Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22362A11028 December 2022Energy Harbor Nuclear Corp. Submittals - Project Manager Reassignment
L-22-271, Emergency Plan20 December 2022Emergency PlanSafe Shutdown
Unanalyzed Condition
Time of Discovery
High winds
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Severe Accident Management Guideline
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Power change
IR 05000440/202240520 December 2022Security Baseline Inspection Report 05000440/2022405 (Cover Letter Only)Affidavit
L-22-272, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023)16 December 2022Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023)Hydrostatic
Exemption Request
Earthquake
L-22-263, Spent Fuel Storage Cask Registration12 December 2022Spent Fuel Storage Cask Registration
ML22333A7906 December 2022Operator Licensing Examination Approval - Perry Nuclear Power Plant December 2022
ML22336A1225 December 2022Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000440/2023010Stroke time
Temporary Modification
Aging Management
Large early release frequency
COVID-19
ML23038A1581 December 20222.3-4 Written Examination Quality Checklist
ML23038A1571 December 20222.3-2 Operating Test Quality Checklist
ML23038A1431 December 20222.3-1 Examination Outline Quality Checklist
ML22341A03230 November 202210 CFR Part 21 Notification from Curtiss-Wright Nuclear Division for Qualtech Np Supplied Eaton TRM5 Timing Relays
L-22-254, Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 2218 November 2022Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22Safe Shutdown
Unanalyzed Condition
Time of Discovery
High winds
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Severe Accident Management Guideline
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Power change
L-22-250, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 198 November 2022Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 19
IR 05000440/20220038 November 2022Integrated Inspection Report 05000440/2022003Temporary Modification
Functionality Assessment
Operability Determination
Fire Protection Program
Power change
Unidentified leakage
L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position18 October 2022Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated PositionReactor Vessel Water Level
Water Inventory Control
Surveillance Frequency Control Program
IR 05000440/202250117 October 2022Emergency Preparedness Biennial Exercise Inspection Report 05000440/2022501