021-07-27027 July 2021 Relief Request Proposed Alternatives to American Society of Mechanical Engineers Operation and Maintenance Code Isolation Valve Seal Water System ML21068A4172021-03-17017 March 2021 Summary of Meeting with Duke Energy Progress, LLC, Regarding a Proposed Relief Request Concerning Containment Inspections of Liners and Moisture Barriers for the H. B. Robinson Steam Electric Plant, Unit 2 ML21029A3352021-02-16016 February 2021 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20090F8932020-04-29029 April 2020 Relief Request RA-19-0138 Regarding Proposed Alternative to ASME Code, Section XI Volumetric Examination Frequency Requirements RA-19-0428, Relief Request RA-19-0428 for One-Time Pressure Relief Valve Test Frequency Extension2020-02-0404 February 2020 Relief Request RA-19-0428 for One-Time Pressure Relief Valve Test Frequency Extension ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins RA-19-0026, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001)2019-02-11011 February 2019 Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001) RA-18-0180, Supplement to Relief Request for an Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 22018-11-12012 November 2018 Supplement to Relief Request for an Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 ML17331A0862017-12-26026 December 2017 Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads RNP-RA/13-0018, Relief Request (RR)-8 from Fifth Ten-Year Inservice Inspection Program Plan2013-03-13013 March 2013 Relief Request (RR)-8 from Fifth Ten-Year Inservice Inspection Program Plan ML12314A2882012-12-11011 December 2012 Relief Request-2 for the Fifth 10-Year Interval Inservice Testing Program Plan RNP-RA/12-0113, Response to Request for Additional Information Related to Relief Request (RR)-07 from Immediate ASME Code Repair of Refueling Water Storage Tank Drain Value (SI-837) for Fifth Ten-Year Inservice Inspection...2012-10-25025 October 2012 Response to Request for Additional Information Related to Relief Request (RR)-07 from Immediate ASME Code Repair of Refueling Water Storage Tank Drain Value (SI-837) for Fifth Ten-Year Inservice Inspection... RNP-RA/12-0101, Relief Request (RR)-7 from Immediate ASME Code Repair of Refueling Water Storage Tank Drain Value (SI-837) for Fifth Ten-year Inservice Inspection Program Plan2012-10-0505 October 2012 Relief Request (RR)-7 from Immediate ASME Code Repair of Refueling Water Storage Tank Drain Value (SI-837) for Fifth Ten-year Inservice Inspection Program Plan ML12262A3622012-10-0101 October 2012 Relief Request No. 2 for the Fifth 10-Year Interval Inservice Inspection Program Plan RNP-RA/12-0079, Revised Response to NRC Request for Additional Information Related to Relief Request (RR)-2 for the Fifth Ten-Year Interval Inservice Testing Program Plan2012-08-0909 August 2012 Revised Response to NRC Request for Additional Information Related to Relief Request (RR)-2 for the Fifth Ten-Year Interval Inservice Testing Program Plan ML12181A1262012-07-13013 July 2012 Relief Request-4 for the Fifth 10-Year Interval Inservice Inspection Program Plan ML12174A0182012-07-13013 July 2012 Relief Request-1 for the Fifth 10-Year Interval Inservice Testing Program ML12174A0102012-07-13013 July 2012 Relief Request -3 for Fifth 10-Year Interval Inservice Testing Program Plan ML12167A2152012-07-13013 July 2012 Relief Request (RR)-6 for the Fifth 10-Year Interval Inservice Inspection Program Plan ML12115A0692012-05-0404 May 2012 Request for Additional Information Related to Relief Requests RR-5 and RR-6 for the Fifth Ten-Year Interval Inservice Inspection Program Plant RNP-RA/08-0129, Request for Extension for Implement Ion of License Amendment Related to Control Room Habitability2009-01-0707 January 2009 Request for Extension for Implement Ion of License Amendment Related to Control Room Habitability ML0827302702008-10-22022 October 2008 Request for Relief from ASME Code, Section XI, Appendix Viii, Supplement 2 and Supplement 10 Weld Examination Requirements ML0427400822004-09-29029 September 2004 Third 10-Year Interval Inservice Inspection Program Plan Request for Relief No. 34 ML0411702632004-04-21021 April 2004 Relief, ASME Code, Section XI, Appendix Viii, Supplement 