Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML11285A236 | 27 December 2010 | Single Positive Test Form, for Random, Collected on 12/06/2010 | |
ML11285A235 | 27 December 2010 | Single Positive Test Form, for Followup, Collected on 11/11/2010 | |
ML11285A233 | 27 December 2010 | Single Positive Test Form, for Pre-Access, Collected on 10/28/2010 | |
ML11285A232 | 27 December 2010 | Single Positive Test Form, for Random, Collected on 10/26/2010 | |
TAC:ME6142 | 20 December 2010 | ||
ML103510599 | 16 December 2010 | IR 05000348-11-009, IR 05000364-11-009, Joseph M. Farley Nuclear Plant-Notifcation of Conduct of a Triennial Fire Protection Baseline Inspection White Transition to 10 CFR Part 50.48(c) Is in Progress | Safe Shutdown Fitness for Duty Fire Barrier Fire impairment Temporary Modification Severe Accident Management Guideline B.5.b Mitigating Strategies Fire Protection Program |
NL-10-2340, 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 2009 | 16 December 2010 | 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 2009 | |
NRC-2009-0375, Federal Register Notice - Environmental Assessment | 19 November 2010 | Federal Register Notice - Environmental Assessment | Exemption Request |
ML103130157 | 19 November 2010 | Environmental Assessment and Finding of No Significant Impact | Exemption Request |
TAC:ME4703 | 19 November 2010 | ||
ML103130187 | 19 November 2010 | Federal Register Notice - Environmental Assessment | Exemption Request |
IR 05000348/2010404 | 12 November 2010 | IR 05000348/2010404 and 05000364/2010404, September 24, 2010, Joseph M. Farley Nuclear Plant - Special Security Inspection | Significance Determination Process Affidavit |
ML103130423 | 8 November 2010 | Notification of Potential Part 21 from Curtiss Wright Flow Control Co., on UPS Motherboard Failed Pre-Service Inspection | |
NL-10-0688, Request for Extension of Enforcement Discretion and Revised Submittal Date for 10 CFR 50.48(c) License Amendment Request | 5 November 2010 | Request for Extension of Enforcement Discretion and Revised Submittal Date for 10 CFR 50.48(c) License Amendment Request | Safe Shutdown Enforcement Discretion Operator Manual Action Multiple Spurious Operation Fire Protection Program |
Press Release-II-10-073, NRC Names New Resident Inspector for Farley Nuclear Power Plant | 1 November 2010 | Press Release-II-10-073: NRC Names New Resident Inspector for Farley Nuclear Power Plant | New Resident Inspector |
IR 05000348/2010004 | 29 October 2010 | IR 05000348-10-004 & 05000364-10-004, 07/01/2010 - 09/30/2010, Joseph M. Farley Nuclear Plant, Units 1 and 2, Identification and Resolution of Problems, Event Followup | Fire Barrier Enforcement Discretion Temporary Modification Functionality Assessment Job Performance Measure Fuel cladding |
TAC:ME5055 | 29 October 2010 | ||
NL-10-0272, License Amendment Request for Adoption of TSTF-425-A, Revision 3, Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Using the Consolidated.. | 29 October 2010 | License Amendment Request for Adoption of TSTF-425-A, Revision 3, Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Using the Consolidated.. | Safe Shutdown High winds Shutdown Margin High Radiation Area Ultimate heat sink Mission time Stroke time Internal Flooding Hydrostatic Probabilistic Risk Assessment Incorporated by reference Surveillance Frequency Control Program Large early release frequency Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage |
ML11285A234 | 27 October 2010 | Single Positive Test Form, for Followup, Collected on 11/04/2010 | |
ML11285A227 | 25 October 2010 | Single Positive Test Form, for Cause, Collected on 10/04/2010 | |
ML11285A231 | 25 October 2010 | Single Positive Test Form, for Pre-Access, Collected on 10/18/2010 | |
ML11285A230 | 25 October 2010 | Single Positive Test Form, for Cause, Collected on 10/19/2010 | |
ML11285A229 | 25 October 2010 | Single Positive Test Form, for Pre-Access, Collected on 10/16/2010 | |
ML11285A225 | 25 October 2010 | Single Positive Test Form, for Cause, Collected on 10/01/2010 | |
ML11285A226 | 25 October 2010 | Single Positive Test Form, for Pre-Access, Collected on 10/04/2010 | |
ML11285A228 | 25 October 2010 | Single Positive Test Form, for Pre-Access, Collected on 09/28/2010 | |
ML11285A217 | 20 October 2010 | Single Positive Test Form, for Pre-Access, Collected on 10/15/2010 | |
ML11285A216 | 20 October 2010 | Single Positive Test Form, for Pre-Access, Collected on 10/18/2010 | |
ML11285A215 | 20 October 2010 | Single Positive Test Form, for Pre-Access, Collected on 10/12/2010 | |
ML11285A218 | 20 October 2010 | Single Positive Test Form, for Pre-Access, Collected on 09/28/2010 | |
ML11285A219 | 20 October 2010 | Single Positive Test Form, for Pre-Access, Collected on 09/28/2010 | |
ML11285A220 | 20 October 2010 | Single Positive Test Form, for Pre-Access, Collected on 10/04/2010 | |
ML11285A221 | 20 October 2010 | Single Positive Test Form, for Pre-Access, Collected on 10/04/2010 | |
ML11285A222 | 20 October 2010 | Single Positive Test Form, for Pre-Access, Collected on 10/04/2010 | |
ML11285A223 | 20 October 2010 | Single Positive Test Form, for Pre-Access, Collected on 10/07/2010 | |
ML11285A224 | 20 October 2010 | Single Positive Test Form, for Cause, Collected on 10/04/2010 | |
NL-10-1987, Emergency Plan, Revision 51 | 18 October 2010 | Emergency Plan, Revision 51 | Safe Shutdown Fitness for Duty Health Physics Network High winds Reactor Vessel Water Level High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Time to boil Internal Flooding Operating Basis Earthquake Emergency Lighting Severe Accident Management Guideline B.5.b Mitigating Strategies Earthquake Fuel cladding Pressure Boundary Leakage Minimum staff Fire Protection Program |