RNP-RA/08-0124, Response to Request for Additional Information NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | 17 December 2008 | Response to Request for Additional Information NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | Hydrostatic Coatings |
ML083460182 | 11 December 2008 | Notification Inspection and Request for Information | |
ML083470836 | 8 December 2008 | Results of MRP-139 Inspections of the Reactor Vessel Nozzle Dissimilar Metal Butt Welds During Refueling Outage 25 | Stress corrosion cracking Eddy Current Testing Dissimilar Metal Weld DM weld |
RA-08-0116, Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System | 2 December 2008 | Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System | |
TAC:MD4372 | 19 November 2008 | ||
ML083190613 | 19 November 2008 | Closeout of GL 2007-01 - Inaccessible or Underground Power Cable Failures | |
ML083171052 | 12 November 2008 | E-mail Transmitting Approval for an Extension Request to the GL 2004-02 Supplemental RAI Response Deadline for the H.B. Robinson Steam Electric Plant | |
ML083110705 | 6 November 2008 | September 10, 2008 Generic Fundamentals Examination Section Letter | Generic Fundamentals Examination |
RNP-RA/08-0112, Transmittal of Core Operating Limits Report for Cycle 26 | 3 November 2008 | Transmittal of Core Operating Limits Report for Cycle 26 | Shutdown Margin |
ML083080003 | 31 October 2008 | Summary of Public Meeting with Carolina Power and Light and Florida Power Corporation Regarding Organizational Alignment within the Company | License Renewal |
ML083080005 | 31 October 2008 | Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit | B.5.b License Renewal Dissimilar Metal Weld Power change Siren Power Uprate |
IR 05000261/2008004 | 24 October 2008 | IR 05000261-08-004 on 07/01/2008 - 09/30/2008 for H.B. Robinson, Unit 2 | High winds Ultimate heat sink Fire Barrier Internal Flooding Temporary Modification Significance Determination Process Operability Determination |
ML082730270 | 22 October 2008 | Request for Relief from ASME Code, Section XI, Appendix Viii, Supplement 2 and Supplement 10 Weld Examination Requirements | Nondestructive Examination Incorporated by reference Dissimilar Metal Weld |
ML083030181 | 22 October 2008 | Notification of Potential Part 21 on Power Supplies Manufactured with Unauthorized Capacitor Delivered to H. B. Robinson | |
ML083170292 | 21 October 2008 | Submittal of 10 CFR Part 21 Reporting Form for Defect and Noncompliance | |
ML082740360 | 20 October 2008 | Correction to RAI Response Date Regarding Request for Relief from ASME Code, Section XI | Moisture barrier |
RNP-RA/08-0110, Request for Additional Time for Response to RAI Pertaining to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | 17 October 2008 | Request for Additional Time for Response to RAI Pertaining to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | |
RNP-RA/08-0099, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | 14 October 2008 | Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | Past operability |
ML082950486 | 13 October 2008 | CFR 26 Unsatisfactory Fitness-For-Duty Program Blind Performance Testing Result | |
IR 05000261/2008007 | 9 October 2008 | IR 05000261-08-007, on 09/11/2008, H. B. Robinson Steam Electric Plant - Ti 2515/171 Verification of Site Specific Implementation of B.5.b Phase 2 and 3 Mitigating Strategies | B.5.b |
IR 05000261/2008301 | 6 October 2008 | IR 05000261-08-301 on 08/18/08 - 08/21/08 and 08/26/08 for H.B. Robinson, Reactor and Senior Reactor Operator Initial Examinations | Job Performance Measure |
ML082830137 | 6 October 2008 | License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26 | Safe Shutdown Fitness for Duty |
TAC:MD9816 | 6 October 2008 | ||
RNP-RA/08-0088, (Hbrsep), Unit No. 2, Response to Regulatory Issue Summary 2008-16, Preparation and Scheduling of Operator Licensing Examinations. | 4 October 2008 | (Hbrsep), Unit No. 2, Response to Regulatory Issue Summary 2008-16, Preparation and Scheduling of Operator Licensing Examinations. | Generic Fundamentals Examination |
TAC:MD7469 | 3 October 2008 | ||
ML082210549 | 3 October 2008 | Issuance of Amendment Regarding Changes to the Technical Specifications Related to the Isolation Valve Seal Water System |