ML103560661 | 29 December 2010 | Summary of Beaver Valley Power Station, Unit 2 Public Conference Call Regarding Spent Fuel Pool Rerack LAR Draft RAI Responses Discussion | |
L-10-331, Response to Request for Additional Information Related to 10 CFR 50.55a Requests Associated with Service Water Pump Testing | 22 December 2010 | Response to Request for Additional Information Related to 10 CFR 50.55a Requests Associated with Service Water Pump Testing | |
ML103420138 | 22 December 2010 | Uniti 1, and Perry Nuclear Power Plant, Unit No. 1 - Request for the Use of Delta Protection Mururoa Blu Single-Use Respiratory Protection Suits | Mururoa |
L-10-346, Submittal of Discharge Monitoring Report Permit No. PA002561 5 | 21 December 2010 | Submittal of Discharge Monitoring Report Permit No. PA002561 5 | Grab sample |
ML103500490 | 17 December 2010 | RAI Regarding 2009 Steam Generator Tube Inspection Results (ME3998) | |
L-10-333, Units, 1 and 2, Response to Request for Additional Information Related to Risk-Informed Inservice Inspection Requests RI-ISI-1 and RI-ISI-2 | 14 December 2010 | Units, 1 and 2, Response to Request for Additional Information Related to Risk-Informed Inservice Inspection Requests RI-ISI-1 and RI-ISI-2 | Non-Destructive Examination Weld Overlay Probabilistic Risk Assessment Large early release frequency |
L-10-330, Discharge Monitoring Report (NPDES) Permit No. PA0025615 | 23 November 2010 | Discharge Monitoring Report (NPDES) Permit No. PA0025615 | Grab sample |
ML103190677 | 22 November 2010 | Request for Additional Information Service Water Pump Testing, Inservice Testing Program | |
ML103220360 | 19 November 2010 | Firstenergy Nuclear Operating Company (Fenco) Fleet - Project Manager Reassignment | |
L-10-301, Core Operating Limits Report, Cycle 21 | 10 November 2010 | Core Operating Limits Report, Cycle 21 | Shutdown Margin |
L-10-302, Supplemental Information for a Proposed 10 CFR 50.55a Request (VRR2) | 1 November 2010 | Supplemental Information for a Proposed 10 CFR 50.55a Request (VRR2) | Boric Acid |
ML103060102 | 29 October 2010 | Notification of Potential Part 21 Transfer of Information Concerning Control Components Inc. (CCI) Drag Valves | Boric Acid |
IR 05000334/2010004 | 27 October 2010 | IR 05000334-10-004, 05000412-10-004 on 07/31/10 - 09/30/10, Beaver Valley Power Station - Integrated Inspection Report | High winds Internal Flooding Enforcement Discretion Coatings Temporary Modification Functionality Assessment Significance Determination Process Annual Radioactive Effluent Release Report Process Control Program Operability Determination |
ML102980099 | 27 October 2010 | Request for Additional Information Regarding the Risk-Informed Inservice Inspection Program Relief Requests | Probabilistic Risk Assessment Nondestructive Examination Large early release frequency |
TAC:ME1052 | 27 October 2010 | ||
ML103010273 | 27 October 2010 | September 8, 2010 NRC Generic Fundamentals Examination (GFE) Results for Beaver Valley Power Station (05000334) (Cover Letter Publicly Available, Enclosures Withheld from Public), Dated October 27, 2010 | Generic Fundamentals Examination |
L-10-304, Discharge Monitoring Report (NPDES) Permit No. PA00025615 | 25 October 2010 | Discharge Monitoring Report (NPDES) Permit No. PA00025615 | Zebra Mussel |
ML102930182 | 21 October 2010 | Supplemental Information Needed for Acceptance of Requested Licensing Action Relief Request VRR2 | |
TAC:ME4363 | 21 October 2010 | ||
ML102790351 | 18 October 2010 | Summary of Meeting with Firstenergy Nuclear Operating Company, on the Request for Additional Resposnses Regarding the Spent Fuel Rerack for Beaver Valley Power Station, Unit No. 2 | |
L-10-275, License Amendment Request for Spent Fuel Pool Rerack | 18 October 2010 | License Amendment Request for Spent Fuel Pool Rerack | Time to boil B.5.b Earthquake Control of Heavy Loads Turbine Missile Fuel cladding Recently irradiated fuel Affidavit |
ML102940458 | 18 October 2010 | Holtec Report No: HI-2084175, Licensing Report for Beaver Valley, Unit 2, Rerack. | Boric Acid High Radiation Area Nondestructive Examination Control of Heavy Loads Fuel cladding Liquid penetrant |
L-10-282, Supplemental Response to Request for Additional Information Related to Spent Fuel Pool Rerack License Amendment Request | 7 October 2010 | Supplemental Response to Request for Additional Information Related to Spent Fuel Pool Rerack License Amendment Request | Time to boil |
ML102950178 | 1 October 2010 | FEMA - Submittal of Final Report for Radiological Emergency Preparedness Exercise for Beaver Valley Power Station, Held on August 10-11, 2010 | |
ML102740027 | 1 October 2010 | Request for Additional Information Regarding Revised Steam Generator Tube Inspection, F* Methodology License Amendment Request |