Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML22278A258 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 09, Auxiliary Systems, Sections 1 Thru 2 |
ML22278A247 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A - Design Assessment Report |
ML22278A240 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 3, Section 3.8, Design of Category I Structures |
ML22278A226 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 3, Section 3.9, Mechanical Systems and Components |
ML22278A212 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML22278A209 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 2, Sections 2.4 Thru 5, Hydrologic Engineering |
ML22278A202 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 01 (003) Sections 7-12 |
ML21125A215 | 5 May 2021 | Supplement Application to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Tier 1 Categorization Process in Accordance |
ML21133A080 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 1, Sections 1.1 Though 1.6 |
ML21133A077 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 2, Section 2.4, Hydrologic Engineering |
ML21133A072 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A, Design Assessment Report |
ML21133A068 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 3, Section 3.8, Design of Category I Structure |
ML21133A052 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 3, Section 3.9 |
ML21133A051 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 1, Sections 1.7 Through 1.12 |
ML21133A098 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 9, Sections 1 Thru 2 |
ML21091A014 | 1 April 2021 | Response to Request for Additional Information - Relief Request I4R-24 Associated with Residual Heat Removal Heat Exchanger Category C-A and C-B Examinations |
ML18285A595 | 19 September 2018 | Revision 19 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML18285A596 | 19 September 2018 | Revision 19 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics |
RS-18-051, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 7 June 2018 | Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events |
ML18135A436 | 29 May 2018 | Report for the Audit of Licensee Responses to Interim Staff Evaluations Open Items Related to NRC Order EA-13-109 |
ML16357A158 | 19 September 2016 | Revision 18 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML16357A120 | 19 September 2016 | Revision 18 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML16357A126 | 19 September 2016 | Revision 18 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Appendix 3A - Design Assessment Report |
RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure | 26 May 2016 | Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure |
RS-15-301, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.. | 15 December 2015 | Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.. |
ML12215A283 | 17 April 2015 | G20110563 - LTR to Lochbaum -- Draft Director'S Decision Re 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs |
ML12215A314 | 17 April 2015 | Proposed Director'S Decision - 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs |
ML15069A112 | 17 April 2015 | G20110563 - Licensee Letter Regarding Draft Director'S Decision to Licensee'S with Mark I and II Containment Design |
RS-15-038, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 31 March 2015 | Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
RS-14-200, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 28 August 2014 | Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) |
ML14100A177 | 31 March 2014 | LTR-14-0199 - Betty and Charlie Shank, Alliance for a Clean Environment (ACE) Ltr. Limerick Nuclear Power Plant - Earthquake Faults |
ML13337A600 | 10 January 2014 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) |
ML13357A331 | 6 January 2014 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Limerick Generating Station, Units 1 and 2, TAC Nos.: MF0847 and MF0848 |
RA-13-109, Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | 27 November 2013 | Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns |
RS-13-138, Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-138 | 7 October 2013 | Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-138 |
ML13059A267 | 28 February 2013 | Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Hardened Containment Vents (Order Number EA-12-050) |
RS-13-022, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 28 February 2013 | Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
IR 05000352/2012005 | 5 February 2013 | IR 05000352-12-005 and 05000353-12-005; on 10/01/2012 - 12/31/2012 Limerick Generating Station, Units 1 and 2; Licensed Operator Requalification and Post-Maintenance Testing |
ML12342A103 | 6 November 2012 | MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 1 of 12 |
ML12342A118 | 6 November 2012 | MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 1 of 13 |
IR 05000352/2011008 | 13 May 2011 | IR 05000352/2011008 and 05000353/2011008; 04/08/2011 - 04/28/2011; Limerick Generating Station, Units 1 and 2; Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event |
ML083181203 | 15 September 2008 | Draft - Section a Operating Exam (Folder 2) |
ML033560302 | 9 December 2003 | Exelon/Amergen 180-Day Response to NRC Generic Letter 2003-01, Control Room Habitability. |
ML20076K645 | 25 October 1994 | Application for Amend to Licenses NPF-39 & NPF-85 to TS 93-18 Re Change Request That Proposed to Increase Allowable Leak Rate for MSIV & to Delete MSIV LCS |
ML20149E753 | 1 August 1994 | Forwards Response to Rai,Requested by NRC 940506 & 23 Ltrs & During Telcons on 940609 Re TS Change Request 93-18-0, Submitted by Util ,Proposing to Increase Allowable Leak Rate for MSIVs & to Delete MSIV LCS |
ML20059K572 | 14 January 1994 | Application for Amend to Licenses NPF-39 & NPF-85,consisting of Change Request 93-18-0,revising TS to Permit Increase in Allowable Leak Rate for MSIV & to Delete MSIV Leakage Control Sys |
ML20059K583 | 14 January 1994 | Proposed Tech Specs Increasing Allowable Leak Rate for MSIV & Deleting MSIV LCS |
ML20059G350 | 10 January 1994 | Application for Amends to Licenses NPF-39 & NPF-85, Consisting of TS Change Request 93-16-0,relocating Seismic Monitoring Instrumentation Lco,Srs & Associated Bases in TS 3.3.7.2 & 4.3.7.2 to Updated FSAR |
ML20059K626 | 26 October 1993 | SAR Licensing Rept for Spent Fuel Storage Capacity Expansion,Lgs Units 1 & 2 |
ML20059G333 | 30 June 1990 | Annual Plant Mod Rept Jul 1989-June 1990 |