IR 05000244/201000922 December 2010IR 05000244-10-009, on 10/18/2010 - 11/11/2010, R. E. Ginna Nuclear Power Plant, LLC (Ginna), Component Design Bases InspectionSafe Shutdown
Mission time
Internal Flooding
Significance Determination Process
Reasonable doubt of operability
ML10350038416 December 2010Acceptance Review for Ginna TAC ME5120: ISI-04
ML10362010516 December 2010CFR 50.55a Request ISI-02 and ISI-03: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR50.55a(g)(5)(iii) for the Fourth Interval Inservice Inspection (ISI) ProgramVT-2
Dissimilar Metal Weld
TAC:ME524816 December 2010
ML11101042113 December 2010Written Retake - NRC Comments on Draft Licensee-Developed Exam (Written Tests)(Folder 2)
ML1110104276 December 2010Written Retake - Draft - Outlines (Facility Letter Dated 12/6/10) (Folder 2)Boric Acid
Loop seal
Hydrostatic
Power change
TAC:U018386 December 2010
ML10335021724 November 2010CFR 50.55a Request ISI-04: Request for Use of Alternate Depth Sizing QualificationDissimilar Metal Weld
DM weld
ML10327013823 November 2010Senior Reactor Operator and Reactor Operator Written Retake Examinations - R.E. Ginna Nuclear Power Plant, LLC
IR 05000244/201001018 November 2010NRC Investigation Report 1-2009-050 and NRC Inspection Report 05000244-10-010Fitness for Duty
ML10322045615 November 2010Notification of General License 30-day Cask Registration
ML10321020615 November 2010Day Cask Registration Notification
IR 05000244/20100043 November 2010IR 05000244-10-004, on 07/01/2010 - 09/30/2010, R.E. Ginna Nuclear Power Plant, LLC (Ginna), Maintenance Risk Assessments and Emergent Work Control, Post Maintenance TestingHigh Radiation Area
Fire Barrier
Enforcement Discretion
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Operability Determination
Incremental Core Damage Probability Deficit
ML10300006827 October 2010Notice of Meeting: R.E. Ginna Regulatory Conference with NRC to Discuss Potential Greater-than-Green Security-Related Self-Revealing Finding(S) Identified on April 27, 2010
ML10305014826 October 2010R. E. Ginna - Response to Commitments Re Generic Letter 2004-02, Specific to Debris Transport Analysis and Strainer Head-loss Testing
ML10309026125 October 2010Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 & 2 and R.E. Ginna - Submittal of Securities and Exchange Commission Schedules
ML10342054918 October 2010Ouality Assurance Topical Report, Revision 5Fitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Coatings
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Process Control Program
Fire Protection Program
Grace period
IR 05000244/201000815 October 2010IR 05000244-10-008, 07200067-10-002 on 07/19 - 09/03/10, R.E. Ginna Nuclear Power Plant, Constellation Energy, Ontario, NyNondestructive Examination
Liquid penetrant
ML10295019215 October 2010General License 30-day Cask Registration Notification
ML10288050415 October 2010IR 05000244-10-008, IR 07200067-10-002, on 07/19/2010 - 09/03/2010, R.E. Ginna Nuclear Power Plant, Constellation Energy, Ontario, Ny (Transmittal Ltr)
ML1028503947 October 2010S. Wastler Memo Technical Assistance Request - Review of Proposed Amendment to the R. E. Ginna Nuclear Power Plant Physical Security Plan (TAC L24479)
TAC:L244797 October 2010
ML1023602536 October 2010R. E. Ginna Nuclear Power Plant-Amendment Proposed Changes to the Emergency Plan
IR 05000244/20104035 October 2010IR 05000244-10-403, on 08/23/2010 - 08/27/2010, R. E. Ginna Nuclear Power Plant, Protection of Safeguards Information. (Letter Only)Significance Determination Process
Affidavit
ML1026401441 October 2010Use of Risk-Informed Inservice Inspection Program for Class 1 and 2 Piping for the Fifth 10 Year Inservice Inspection Interval - R.E. Ginna Nuclear Power PlantInternal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
Incorporated by reference
Large early release frequency