Issue date | Title | Topic | |
---|---|---|---|
PLA-6710, Radioactive Effluent Release Report, 2010 | 31 December 2010 | Radioactive Effluent Release Report, 2010 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program |
IR 05000387/2010008 | 16 December 2010 | Final Significance Determination of White Finding, with Assessment Follow-up - Susquehanna Steam Electric Station (NRC Inspection Report No. 05000387/2010008 and 05000388/2010008), Dated December 16, 2010 | Internal Flooding Significance Determination Process Preliminary White Finding |
ML103500284 | 16 December 2010 | Chapter 10, UFSAR, Rev. 64 | Safe Shutdown Loop seal Stroke time Safe Shutdown Earthquake Hydrostatic Abnormal operational transient Earthquake Turbine Missile |
ML103470384 | 13 December 2010 | RN-10-052, PPL Susquehanna, LLC - Susquehanna Steam Electric Station - Issuance of Final Significance Determination | Internal Flooding Significance Determination Process |
ML110400227 | 12 December 2010 | Operator Licensing Exam Summary of References Handouts to Applicants (Folder 3) | |
ML110400252 | 12 December 2010 | Final Outlines (Folder 3) | |
ML110400267 | 12 December 2010 | Final Written Examination with Answer Key | Half scram Squib Scram Discharge Volume Offsite Circuit Power change |
ML110400275 | 12 December 2010 | Final Operating Exam (Sections a, B, and C) (Folder 3) | Post Accident Monitoring Job Performance Measure Scram Discharge Volume Overtravel Fuel cladding Power change Operability Assessment |
PLA-6677, Submittal of Registration for the Use of Dry Fuel Storage Module D-4, PLA-6677 | 10 December 2010 | Submittal of Registration for the Use of Dry Fuel Storage Module D-4, PLA-6677 | |
PLA-6674, Registration for the Use of Dry Fuel Storage Module D-3 | 23 November 2010 | Registration for the Use of Dry Fuel Storage Module D-3 | |
PLA-6672, Request Registration for Use of Dry Fuel Storage Module D-3 | 23 November 2010 | Request Registration for Use of Dry Fuel Storage Module D-3 | |
IR 05000387/2010007 | 19 November 2010 | IR 05000387-10-007 and 05000388-10-007, on 09/13/2010 - 10/08/2010, Susquehanna Steam Electric Station, Units 1 and 2; Component Design Bases Inspection | Probabilistic Risk Assessment Significance Determination Process Operability Determination Battery sizing Weak link Operability Assessment Power Uprate |
PLA-6671, Registration for the Use of Dry Fuel Storage Module D-2 | 16 November 2010 | Registration for the Use of Dry Fuel Storage Module D-2 | |
IR 05000387/2010502 | 16 November 2010 | IR 05000387-10-502 & 05000388-10-502, on 10/04/2010-10/08/2010, Susquehanna Steam Electric Station, Units 1 and 2, Exercise Evaluation; Emergency Action Level and Emergency Plan Changes; Emergency Preparedness Performance Indicators | |
IR 05000387/2010004 | 12 November 2010 | IR 05000387-10-004, 05000388-10-004, on 07/01/2010 - 09/30/2010, Susquehanna Steam Electric Station - NRC Integrated Inspection Report and Preliminary White Finding (EA-10-207) Dated 11/12/2010 | Safe Shutdown Reactor Vessel Water Level High Radiation Area Fire Barrier Internal Flooding Condition Adverse to Quality Significance Determination Process Large early release frequency Operability Determination Fuel cladding Preliminary White Finding Fire Protection Program Substantial potential for overexposure Operability Assessment Power Uprate Overexposure |
PLA-6642, Proposed Amendment Nos. 307 & 278, Change to Technical Specification Surveillance Requirement (SR) 3.4.3.1 to Revise the Lower Surveillance Tolerances | 10 November 2010 | Proposed Amendment Nos. 307 & 278, Change to Technical Specification Surveillance Requirement (SR) 3.4.3.1 to Revise the Lower Surveillance Tolerances | Anticipated operational occurrence Past operability Abnormal operational transient |
PLA-6666, Registration for the Use of Dry Fuel Storage Module D-1 | 3 November 2010 | Registration for the Use of Dry Fuel Storage Module D-1 | |
ML110200472 | 1 November 2010 | NRC Comments on Draft Licensee-Developed Exam (Written & Operating Tests) (Folder 2) | Half scram |
ML110200500 | 26 October 2010 | Draft - Outlines (Facility Letter Dated 10/26/10) (Folder 2) | |
ML110200547 | 26 October 2010 | Draft - Written Operator Licensing Exam (Folder 2) | Safe Shutdown Half scram Squib Earthquake Offsite Circuit Power change |
ML110200558 | 26 October 2010 | Draft - Operating Exam (Sections a, B and C) (Folder 2) | |
TAC:U01793 | 26 October 2010 | ||
PLA-6652, Response to NRC Request for Additional Information on Proposed Revision 1 to Relief Request RR-02 | 15 October 2010 | Response to NRC Request for Additional Information on Proposed Revision 1 to Relief Request RR-02 | Grace period |
PLA-6657, 10 CFR 50.59 Summary Report and Changes to Regulatory Commitments | 7 October 2010 | 10 CFR 50.59 Summary Report and Changes to Regulatory Commitments | Reactor Vessel Water Level Power Uprate |