Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RNP-RA/08-0124, Response to Request for Additional Information NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors17 December 2008Response to Request for Additional Information NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water ReactorsHydrostatic
Coatings
ML08346018211 December 2008Notification Inspection and Request for Information
ML0834708368 December 2008Results of MRP-139 Inspections of the Reactor Vessel Nozzle Dissimilar Metal Butt Welds During Refueling Outage 25Stress corrosion cracking
Eddy Current Testing
Dissimilar Metal Weld
DM weld
RA-08-0116, Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System2 December 2008Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System
TAC:MD437219 November 2008
ML08319061319 November 2008Closeout of GL 2007-01 - Inaccessible or Underground Power Cable Failures
ML08317105212 November 2008E-mail Transmitting Approval for an Extension Request to the GL 2004-02 Supplemental RAI Response Deadline for the H.B. Robinson Steam Electric Plant
ML0831107056 November 2008September 10, 2008 Generic Fundamentals Examination Section LetterGeneric Fundamentals Examination
RNP-RA/08-0112, Transmittal of Core Operating Limits Report for Cycle 263 November 2008Transmittal of Core Operating Limits Report for Cycle 26Shutdown Margin
ML08308000331 October 2008Summary of Public Meeting with Carolina Power and Light and Florida Power Corporation Regarding Organizational Alignment within the CompanyLicense Renewal
ML08308000531 October 2008Meeting Slides, Progress Energy Public Meeting, NRC Region II VisitB.5.b
License Renewal
Dissimilar Metal Weld
Power change
Siren
Power Uprate
IR 05000261/200800424 October 2008IR 05000261-08-004 on 07/01/2008 - 09/30/2008 for H.B. Robinson, Unit 2High winds
Ultimate heat sink
Fire Barrier
Internal Flooding
Temporary Modification
Significance Determination Process
Operability Determination
ML08273027022 October 2008Request for Relief from ASME Code, Section XI, Appendix Viii, Supplement 2 and Supplement 10 Weld Examination RequirementsNondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
ML08303018122 October 2008Notification of Potential Part 21 on Power Supplies Manufactured with Unauthorized Capacitor Delivered to H. B. Robinson
ML08317029221 October 2008Submittal of 10 CFR Part 21 Reporting Form for Defect and Noncompliance
ML08274036020 October 2008Correction to RAI Response Date Regarding Request for Relief from ASME Code, Section XIMoisture barrier
RNP-RA/08-0110, Request for Additional Time for Response to RAI Pertaining to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors17 October 2008Request for Additional Time for Response to RAI Pertaining to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
RNP-RA/08-0099, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.14 October 2008Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.Past operability
ML08295048613 October 2008CFR 26 Unsatisfactory Fitness-For-Duty Program Blind Performance Testing Result
IR 05000261/20080079 October 2008IR 05000261-08-007, on 09/11/2008, H. B. Robinson Steam Electric Plant - Ti 2515/171 Verification of Site Specific Implementation of B.5.b Phase 2 and 3 Mitigating StrategiesB.5.b
IR 05000261/20083016 October 2008IR 05000261-08-301 on 08/18/08 - 08/21/08 and 08/26/08 for H.B. Robinson, Reactor and Senior Reactor Operator Initial ExaminationsJob Performance Measure
ML0828301376 October 2008License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26Safe Shutdown
Fitness for Duty
TAC:MD98166 October 2008
RNP-RA/08-0088, (Hbrsep), Unit No. 2, Response to Regulatory Issue Summary 2008-16, Preparation and Scheduling of Operator Licensing Examinations.4 October 2008(Hbrsep), Unit No. 2, Response to Regulatory Issue Summary 2008-16, Preparation and Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
TAC:MD74693 October 2008
ML0822105493 October 2008Issuance of Amendment Regarding Changes to the Technical Specifications Related to the Isolation Valve Seal Water System