10, Qualification Requirements for Inspection of Dissimilar Metal Piping Welds, for the Fourth 10-year Inservice Inspection (ISI) Interval, MC1639 RNP-RA/03-0125, Inservice Testing Program, Relief Request IST-RR-8 for Comprehensive Tests2003-10-0707 October 2003 Inservice Testing Program, Relief Request IST-RR-8 for Comprehensive Tests ML0233101712002-11-26026 November 2002 Relief, Examination of Control Rod Drive Mechanism Housing Seal Weld 2023-09-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555"()001 July 13, 2012 Mr. William R. Gideon, Vice President Carolina Power & Ught Company H. B. Robinson Steam Electric Plant, 3581 West Entrance Road Hartsville, South Carolina 29550
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO.2 - RELIEF REQUEST-6 FOR THE FIFTH 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN (TAC NO. ME8257)
Dear Mr. Gideon:
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated March 14, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12082A009), as supplemented by letter dated May 10, 2012 (ADAMS Accession No. ML12138A010), Carolina Power & Ught Company (the licensee), doing business as Progress Energy Carolinas, Inc.,
submitted Relief Request-6 for the Inservice Inspection (lSI) Program Plan for the fifth 10-year Interval for the H. B. Robinson Steam Electric Plant, Unit No.2 (HBRSEP).
The relief requested approval to use a proposed alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," Table IWB-2500-1, for the required outside diameter surface examinations of the pressure retaining dissimilar metal welds in the reactor pressure vessel hot and cold leg nozzles at HBRSEP. Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 50.55a(a)(3)(ii), the licensee requested to use proposed alternatives on the basis that the alternatives provide an acceptable level of quality and safety.
The fourth 10-year interval in HBRSEP began on February 19, 2002, and was scheduled to end on February 18, 2012. As allowed by ASME Section XI, IWA-2430(d)1 the licensee extended the fourth 10-year interval through July 20,2012, to complete the refueling outage-27 which was postponed to January 18, 2012. The duration of proposed alternative is for the fifth10-year lSI interval that begins on July 21, 2012, and ends on February 18, 2022.
As discussed with the licensee on July 9,2012, the NRC staff is concerned with the amount of information provided in the submittal that required revision after review by and questions from the NRC staff, and your request for multiple concurrent reviews with a short review timeframe.
The uncharacteristic inattention to detail observed in the submittal resulted in the need to focus limited resources to address mostly administrative issues. Additional attention to ensure a high quality submittal would allow for a more efficient use of review resources, and better ability of the NRC staff to accommodate requests for a shortened review timeframe.
The details of the NRC staff review are included in the enclosed safety evaluation. The NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(a)(3)(ii) and, therefore, is in compliance with the ASME Code requirements.
W. Gideon - 2 Therefore, the licensee's proposed alternative is authorized in accordance with 10 CFR 50.55a(a)(3)(ii) for the fifth 1O-year lSI interval at HBRSEP, which begins on July 21, 2012, and ends on February 18, 2022.
Sincerely, IRA by Eva Brown forI Douglas A. Broaddus, Chief Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-261
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION ON THE FIFTH 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM RELIEF REQUEST-6 CAROLINA POWER & LIGHT COMPANY H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO.2 DOCKET NO. 50-261
1.0 INTRODUCTION
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated March 14, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12082A009), as supplemented by letters dated May 10, 2012 (ADAMS Accession No. ML12138A010), Carolina Power & Light Company, doing business as Progress Energy Carolinas, Inc., submitted Relief Request (RR)-6 for the Inservice Inspection (lSI) Program Plan for the fifth 10-year Interval for the H. B. Robinson Steam Electric Plant, Unit No.2 (HBRSEP).
