Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML22325A139 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems |
ML19183A023 | 31 July 2019 | Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 |
NRC-18-0054, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) | 14 December 2018 | Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) |
ML16165A454 | 26 May 2016 | Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems |
NRC-16-0004, Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) and Response to Request for Additional Information | 20 January 2016 | Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) and Response to Request for Additional Information |
ML15069A112 | 17 April 2015 | G20110563 - Licensee Letter Regarding Draft Director'S Decision to Licensee'S with Mark I and II Containment Design |
ML12215A314 | 17 April 2015 | Proposed Director'S Decision - 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs |
ML12215A283 | 17 April 2015 | G20110563 - LTR to Lochbaum -- Draft Director'S Decision Re 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs |
ML15077A574 | 1 April 2015 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 1 of Order EA-13-109,Severe Accident Capable Hardened Vents. |
NRC-15-0041, Resubmittal of Phase 1 Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) | 19 March 2015 | Resubmittal of Phase 1 Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) |
IR 05000341/2014004 | 30 October 2014 | IR 05000341/2014004, 07200071/20140004; on 07/01/2014 - 09/30/2014; Fermi Power Plant, Unit 2; Identification and Resolution of Problems |
NRC-14-0043, DTE Electric Company'S Phase 1 Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-1 | 30 June 2014 | DTE Electric Company'S Phase 1 Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) |
NRC-2014-0037, FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 | 4 March 2014 | FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 |
ML14051A671 | 4 March 2014 | FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 |
IR 05000341/2013008 | 29 October 2013 | IR 05000341-13-008; 07/08/2013 - 09/06/2013; Fermi Power Plant, Unit 2; Component Design Bases Inspection (CDBI) |
NRC-13-0008, DTE Electric Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Containment Hardened Vents (Order Number EA-12-050) | 28 February 2013 | DTE Electric Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Containment Hardened Vents (Order Number EA-12-050) |
NRC-13-0002, Proposed License Amendment to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles | 11 January 2013 | Proposed License Amendment to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles |
ML12341A363 | 20 November 2012 | TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Cover Through Appendix C, Page C-42 |
IR 05000341/2011003 | 1 August 2011 | IR 05000341-11-003 & IR 07200071-10-001; 04/01/2011 - 06/30/2011; Fermi Power Plant, Unit 2; Radiation Safety and Other Activities |
IR 05000341/2011011 | 13 May 2011 | IR 05000341-11-011, on 03/23/2011 - 04/29/2011, Fermi Power Plant, Unit 2, Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event |
NRC-2010-0131, Brief of Nuclear Energy Institute as Amicus Curiae in Opposition to the Emergency Petition to Suspend All Pending Reactor Licensing Decisions and Related Rulemaking Decisions | 2 May 2011 | Brief of Nuclear Energy Institute as Amicus Curiae in Opposition to the Emergency Petition to Suspend All Pending Reactor Licensing Decisions and Related Rulemaking Decisions |
IR 05000341/1998002 | 28 May 1998 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-341/98-02 on 980325.Rept Identified Three Violations,Licensee Did Not Contest Two,But Did Contest Violation Concerning HPCI Sys |
ML20129A351 | 15 March 1996 | Rev 0 to Cchvac Duct & Duct Support Qualification |
NRC-92-0021, Safety Evaluation Summary Rept 1991 | 31 December 1991 | Safety Evaluation Summary Rept 1991 |
ML20237D013 | 16 December 1987 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-341/87-33.Listed Actions Should Be Addressed & Update of Response to Violation 87028 Expected by 871231 |
NRC-87-0171, Responds to NRC Violations Noted in Insp Rept 50-341/87-33. Corrective Actions:Requirements for Utilizing Std Design Methodology in App C to Spec 3071-226 Emphasized | 17 September 1987 | Responds to NRC Violations Noted in Insp Rept 50-341/87-33. Corrective Actions:Requirements for Utilizing Std Design Methodology in App C to Spec 3071-226 Emphasized |
ML20239A662 | 11 September 1987 | Forwards Biweekly Status Rept of Licensee Activities for 870817-28 |
IR 05000341/1985052 | 7 April 1986 | Safety Insp Rept 50-341/85-52 on 851202-860313.Violation Noted:Failure to Adequately Control Design Activities |
ML20134F247 | 31 July 1985 | Safety Evaluation Report Related to the Operation of FERMI-2.Docket No. 50-341.(Detroit Edison Company) |
ML20127M956 | 17 May 1985 | Forwards Responses to Re Questions & Comments on Final Idvp Rept |
ML20098F184 | 27 September 1984 | Discusses Annulus Pressurization Piping Load Reevaluation. Existing Analyses Found to Adequately Represent as-built Configurations.No Loss of Structural Integrity for Postulated Events Exists,Per Original Analysis |
ML20024C123 | 30 June 1983 | Rev 0 to Enrico Fermi Atomic Power Plant,Unit 2:Evaluation of Safety Relief Valve Piping & Torus-Attached Piping for Effects of Site-Specific Earthquake. |
ML20069M065 | 29 April 1983 | Independent Design Verification Program,Final Rept, Vols 1,2 & 3 |
ML20067C617 | 7 December 1982 | Forwards Approved Scope of Independent Design Verification Program,Per 821029 Request.Cygna Energy Svcs Program Plan for Independent Design Verification Will Be Submitted on or Before 821215.Approval of Plan Requested by 821222 |
ML20053C609 | 4 May 1982 | Evaluation of Site-Specific Earthquake Base Mat Uplift Loads. |
ML20052C050 | 30 April 1982 | Plant Unique Analysis Rept,Vol 4,Internal Structures Analysis. |
ML20052C037 | 30 April 1982 | Plant Unique Analysis Rept,Vol 2, Suppression Chamber Analysis. |
ML20052C044 | 30 April 1982 | Plant Unique Analysis Rept,Vol 3,Vent Sys Analysis. |
ML20052C054 | 30 April 1982 | Plant Unique Analysis Rept,Vol 5,Safety Relief Valve Piping Analysis. |
ML20042A489 | 17 November 1981 | Reactor-Auxiliary Bldg Horizontal Response Spectra Site Specific Earthquake w/5% Structural Damping. |
ML20005B818 | 31 August 1981 | Evaluation of Fermi-2 High Density Racks for Site- Specific Earthquake. |
ML20009B513 | 15 July 1981 | Supplementary Seismic Evaluation Rept. |
ML20009C144 | 14 July 1981 | Balance of Plant Equipment Dynamic Qualification Summary, for Water Pump Assemblies,Gauge & Instrument Panels,Rhr Cooling Tower,Valves,York Instrument Rack,Remote Shutdown Panel,Voltage Regulator,Battery Rack & Canister Assembly |
ML20008G184 | 26 June 1981 | Forwards Supplemental Response to NRC Concerns Re High Density Fuel Rack Analysis |
ML20063P824 | 28 January 1974 | Seismic-Stress Analysis Rept RHR Svc Water Pumps |