Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20108A534 | 12 November 1984 | Duke Energy | Proposed Tech Spec Deleting Surveillance Requirement Re Cold Leg Accumulator Isolation Valve Automatic Actuation | Other |
ML20108A521 | 12 November 1984 | Duke Energy Tucker H | Application for Amends to Licenses NPF-9 & NPF-17,deleting Tech Spec Surveillance Requirement 4.5.1.1.1.d for Cold Leg Accumulator Isolation Valve Automatic Actuation.Automatic Actuation Feature Obsolete.Fee Paid | Request |
ML20101S028 | 30 January 1985 | Duke Energy | Proposed Tech Specs Clarifying Action Statements for Cold Leg Injection Accumulators & Upper Head Injection (Uhi) Sys & Uhi Surveillance Requirements | Other |
ML20101S009 | 30 January 1985 | Duke Energy Tucker H | Application for Amends to Licenses NPF-9 & NPF-17,changing Tech Specs to Clarify Action Statements for Cold Leg Injection Accumulators & Upper Head Injection (Uhi) Sys & Uhi Sys Surveillance Requirements.Fee Paid | Request |
ML20112J631 | 1 April 1985 | Duke Energy | Proposed Changes to Tech Spec 3.7.10.1,treating Fire Suppression Pump C as Primary Pump & Disallowing Extended Inoperability | Request |
ML20112J621 | 1 April 1985 | Duke Energy Tucker H | Application for Amends to Licenses NPF-9 & NPF-17,changing Tech Spec 3.7.10.1 to Treat Fire Suppression Pump C as Primary Pump & Disallow Extended Inoperability.Fee Paid | Request |
ML20132C399 | 23 September 1985 | Duke Energy Gill R | Responds to NRC 850910 Questions Re Fire Suppression Pump C. Repowering Existing Pump from Class 1E Diesel Would Cause Power to Be Unavailable During Loca.Total Blackout of Plant Switchyard Allowed W/O Effect on 44 Kv Feeder to Pump | Other |
ML20138C858 | 14 October 1985 | Duke Energy Tucker H | Provides Info Re Fire Suppression Pumps.Any Pump Can Be Loaded on Diesel 1E.Pump a Powered from 6,900-volt Switchgear 2TB,Pump B Loaded from 6,900 Switchgear 1TD & Pump C Powered from 44-kV Substation.Diagrams Encl | Other |