Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000390/2024005 | 28 August 2024 | Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 | |
IR 05000390/2024402 | 20 August 2024 | – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public | Affidavit |
CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),” | 19 August 2024 | Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),” | |
ML24228A231 | 15 August 2024 | TVA Meeting Slides for August 19 Public Meeting Re QAPD Supplement | |
ML24225A254 | 14 August 2024 | August 14, 2024 - TVA Pre-Sub Meeting Presentation - Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - License Amendment Request to Revise TS 3.5.2 ECCS - Operating | |
PMNS20240978, Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant and Watts Bar Nuclear Plant License Amendment Request to Revise Technical Specs 3.5.2, Note 1 Related to the Residual Heat Removal System | 13 August 2024 | Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant and Watts Bar Nuclear Plant License Amendment Request to Revise Technical Specs 3.5.2, Note 1 Related to the Residual Heat Removal System | |
ML24219A026 | 12 August 2024 | Request for Withholding Information from Public Disclosure | Affidavit |
ML24249A191 | 8 August 2024 | News Release-II-24-022: NRC Names New Senior Resident Inspector at Watts Bar Nuclear Plant | New Senior Resident Inspector |
IR 05000390/2024002 | 7 August 2024 | Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev | Enforcement Discretion Functionality Assessment FLEX Significance Determination Process Operability Determination Fire Protection Program |
PMNS20241000, Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program | 6 August 2024 | Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program | |
WBL-24-034, NRC Regulatory Issue Summary (RIS) 2024-01 - Preparation and Scheduling of Operator Licensing Examinations | 25 July 2024 | NRC Regulatory Issue Summary (RIS) 2024-01 - Preparation and Scheduling of Operator Licensing Examinations | |
ML24204A265 | 25 July 2024 | Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate | |
ML24215A315 | 24 July 2024 | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-276-A, Revision 2 TS 3.8.1, AC Sources | |
ML24199A001 | 22 July 2024 | Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) | |
WBL-24-030, Emergency Plan Implementing Procedure Revisions | 17 July 2024 | Emergency Plan Implementing Procedure Revisions | |
ML24172A138 | 16 July 2024 | Exemption from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - FRN | Exemption Request Power Uprate |
ML24172A140 | 16 July 2024 | Exemption from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - FRN | Exemption Request |
ML24170A800 | 15 July 2024 | Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts | Cyber Security Safeguards Contingency Plan Fire Protection Program |
ML24172A134 | 15 July 2024 | Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter | |
ML24172A135 | 15 July 2024 | Exemption | Exemption Request Power Uprate |
ML24172A137 | 15 July 2024 | Exemption | Exemption Request |
IR 05000390/2024440 | 12 July 2024 | 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter | Affidavit |
ML24184B916 | 10 July 2024 | U.S. NRC Meeting Slides for Meeting with Tennessee Valley Authority Regarding NRC Questions Regarding Scope of Nuclear Quality Assurance Program | |
WBL-24-028, Emergency Plan Implementing Procedure Revisions | 2 July 2024 | Emergency Plan Implementing Procedure Revisions | |
ML24131A001 | 2 July 2024 | Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 | Time of Discovery High winds Fire Barrier Internal Flooding Probabilistic Risk Assessment Cyber Security Large early release frequency Safeguards Contingency Plan Turbine Missile Fire Protection Program |
ML24173A212 | 27 June 2024 | Summary of Public Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request Regarding Adoption of TSTF-276-A, Revision 2 to Clarify Requirements for Diesel Generator Testing | |
CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) | 27 June 2024 | Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) | Affidavit |
CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS | 25 June 2024 | License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS | Safe Shutdown Surveillance Frequency Control Program Offsite Circuit Overspeed trip Overspeed |
PMNS20240831, Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program | 24 June 2024 | Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program | |
ML24089A114 | 21 June 2024 | Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) | Exemption Request |
ML24089A115 | 21 June 2024 | Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) | Exemption Request |
ML24177A141 | 11 June 2024 | NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 | Anticipated operational occurrence |
ML24158A300 | 11 June 2024 | Summary of May 6, 2024, Public Meeting with Tennessee Valley Authority to Discuss the Potential for a License Amendment Request Regarding the Control Room Envelope and Selective Use of an Alternative Source Term | Potassium iodide |
ML24157A315 | 3 June 2024 | 2024 Sequoyah Commercial Grade Dedication Inspection Information Request | Commercial Grade Dedication Commercial Grade |
ML24155A137 | 29 May 2024 | Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate | |
WBL-24-025, Emergency Plan Implementing Procedure Revisions. Includes EPIP-7, Revision 43, Activation and Operation of the Operations Support Center (OSC) | 23 May 2024 | Emergency Plan Implementing Procedure Revisions. Includes EPIP-7, Revision 43, Activation and Operation of the Operations Support Center (OSC) | |
ML24156A006 | 22 May 2024 | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Recapture Low-Power Testing Time | |
ML24141A048 | 17 May 2024 | EN 56958_1 Ametek Solidstate Controls, Inc | Commercial Grade Dedication |
ML24100A764 | 16 May 2024 | Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) | Anticipated operational occurrence |
WBL-24-022, Cycle 5 Steam Generator Tube Inspection Report | 16 May 2024 | Cycle 5 Steam Generator Tube Inspection Report | Non-Destructive Examination Nondestructive Examination Eddy Current Testing |
ML24130A001 | 16 May 2024 | April 2024, Issuance of Multiple Exemptions Regarding Security Notifications, Reports, and Recording Keeping | Exemption Request |
ML24137A287 | 16 May 2024 | Pre-Submittal Meetingfor Proposed License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources - Operating to Clarify Requirements for Diesel Generator Testing | |
WBL-24-023, 2023 Annual Radiological Environmental Operating Report | 15 May 2024 | 2023 Annual Radiological Environmental Operating Report | Annual Radiological Environmental Operating Report |
IR 05000390/2024001 | 14 May 2024 | Integrated Inspection Report 05000390/2024001 and 05000391/2024001 | Safe Shutdown Internal Flooding Enforcement Discretion Fire impairment Functionality Assessment Condition Adverse to Quality Significance Determination Process Large early release frequency Operability Determination Fire Protection Program Hourly Fire Watch Scaffolding Operability Assessment Overspeed Potassium iodide |
PMNS20240663, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specifications | 9 May 2024 | Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specifications | |
CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | 8 May 2024 | Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | |
WBL-24-020, Unit 2 - Annual Non-Radiological Environmental Operating Report - 2023 | 7 May 2024 | Unit 2 - Annual Non-Radiological Environmental Operating Report - 2023 | |
ML24130A013 | 7 May 2024 | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.11 for MCR Chiller Completion Time | |
ML24127A041 | 6 May 2024 | May 6, 2024 Meeting Slides | |
ML24114A310 | 3 May 2024 | Monthly (28-Day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 14, 2024 | Pressure and Temperature Limits Report Tritium Producing Burnable Absorber Rods Exemption Request |