Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
PLA-6710, Radioactive Effluent Release Report, 201031 December 2010Radioactive Effluent Release Report, 2010Grab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Process Control Program
IR 05000387/201000816 December 2010Final Significance Determination of White Finding, with Assessment Follow-up - Susquehanna Steam Electric Station (NRC Inspection Report No. 05000387/2010008 and 05000388/2010008), Dated December 16, 2010Internal Flooding
Significance Determination Process
Preliminary White Finding
ML10350028416 December 2010Chapter 10, UFSAR, Rev. 64Safe Shutdown
Loop seal
Stroke time
Safe Shutdown Earthquake
Hydrostatic
Abnormal operational transient
Earthquake
Turbine Missile
ML10347038413 December 2010RN-10-052, PPL Susquehanna, LLC - Susquehanna Steam Electric Station - Issuance of Final Significance DeterminationInternal Flooding
Significance Determination Process
ML11040022712 December 2010Operator Licensing Exam Summary of References Handouts to Applicants (Folder 3)
ML11040025212 December 2010Final Outlines (Folder 3)
ML11040026712 December 2010Final Written Examination with Answer KeyHalf scram
Squib
Scram Discharge Volume
Offsite Circuit
Power change
ML11040027512 December 2010Final Operating Exam (Sections a, B, and C) (Folder 3)Post Accident Monitoring
Job Performance Measure
Scram Discharge Volume
Overtravel
Fuel cladding
Power change
Operability Assessment
PLA-6677, Submittal of Registration for the Use of Dry Fuel Storage Module D-4, PLA-667710 December 2010Submittal of Registration for the Use of Dry Fuel Storage Module D-4, PLA-6677
PLA-6674, Registration for the Use of Dry Fuel Storage Module D-323 November 2010Registration for the Use of Dry Fuel Storage Module D-3
PLA-6672, Request Registration for Use of Dry Fuel Storage Module D-323 November 2010Request Registration for Use of Dry Fuel Storage Module D-3
IR 05000387/201000719 November 2010IR 05000387-10-007 and 05000388-10-007, on 09/13/2010 - 10/08/2010, Susquehanna Steam Electric Station, Units 1 and 2; Component Design Bases InspectionProbabilistic Risk Assessment
Significance Determination Process
Operability Determination
Battery sizing
Weak link
Operability Assessment
Power Uprate
PLA-6671, Registration for the Use of Dry Fuel Storage Module D-216 November 2010Registration for the Use of Dry Fuel Storage Module D-2
IR 05000387/201050216 November 2010IR 05000387-10-502 & 05000388-10-502, on 10/04/2010-10/08/2010, Susquehanna Steam Electric Station, Units 1 and 2, Exercise Evaluation; Emergency Action Level and Emergency Plan Changes; Emergency Preparedness Performance Indicators
IR 05000387/201000412 November 2010IR 05000387-10-004, 05000388-10-004, on 07/01/2010 - 09/30/2010, Susquehanna Steam Electric Station - NRC Integrated Inspection Report and Preliminary White Finding (EA-10-207) Dated 11/12/2010Safe Shutdown
Reactor Vessel Water Level
High Radiation Area
Fire Barrier
Internal Flooding
Condition Adverse to Quality
Significance Determination Process
Large early release frequency
Operability Determination
Fuel cladding
Preliminary White Finding
Fire Protection Program
Substantial potential for overexposure
Operability Assessment
Power Uprate
Overexposure
PLA-6642, Proposed Amendment Nos. 307 & 278, Change to Technical Specification Surveillance Requirement (SR) 3.4.3.1 to Revise the Lower Surveillance Tolerances10 November 2010Proposed Amendment Nos. 307 & 278, Change to Technical Specification Surveillance Requirement (SR) 3.4.3.1 to Revise the Lower Surveillance TolerancesAnticipated operational occurrence
Past operability
Abnormal operational transient
PLA-6666, Registration for the Use of Dry Fuel Storage Module D-13 November 2010Registration for the Use of Dry Fuel Storage Module D-1
ML1102004721 November 2010NRC Comments on Draft Licensee-Developed Exam (Written & Operating Tests) (Folder 2)Half scram
ML11020050026 October 2010Draft - Outlines (Facility Letter Dated 10/26/10) (Folder 2)
ML11020054726 October 2010Draft - Written Operator Licensing Exam (Folder 2)Safe Shutdown
Half scram
Squib
Earthquake
Offsite Circuit
Power change
ML11020055826 October 2010Draft - Operating Exam (Sections a, B and C) (Folder 2)
TAC:U0179326 October 2010
PLA-6652, Response to NRC Request for Additional Information on Proposed Revision 1 to Relief Request RR-0215 October 2010Response to NRC Request for Additional Information on Proposed Revision 1 to Relief Request RR-02Grace period
PLA-6657, 10 CFR 50.59 Summary Report and Changes to Regulatory Commitments7 October 201010 CFR 50.59 Summary Report and Changes to Regulatory CommitmentsReactor Vessel Water Level
Power Uprate