Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20096C663 | 27 August 1984 | FirstEnergy | Application for Amend to License NPF-3,revising Tech Specs to Reflect Changes in Reactor Vessel Matls Irradiation Surveillance Schedule & Flow Verification of Auxiliary Feedwater Sys.Fee Paid | Request |
ML20096C640 | 27 August 1984 | FirstEnergy Crouse R | Forwards Application to Amend License NPF-3,revising Tech Specs to Reflect Changes in Reactor Vessel Matls Irradiation Surveillance Schedule & Flow Verification of Auxiliary Feedwater Sys | Request |
ML20096C682 | 27 August 1984 | FirstEnergy | Proposed Tech Specs Reflecting Changes in Reactor Vessel Matls Irradiation Surveillance Schedule & Flow Verification of Auxiliary Feedwater Sys | Other |
B12414, Application for Amend to License NPF-49,extending 18-month Surveillance Testing Requirements for Diesel Generator Up to 4 Months Beyond Max Allowed by Tech Spec Section 4.0.2,on one-time Basis | 30 January 1987 | NORTHEAST UTILITIES Mroczka E Northeast Nuclear Energy | Application for Amend to License NPF-49,extending 18-month Surveillance Testing Requirements for Diesel Generator Up to 4 Months Beyond Max Allowed by Tech Spec Section 4.0.2,on one-time Basis | Request |
ML20209H917 | 31 January 1987 | Northeast Nuclear Energy | Proposed Tech Specs,Extending Diesel Generator 18-month Surveillance Requirements Up to 4 Months Beyond Max Allowed by Tech Spec Section 4.0.2 on one-time Basis | Other |
B12448, Submits Addl Info Re 870130 Application for Amend to License NPF-49,revising Tech Specs to Extend Diesel Generator 18-month Surveillance Testing Requirements,Per 870224 Telcon | 6 March 1987 | NORTHEAST UTILITIES Mroczka E Sears C Northeast Nuclear Energy | Submits Addl Info Re 870130 Application for Amend to License NPF-49,revising Tech Specs to Extend Diesel Generator 18-month Surveillance Testing Requirements,Per 870224 Telcon | Request |
ML20215K380 | 4 May 1987 | FirstEnergy Shelton D | Requests Reissuance of Table 3.6-2, Containment Isolation Valves of Tech Spec 3/4.6.3,correcting Typos in 840911 Application to Amend License NPF-3 | Request |
ML20215L814 | 4 May 1987 | FirstEnergy Shelton D | Forwards Application for Amend to License NPF-3,deleting Portion of Tech Spec Surveillance Requirement 4.7.1.2d to Reflect Mods to Steam Line Piping to Auxiliary Feed Pump Turbine Following 850609 Loss of Feedwater Event.Fee Paid | Request |
ML20215L835 | 4 May 1987 | FirstEnergy Shelton D | Application for Amend to License NPF-3,deleting Portion of Tech Spec Surveillance Requirement 4.7.1.2d Re Auxiliary Feedwater Sys as Result of 850609 Loss of Feedwater Event. Supporting Documentation Encl | Request |
ML20215L839 | 4 May 1987 | FirstEnergy | Proposed Tech Specs Re Auxiliary Feedwater Sys Surveillance Requirement 4.7.1.2d | Other |
ML20214K724 | 20 May 1987 | FirstEnergy Shelton D | Forwards Application for Amend to License NPF-3,revising Tech Specs Re Fire Protection to Assist in Transfer of Fire Protection Program to Updated Sar,Per Generic Ltr 86-10.Fee Paid | Request |
ML20214K755 | 20 May 1987 | FirstEnergy Shelton D | Application for Amend to License NPF-3,revising Tech Specs Re Fire Protection to Implement Guidance of Generic Ltr 86-10 & to Transfer Fire Protection Program to Updated SAR | Request |
ML20214K772 | 20 May 1987 | FirstEnergy | Proposed Changes to Tech Specs Re Fire Protection to Assist in Transfer of Fire Protection Program to Updated Sar,Per Generic Ltr 86-10.Safety Evaluation & Significant Hazards Consideration Encl | Request |
ML20216H604 | 25 June 1987 | FirstEnergy Shelton D | Advises That Based on B&W Analytical Studies for Primary Sys Blowdown Using RELAP5,use of Blowdown Valves Not Practicable for Feed & Bleed,Per 851204 Commitment.Listed Proposed Mods Will Be Implemented to Enhance Makeup Sys | Other |