The relief requested approval to use a proposed alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," Table IWB-2500-1, related to the ASME Code Class 1 outside diameter (00) surface examinations of the pressure retaining dissimilar metal (OM) welds in the reactor pressure vessel (RPV) hot and cold leg nozzles.
The fourth 10-year interval in HBRSEP began on February 19, 2002, and was scheduled to end on February 18, 2012. As allowed by ASME Section XI, IWA-2430(d)1 the licensee extended the fourth 10-year interval through July 20, 2012, to complete the refueling outage (RO)-27 which was postponed to January 18, 2012. The ASME Code of record for the fifth 10-year lSI interval at HBRSEP is the ASME Code,Section XI, 2007 Edition with 2008 Addenda. The duration of proposed alternative is for the fifth10-year lSI interval that begins on July 21,2012, and ends on February 18, 2022.
2.0 REGULATORY EVALUATION
Title 10 of the Code of Federal Regulations (10 CFR), Section 50.55a(g)(4), specifies that ASME Code Class 1, 2, and 3, components (including supports) must meet the requirements, except for the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that inservice examination of components and system pressure tests conducted during the first
-2 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code, incorporated by reference in 10 CFR SO. SSa(b),
12-months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein.
Paragraph 10 CFR SO.SSa(a)(3) states, in part, that alternatives to the requirements of 10 CFR SO.SSa(g) may be used, when authorized by the NRC, if the licensee demonstrates (i) the proposed alternatives would provide an acceptable level of quality and safety or if (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The licensee requested authorization of an alternative to the requirements of Table IWB-2S00-1 of Section XI of the ASME Code pursuant to 10 CFR SO.SSa(a)(3)(ii).
The NRC staff has previously authorized this alternative for HBRSEP for the fourth lSI 10-year interval on September 26, 2002, (ADAMS Accession No. ML0227006010).
3.0 TECHNICAL EVALUATION
The NRC staff has evaluated the information provided by the licensee in support of the request for relief from, or alternative to, the ASME Code requirements and the bases for disposition are documented below.
3.1 ASME Code RequirementsSection XI, 2007 Edition with 2008 Addenda of the ASME Code, Table IWB-2S00-1, Examination Category B-F, Item No. BS.10, requires volumetric and surface examinations of the RPV nozzle-to-safe end welds in accordance with Figure IWB-2S00-8.
3.2 Component for which Relief is Requested Component description:
ASME Code Class: Class 1 Examination Category: B-F, Item No. BS.10, Table IWB-2S00-1 Component: RPV Hot and Cold Leg Nozzle-to-Safe End DM Butt Welds System: Reactor Coolant System The components for which relief is requested are listed below:
Weld Identification No. Location CPL-1 07/1 DM Hot Leg "A" CPL-107/14DM Cold Leg "A" CPL-107A11DM Hot Leg "B" CPL-107A114DM Cold Leg "B" CPL-107B/1DM Hot Leg "C" CPL-107B/14DM Cold Leg "C"
-3 3.3 Licensee's Basis for Relief Request The licensee stated in the March 24, 2012, submittal that the examination of RPV nozzle-to-safe end welds was not considered as part of the original plant design, which occurred prior to issuance of the ASME Code,Section XI, lSI requirements. The access to the affected welds from the refueling cavity is significantly limited. Additionally, due to the configuration of the RPV nozzles as they penetrate the biological shield wall, the weld area accessible for the required examinations is approximately the top one-third of the weld OD surface.
