Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000397/2023012 | 20 November 2023 | Commercial Grade Dedication Inspection Report 05000397/2023012 |
IR 05000397/2023005 | 22 August 2023 | Updated Inspection Plan for Columbia Generating Station (Report 05000397/2023005) - Mid Year Letter |
IR 05000397/2022006 | 1 March 2023 | Annual Assessment Letter for Columbia Generating Station (Report 05000397/2022006) |
ML22230C739 | 23 August 2022 | 2022 Mid-Cycle Planning Letter |
ML22041A457 | 10 February 2022 | Notification of NRC Design Bases Assurance Inspection (Team) (05000397/2022010) and Request for Information |
IR 05000397/2021001 | 7 May 2021 | CGS2021001-IR-NH, Columbia Generating Station - Integrated Inspection Report 05000397/2021001 |
ML21111A028 | 21 April 2021 | _ Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2021011) and Request for Information |
IR 05000397/2020004 | 3 February 2021 | Integrated Inspection Report 05000397/2020004 |
GO2-20-086, Response to Request for Additional Information Related to Reduction in Commitment to the Columbia Operational Quality Program Description | 1 June 2020 | Response to Request for Additional Information Related to Reduction in Commitment to the Columbia Operational Quality Program Description |
GO2-20-076, Reduction in Commitment to the Columbia Operation Quality Assurance Program Description | 18 May 2020 | Reduction in Commitment to the Columbia Operation Quality Assurance Program Description |
IR 05000397/2017007 | 6 April 2017 | NRC Problem Identification and Resolution Inspection Report 05000397/2017007 |
ML16061A566 | 1 March 2016 | Notification of Design Bases Inspection (Programs)(Inspection Report 05000397/2016008) and Initial Request for Information |
ML15154A800 | 11 June 2015 | Issuance of Amendment No. 235, Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1, Function 7, Scram Discharge Volume Water Level - High (Exigent Circumstances) |
ML15141A272 | 28 May 2015 | Letter, Public Notice of Application for Amendment, Extension of Implementation Period for Amendment 232 Revision of Technical Specification Table 3.3.1.1-1, Function 7, Scram Discharge Volume Water Level - High |
ML15141A276 | 28 May 2015 | Public Notice of Application for Amendment, Extension of Implementation Period for Amendment 232 Revision of Technical Specification Table 3.3.1.1-1, Function 7, Scram Discharge Volume Water Level - High |
GO2-15-081, Supplement to Exigent License Amendment Request - Extension of Implementation Period for Amendment 232 | 19 May 2015 | Supplement to Exigent License Amendment Request - Extension of Implementation Period for Amendment 232 |
GO2-15-075, Exigent License Amendment Request - Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1 Function 7 Scram Discharge Volume Water Level-High. | 15 May 2015 | Exigent License Amendment Request - Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1 Function 7 Scram Discharge Volume Water Level-High. |
ML14219A751 | 7 August 2014 | Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000397-14-005) and Request for Information |
IR 05000397/2014003 | 6 August 2014 | IR 05000397-14-003; 03/24/2014 - 06/23/2014; Columbia Generating Station; Equipment Alignment, License Operator Requalification Program and Licensed Operator Performance, Occupational ALARA Planning and Controls, Problem Identification & Re |
ML14035A313 | 16 January 2014 | 2013 Annual Financial Report. Part 1 of 2 |
ML13015A272 | 31 December 2012 | NEDO-33685, Rev 2, Digital I&C-ISG-06 Compliance for Columbia Generating Station Numac Power Range Neutron Monitoring Retrofit Plus Option III Stability Trip Function. |
ML12040A074 | 31 January 2012 | NEDO-33685, Revision 1, Digital I&C-ISG-06 Compliance for Columbia Generating Station Numac Power Range Neutron Monitoring Retrofit Plus Option III Stability Trip Function |
ML12040A079 | 31 January 2012 | NEDO-33698, Revision 1, Columbia Generating Station Power Range Neutron Monitoring System Design Report on Computer Integrity, Test and Calibration, and Fault Detection. Enclosure 2, Attachment 14 to List of Commitments and Enclosure 3 Are |
ML111290705 | 6 May 2011 | Notification of Inspection (IR 05000397-11-004) and Request for Information |
ML031200116 | 21 April 2003 | 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR 21-0086, Rev. 0 |
ML17284A812 | 11 November 1998 | Forwards Response to RAI Re GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. |
ML17292A695 | 7 February 1997 | Forwards Response to NRC Requirement to Provide Info Re Adequacy & Availability of Design Bases Info for Plant |
ML17290A390 | 21 May 1993 | Comments on Proposed Insp Procedure 38703, Commercial Grade Procurement Insp. |
ML17286A414 | 30 October 1990 | Forwards Status Rept on commerical-grade Dedication Process, Per Commitment in Response to Insp Rept 50-397/89-21 |
ML17285B222 | 16 April 1990 | Forwards Status Rept for Commitments Made in 891130 Ltr Re commercial-grade Dedication Process.Resolution of 10 Samples Identified by NRC & 50 Samples Identified by Cynga Completed |
ML17285B027 | 16 February 1990 | Responds to Notice of Violation & Proposed Imposition of Civil Penalty Re Insp Repts 50-397/89-21,50-397/89-22 & 50-397/89-28.Violations Denied for Specified Reasons |
ML17285A885 | 30 November 1989 | Forwards Rev 0 to 89162-TR001, Commercial Grade Dedication Project, in Response to NRC Request for Addl Info Re Spare Parts Commercial Dedication Program Resulting from 891120 Mgt Meeting on Insp Rept 50-397/89-21 |
ML17285A847 | 13 November 1989 | Responds to NRC 891011 Ltr Re Violations Noted in Insp Rept 50-397/89-28.Corrective Actions:Current Commercial Grade Procurement Practices Upgraded to Meet NCIG-07 Stds Ahead of 900101 Target Schedule |
ML17285A887 | 14 August 1989 | Rev 0 to Commercial Grade Dedication Project for Wppss Contract C-30298. |
ML17285A634 | 20 July 1989 | Provides Addl Info Re Acceptability of Five Installed Items for Use in safety-related Applications,Per Insp Rept 50-397/89-21.Items Include,Potter & Brumfield Relays,Anchor Darling Valve Parts & 600 Volt or Less Fuses |
ML17285A478 | 12 May 1989 | Forwards Update of Status Sheets Used to Track Items/Issues Identified During Mar & Apr 1989 NRC Ssomi at Plant.Items Include 125-volt Dc Battery Life Calculations & Change from Automatic to Manual Intake Valve Operation in Control Room |
Information Notice 1989-45, Metalclad, Low-Voltage Power Circuit Breakers Refurbished with Substandard Parts | 8 May 1989 | Metalclad, Low-Voltage Power Circuit Breakers Refurbished with Substandard Parts |