ML20235W129 | 9 October 1987 | FirstEnergy | Proposed Tech Specs,Allowing one-time Extension of 18 Month Emergency Diesel Generator Surveillance Interval | Other |
ML20235W127 | 9 October 1987 | FirstEnergy Shelton D | Application for Amend to License NPF-3,revising Tech Specs to Allow one-time Extension of 18 Month Surveillance Interval for Insp & Operability Testing of Emergency Diesel Generators | Request |
ML20235W112 | 9 October 1987 | FirstEnergy Shelton D | Forwards Application for Amend to License NPF-3.Amend Revises Tech Specs to Allow one-time Extension in 18 Month Surveillance Interval for Insp & Operability Testing of Emergency Diesel Generators.Fee Paid | Request |
ML20236H021 | 27 October 1987 | FirstEnergy | Proposed Tech Specs,Changing Section 3/4.3.2, Safety Sys Instrumentation, Table 3.3-5 & Section 3/4.6.3, Containment Isolation Valves, Table 3.6-2 to Support Enhanced Feed & Bleed Mods | Other |
ML20236G980 | 27 October 1987 | FirstEnergy Shelton D | Application for Amend to License NPF-3,revising Tech Spec Section 3/4.3.2, Safety Sys Instrumentation, Table 3.3-5 & Section 3/4.6.3, Containment Isolation Valves, Table 3.6-2 to Support Enhanced Feed & Bleed Mods.Fee Paid | Request |
ML20236N167 | 7 November 1987 | Office of Nuclear Reactor Regulation De Agazio A | Discusses 871029 & 30 Fire Protection Meetings in Bethesda, MD Re Issues Which Have Arisen in Conjunction W/Licensee App R Reappraisal Effort,Including Status of Fire Protection on Plant Mods.List of Attendees Encl | Meeting |
ML20236X859 | 7 December 1987 | FirstEnergy | Proposed Tech Specs Re Fire Protection | Other |
ML20236X833 | 7 December 1987 | FirstEnergy Shelton D | Application for Amend to License NPF-3,revising Tech Specs Re Fire Protection | Request |
ML20236X822 | 7 December 1987 | FirstEnergy Shelton D | Forwards Application for Amend to License NPF-3,revising Tech Specs Re Fire Protection Per Generic Ltr 86-10 | Request |
ML20237A688 | 8 December 1987 | FirstEnergy Shelton D | Informs of Changes Necessary to Support Fifth Refueling Outage in Feb 1988.Key Amend Requests Placed Into 1 of 3 Listed Categories.Nrc Should Allocate Necessary Resources to Provide Timely Support for Review & Issuance of Amends | Other |
ML20236Y342 | 8 December 1987 | FirstEnergy Shelton D | Forwards Application for Amend to License NPF-3,revising Tech Spec 4.6.1.2c.3,Section 3/4.6.1.2 Re Containment Sys & Containment Leakage.Fee Paid | Request |
ML20149J903 | 10 February 1988 | Office of Nuclear Reactor Regulation De Agazio A | Forwards Environ Assessment & Finding of No Significant Impact Re Util 871207 Application for Amend to License NPF-3 to Update Tech Specs to Reflect Current Plant Design, Testing & Compensatory Measures Re Fire Protection Features | Other |
ML20149J964 | 10 February 1988 | Office of Nuclear Reactor Regulation Colburn T | Environ Assessment & Finding of No Significant Impact Based on Util 871207 Application for Amend to License NPF-3, Updating Tech Specs to Reflect Current Plant Design,Testing & Compensatory Measures Re Fire Protection Features | Other |
ML20150B032 | 7 March 1988 | FirstEnergy Shelton D | Forwards Application for Amend to License NPF-3 Changing Tech Spec Section 4.6.1.2.a to Allow Third Type a Test & 10-yr Inservice Insps to Be Uncoupled & Performed in Separate Refueling Outages.Fee Paid | Request |
ML20151X241 | 29 April 1988 | FirstEnergy Shelton D | Forwards Discussion of & Proposed Revs to Tech Specs for Resolution of NRC Comments Concerning Deletion of Auxiliary Feedwater Pump Turbine Inlet Steam Pressure Interlock Operability Requirements,Per 880406 Telcon | Other |
ML20154N908 | 23 September 1988 | Office of Nuclear Reactor Regulation De Agazio A | Summary of 880721 Meeting/Util in Rockville,Md Re Licensee App R Reappraisal Efforts.List of Meeting Attendees & Viewgraphs Encl | Meeting |