ML22278A25819 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 09, Auxiliary Systems, Sections 1 Thru 2
ML22278A24719 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A - Design Assessment Report
ML22278A24019 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 3, Section 3.8, Design of Category I Structures
ML22278A22619 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 3, Section 3.9, Mechanical Systems and Components
ML22278A21219 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML22278A20919 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 2, Sections 2.4 Thru 5, Hydrologic Engineering
ML22278A20219 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 01 (003) Sections 7-12
ML21125A2155 May 2021Supplement Application to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Tier 1 Categorization Process in Accordance
ML21133A08029 April 20210 to Updated Final Safety Analysis Report, Chapter 1, Sections 1.1 Though 1.6
ML21133A07729 April 20210 to Updated Final Safety Analysis Report, Chapter 2, Section 2.4, Hydrologic Engineering
ML21133A07229 April 20210 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A, Design Assessment Report
ML21133A06829 April 20210 to Updated Final Safety Analysis Report, Chapter 3, Section 3.8, Design of Category I Structure
ML21133A05229 April 20210 to Updated Final Safety Analysis Report, Chapter 3, Section 3.9
ML21133A05129 April 20210 to Updated Final Safety Analysis Report, Chapter 1, Sections 1.7 Through 1.12
ML21133A09829 April 20210 to Updated Final Safety Analysis Report, Chapter 9, Sections 1 Thru 2
ML21091A0141 April 2021Response to Request for Additional Information - Relief Request I4R-24 Associated with Residual Heat Removal Heat Exchanger Category C-A and C-B Examinations
ML18285A59519 September 2018Revision 19 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML18285A59619 September 2018Revision 19 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics
RS-18-051, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events7 June 2018Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
ML18135A43629 May 2018Report for the Audit of Licensee Responses to Interim Staff Evaluations Open Items Related to NRC Order EA-13-109
ML16357A15819 September 2016Revision 18 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML16357A12019 September 2016Revision 18 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML16357A12619 September 2016Revision 18 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Appendix 3A - Design Assessment Report
RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure26 May 2016Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure
RS-15-301, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions..15 December 2015Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions..
ML12215A28317 April 2015G20110563 - LTR to Lochbaum -- Draft Director'S Decision Re 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs
ML12215A31417 April 2015Proposed Director'S Decision - 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs
ML15069A11217 April 2015G20110563 - Licensee Letter Regarding Draft Director'S Decision to Licensee'S with Mark I and II Containment Design
RS-15-038, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident31 March 2015Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
RS-14-200, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)28 August 2014Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
ML14100A17731 March 2014LTR-14-0199 - Betty and Charlie Shank, Alliance for a Clean Environment (ACE) Ltr. Limerick Nuclear Power Plant - Earthquake Faults
ML13337A60010 January 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)
ML13357A3316 January 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Limerick Generating Station, Units 1 and 2, TAC Nos.: MF0847 and MF0848
RA-13-109, Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns27 November 2013Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
RS-13-138, Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-1387 October 2013Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-138
ML13059A26728 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Hardened Containment Vents (Order Number EA-12-050)
RS-13-022, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
IR 05000352/20120055 February 2013IR 05000352-12-005 and 05000353-12-005; on 10/01/2012 - 12/31/2012 Limerick Generating Station, Units 1 and 2; Licensed Operator Requalification and Post-Maintenance Testing
ML12342A1036 November 2012MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 1 of 12
ML12342A1186 November 2012MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 1 of 13
IR 05000352/201100813 May 2011IR 05000352/2011008 and 05000353/2011008; 04/08/2011 - 04/28/2011; Limerick Generating Station, Units 1 and 2; Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event
ML08318120315 September 2008Draft - Section a Operating Exam (Folder 2)
ML0335603029 December 2003Exelon/Amergen 180-Day Response to NRC Generic Letter 2003-01, Control Room Habitability.
ML20076K64525 October 1994Application for Amend to Licenses NPF-39 & NPF-85 to TS 93-18 Re Change Request That Proposed to Increase Allowable Leak Rate for MSIV & to Delete MSIV LCS
ML20149E7531 August 1994Forwards Response to Rai,Requested by NRC 940506 & 23 Ltrs & During Telcons on 940609 Re TS Change Request 93-18-0, Submitted by Util ,Proposing to Increase Allowable Leak Rate for MSIVs & to Delete MSIV LCS
ML20059K57214 January 1994Application for Amend to Licenses NPF-39 & NPF-85,consisting of Change Request 93-18-0,revising TS to Permit Increase in Allowable Leak Rate for MSIV & to Delete MSIV Leakage Control Sys
ML20059K58314 January 1994Proposed Tech Specs Increasing Allowable Leak Rate for MSIV & Deleting MSIV LCS
ML20059G35010 January 1994Application for Amends to Licenses NPF-39 & NPF-85, Consisting of TS Change Request 93-16-0,relocating Seismic Monitoring Instrumentation Lco,Srs & Associated Bases in TS 3.3.7.2 & 4.3.7.2 to Updated FSAR
ML20059K62626 October 1993SAR Licensing Rept for Spent Fuel Storage Capacity Expansion,Lgs Units 1 & 2
ML20059G33330 June 1990Annual Plant Mod Rept Jul 1989-June 1990