The licensee stated that significant personnel safety hazards associated with the required surface examinations of the subject RPV nozzle-to-safe end welds are not commensurate with the benefits gained from performing such examination. The access to the affected welds from the refueling cavity involves entry into an area that is physically confining with elevated ambient temperatures. These ambient conditions, combined with the required use of personnel protective equipment, create the potential for heat stress and exhaustion. The licensee indicated that the detailed dose assessments have concluded that performance of the ASME Code,Section XI, required examination is not consistent with the principal of "As Low As Reasonably Achievable (A LA RA)" . For example, with an assumed area radiation dose rate of 600 milli roentgen equivalent man per hour (mRem/hr), the worker exposure for surface examinations of the six affected welds is estimated at approximately 7.5 Rem.
The licensee stated that a review of previous examination history supports the proposed alternative examinations in lieu of the ASME Code,Section XI, required surface examinations.
The licensee performed a surface examination on the accessible portions of the subject welds during the second 10-year lSI interval and identified no indications. For the third 10-year lSI interval, (1) the NRC staff granted a relief from surface examination requirements on September 29,2004 (ADAMS Accession No. ML042740082), and (2) the licensee performed a visual test (VT)-2 examination from the refueling floor through the access hatch.
The licensee stated that the subject DM welds as well as the safe end-to-pipe welds were volumetrically examined at the conclusion of the third 10-year lSI interval. The licensee identified two volumetric indications in the hot leg "B" safe end on the nozzle side, and one in the cold leg "C" nozzle side. The licensee evaluated the three volumetric indications in accordance with the ASME Code,Section XI, requirements and found them acceptable.
During (RO)-25, the fourth 10-year lSI interval, the licensee examined the DM welds in accordance with the Material Reliability Program - 139, "Material Reliability Program: Primary System Piping Butt Weld Inspection and Evaluation Guideline," utilizing a phased array ultrasonic testing (UT) technique. The licensee identified volumetric indications in all three hot leg DM welds and the "B" loop on the cold leg DM weld, and the volumetric indications were validated as not inside diameter (ID)-surface connected by eddy current testing (ECT). The licensee scheduled successive examinations during the last outage of the fourth 10-year lSI interval, RO-27, and has planned mitigation activities during the first RO of the fifth 10-year lSI interval, RO-28.
- 4 3.4 Licensee's Proposed Alternative Examination The licensee stated that as an alternative to the required surface examination, the VT-2 examinations will be conducted in accordance with requirements of IWA-S242 "Insulated Components" of the 2007 Edition with 2008 Addenda of the ASME Code,Section XI.
The licensee stated that the subject welds will be inspected as required by Section XI of the ASME Code. The licensee indicated that UT examinations will be conducted from the 00 surface of the RPV nozzle during the fifth 10-year lSI interval and the examination will include the required weld volume (Le., lower one-third as well as heat-affected zone). In addition, the licensee stated that subject welds are being examined. according to the requirements of 10 CFR SO.SSa(g)(6)(ii)(F). which states, "Licensees of existing, operating pressurized water reactors as of July 21, 2011 shall implement the requirements of ASME Code Case N-770-1, subject to the conditions specified in paragraphs (g)(6)(ii)(F)(2) through (g)(6)(ii)(F)( 10) of 10 CFR SO.SSa, by the first refueling outage after August 22. 2011."
3.S NRC Staff Evaluation The NRC staff evaluated the technical aspects of RR-6 against the criteria contained in 10 CFR SO.SSa(a)(3)(ii) related to the existence of a hardship or unusual difficulty without a compensating increase in quality or safety. The NRC staff finds the first criteria. hardship or unusual difficulty. to be self explanatory. The NRC staff finds that the second criteria can be met if the proposed alternative provides reasonable assurance of structural integrity or leak tightness of the subject components.
The licensee identified volumetric indications in all three RPV hot leg OM welds and the "S" loop of cold leg OM weld by the UT examinations performed from the 10 surface during HSRSEP, fourth 10-year lSI interval. The surface examinations performed by ECT confirmed that the indications were not 10-surface connected. The licensee submitted RR-6 in accordance with the requirements of IWS-3132.3 of Section XI of the ASME Code, which states that the area containing flaw shall be subsequently reexamined in accordance with IWS-2420(b) and (c).
