 Issue dateTitle
ML22325A13917 November 20224 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML19183A02331 July 2019Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109
NRC-18-0054, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)14 December 2018Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
ML16165A45426 May 2016Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
NRC-16-0004, Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) and Response to Request for Additional Information20 January 2016Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) and Response to Request for Additional Information
ML15069A11217 April 2015G20110563 - Licensee Letter Regarding Draft Director'S Decision to Licensee'S with Mark I and II Containment Design
ML12215A31417 April 2015Proposed Director'S Decision - 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs
ML12215A28317 April 2015G20110563 - LTR to Lochbaum -- Draft Director'S Decision Re 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs
ML15077A5741 April 2015Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 1 of Order EA-13-109,Severe Accident Capable Hardened Vents.
NRC-15-0041, Resubmittal of Phase 1 Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)19 March 2015Resubmittal of Phase 1 Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
IR 05000341/201400430 October 2014IR 05000341/2014004, 07200071/20140004; on 07/01/2014 - 09/30/2014; Fermi Power Plant, Unit 2; Identification and Resolution of Problems
NRC-14-0043, DTE Electric Company'S Phase 1 Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-130 June 2014DTE Electric Company'S Phase 1 Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
NRC-2014-0037, FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 20144 March 2014FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014
ML14051A6714 March 2014FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014
IR 05000341/201300829 October 2013IR 05000341-13-008; 07/08/2013 - 09/06/2013; Fermi Power Plant, Unit 2; Component Design Bases Inspection (CDBI)
NRC-13-0008, DTE Electric Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Containment Hardened Vents (Order Number EA-12-050)28 February 2013DTE Electric Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Containment Hardened Vents (Order Number EA-12-050)
NRC-13-0002, Proposed License Amendment to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles11 January 2013Proposed License Amendment to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles
ML12341A36320 November 2012TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Cover Through Appendix C, Page C-42
IR 05000341/20110031 August 2011IR 05000341-11-003 & IR 07200071-10-001; 04/01/2011 - 06/30/2011; Fermi Power Plant, Unit 2; Radiation Safety and Other Activities
IR 05000341/201101113 May 2011IR 05000341-11-011, on 03/23/2011 - 04/29/2011, Fermi Power Plant, Unit 2, Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event
NRC-2010-0131, Brief of Nuclear Energy Institute as Amicus Curiae in Opposition to the Emergency Petition to Suspend All Pending Reactor Licensing Decisions and Related Rulemaking Decisions2 May 2011Brief of Nuclear Energy Institute as Amicus Curiae in Opposition to the Emergency Petition to Suspend All Pending Reactor Licensing Decisions and Related Rulemaking Decisions
IR 05000341/199800228 May 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-341/98-02 on 980325.Rept Identified Three Violations,Licensee Did Not Contest Two,But Did Contest Violation Concerning HPCI Sys
ML20129A35115 March 1996Rev 0 to Cchvac Duct & Duct Support Qualification
NRC-92-0021, Safety Evaluation Summary Rept 199131 December 1991Safety Evaluation Summary Rept 1991
ML20237D01316 December 1987Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-341/87-33.Listed Actions Should Be Addressed & Update of Response to Violation 87028 Expected by 871231
NRC-87-0171, Responds to NRC Violations Noted in Insp Rept 50-341/87-33. Corrective Actions:Requirements for Utilizing Std Design Methodology in App C to Spec 3071-226 Emphasized17 September 1987Responds to NRC Violations Noted in Insp Rept 50-341/87-33. Corrective Actions:Requirements for Utilizing Std Design Methodology in App C to Spec 3071-226 Emphasized
ML20239A66211 September 1987Forwards Biweekly Status Rept of Licensee Activities for 870817-28
IR 05000341/19850527 April 1986Safety Insp Rept 50-341/85-52 on 851202-860313.Violation Noted:Failure to Adequately Control Design Activities
ML20134F24731 July 1985Safety Evaluation Report Related to the Operation of FERMI-2.Docket No. 50-341.(Detroit Edison Company)
ML20127M95617 May 1985Forwards Responses to Re Questions & Comments on Final Idvp Rept
ML20098F18427 September 1984Discusses Annulus Pressurization Piping Load Reevaluation. Existing Analyses Found to Adequately Represent as-built Configurations.No Loss of Structural Integrity for Postulated Events Exists,Per Original Analysis
ML20024C12330 June 1983Rev 0 to Enrico Fermi Atomic Power Plant,Unit 2:Evaluation of Safety Relief Valve Piping & Torus-Attached Piping for Effects of Site-Specific Earthquake.
ML20069M06529 April 1983Independent Design Verification Program,Final Rept, Vols 1,2 & 3
ML20067C6177 December 1982Forwards Approved Scope of Independent Design Verification Program,Per 821029 Request.Cygna Energy Svcs Program Plan for Independent Design Verification Will Be Submitted on or Before 821215.Approval of Plan Requested by 821222
ML20053C6094 May 1982Evaluation of Site-Specific Earthquake Base Mat Uplift Loads.
ML20052C05030 April 1982Plant Unique Analysis Rept,Vol 4,Internal Structures Analysis.
ML20052C03730 April 1982Plant Unique Analysis Rept,Vol 2, Suppression Chamber Analysis.
ML20052C04430 April 1982Plant Unique Analysis Rept,Vol 3,Vent Sys Analysis.
ML20052C05430 April 1982Plant Unique Analysis Rept,Vol 5,Safety Relief Valve Piping Analysis.
ML20042A48917 November 1981Reactor-Auxiliary Bldg Horizontal Response Spectra Site Specific Earthquake w/5% Structural Damping.
ML20005B81831 August 1981Evaluation of Fermi-2 High Density Racks for Site- Specific Earthquake.
ML20009B51315 July 1981Supplementary Seismic Evaluation Rept.
ML20009C14414 July 1981Balance of Plant Equipment Dynamic Qualification Summary, for Water Pump Assemblies,Gauge & Instrument Panels,Rhr Cooling Tower,Valves,York Instrument Rack,Remote Shutdown Panel,Voltage Regulator,Battery Rack & Canister Assembly
ML20008G18426 June 1981Forwards Supplemental Response to NRC Concerns Re High Density Fuel Rack Analysis
ML20063P82428 January 1974Seismic-Stress Analysis Rept RHR Svc Water Pumps