In the letter dated May 10,2012, the licensee stated that the volumetric indications identified were validated as not 10 surface connected. In addition, the licensee stated that during RO-27, the subject OM welds were examined in accordance with ASME Code Case N-770-1, as required by 10 CFR SO.SSa(g)(6)(ii)(F). The licensee also stated that there was essentially no change in the indications between RO-2S and RO-27 (the last RO) in the fourth 10-year lSI interval.
The NRC staff evaluated the licensee's basis for hardship in performing the required ASME Code,Section XI, Table IWS-2S00-1, 00 surface examinations. The NRC staff has determined that the hardship for the licensee is the difficulties associated with accessing the outside surface of the nozzle welds from the refueling cavity, which involves entry into an area that is physically confining with elevated ambient temperatures. The required use of personnel protective equipment combined with working in a confined area with elevated ambient temperature create hazardous condition for personnel safety due to heat stress and exhaustion.
In addition, the personnel would be subject to significant radiation exposure which the license estimated to be at approximately 7.S Rem. Therefore, the NRC staff has determined that the
- 5 potential challenges (Le., safety hazards and radiation exposure) that would be placed on the personnel to comply with the requirements result in hardship or unusual difficulty.
The NRC staff determined that the licensee will conduct VT-2 examinations in accordance with the requirements of IWA-5242 "Insulated Components" of Section XI of the ASME Code as an alternative to the required surface examination. The licensee complied with the requirements of 10 CFR 50.55a(g)(6)(ii)(F), in which is the subject DM welds shall be examined in accordance with the ASME Code Case N-770-1 and the conditions specified in paragraphs (g)(6)(ii)(F)(2) through (g)(6)(ii)(F)(10) of 10 CFR 50.55a.
The NRC staff finds that the licensee's proposal will provide reasonable assurance of structural integrity or leak tightness of the subject components and, as a result, requiring the licensee to make a code compliant repair, as opposed to utilizing the proposed alternative will not result in a compensating increase in the level of quality and safety.
Based on the above, the NRC staff finds that the licensee's proposal meet both technical criteria contained in 10 CFR 50.55a(a)(3)(;0, i.e. the licensee has demonstrated that complying with the specified requirement will result in a hardship or unusual difficulty without a compensating increase in the level of quality and safety.
4.0 CONCLUSION
The NRC staff determines that the proposed alternative provides reasonable assurance of structural integrity or leak tightness of the subject component and that complying with the specified requirement will result in a hardship or unusual difficulty without a compensating increase in the level of quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(a)(3)(ii). Therefore, the NRC staff authorizes the proposed alternative in RR-6 at HBRSEP, for the fifth 10-year lSI interval that begins on July 21,2012, and ends on February 18, 2022.
All other ASME Section XI requirements for which relief was not specifically requested and authorized by the NRC staff will remain applicable including third party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: Ali Rezai Date of issuance: July 13, 2012
- w. Gideon -2 Therefore, the licensee's proposed alternative is authorized in accordance with 10 CFR 50.55a(a)(3)(ii) for the fifth 1O-year lSI interval at HBRSEP, which begins on July 21, 2012, and ends on February 18, 2022.
Sincerely, IRA by Eva Brown fori Douglas A. Broaddus, Chief Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-261
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-2 RlF RidsNrrPMRobinson Resource ARezai, NRR RidsAcrsAcnw MailCenter Resource RidsNrrlABClayton RidsRgn2MailCenter Resource RidsNrrDof1Lpi2-2 Resource RidsOgcRp Resource RidsNrrDeEpnb Resource
- Via Memo DElEPNB/BC' LPL2-2/BC ABiliochCol6n BClayton DAlley(A) ABiliochCol6n 6115112 6120/12 7/13112 OFFI