Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML091280431 | 31 December 2008 | Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
IR 05000352/2008010 | 29 December 2008 | IR 05000352-08-010, IR 05000353-08-010, on 11/03/2008 - 11/20/2008, Limerick Generating Station, Engineering Specialist Plant Modifications Report | |
ML083540196 | 15 December 2008 | Alliance for a Clean Environment Ltr 12-15-08, to Pg Krohn, Re Limerick Low-Level Radioactive Wastes | |
ML083520040 | 12 December 2008 | NRC Written Exam Changes - Resolutions for Licensee Comments on Draft Exam (Folder 2) | |
ML083640025 | 7 December 2008 | Alliance for a Clean Environment Ltr 12-07-08, to PA DEP, Re Limerick Title V Operating Permit Renewal | |
ML083190208 | 5 December 2008 | Final - Section B Operating Exam (Folder 3) | Reactor Vessel Water Level Job Performance Measure |
ML083400291 | 5 December 2008 | Annual Commitment Change Summary Report | Surveillance Frequency Control Program |
ML083310073 | 26 November 2008 | Summary of Meeting with Exelon to Review the Results of Security Organization Safety Conscious Work Environment (SCWE) Surveys at Exelon Nuclear Operating Reactors | |
ML091960300 | 24 November 2008 | Letter from Preservation Pa. Concerning the Preservation of Frick'S Lock Historic District | |
ML083300095 | 24 November 2008 | CFR 50.46 Annual Report | |
ML083330187 | 21 November 2008 | Notification of Potential Part 21 Re Tyco Electronics, Transfer of Information - CII-012 | |
ML082890184 | 14 November 2008 | Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. | |
IR 05000352/2008004 | 13 November 2008 | IR 05000352-08-004, 05000353-08-004; on 07/01/2008 - 09/30/2008; Limerick Generating Station, Units 1 and 2; Flood Protection Measures | Safe Shutdown High winds Ultimate heat sink Fire Barrier Internal Flooding Temporary Modification B.5.b Significance Determination Process Job Performance Measure Through Wall Leak |
RS-08-150, Annual Report - Guarantees of Payment of Deferred Premiums | 13 November 2008 | Annual Report - Guarantees of Payment of Deferred Premiums | |
ML082831463 | 12 November 2008 | Issuance of Amendments 196 & 157 Jet Pump Surveillance Changes | Safe Shutdown Surveillance Frequency Control Program Fire Protection Program |
ML083220002 | 10 November 2008 | NRC Operator Licensing Initial Exam Results, Limerick Generating Station, Units 1 & 2 (Cover Letter Publicly Available; Enclosures Withheld from Public) | |
ML083150595 | 10 November 2008 | Month 10CFR50.59 and 10CFR72.48 Evaluation Summary Report for the Period July 1, 2006 Through June 30, 2008 | Scram Discharge Volume Turbine Missile |
ML083110593 | 7 November 2008 | Notice of Closed Meeting to Exelon Generation Company for SCWE Survey Review | Inattentive |
Press Release-I-08-059, NRC Assigns New Resident Inspector to Limerick Nuclear Plant | 3 November 2008 | Press Release-I-08-059: NRC Assigns New Resident Inspector to Limerick Nuclear Plant | New Resident Inspector |
ML082750385 | 28 October 2008 | Issuance of Amendments 195 & 156 Extend Local Power Range Monitor Calibration Interval | Safe Shutdown High Radiation Area Anticipated operational occurrence Surveillance Frequency Control Program Minimum Critical Power Ratio Fuel cladding Fire Protection Program |
ML082750399 | 28 October 2008 | Request for Withholding Information from Public Disclosure Regarding Limerick Generating Station, Units 1 and 2 | |
IR 05000352/2008009 | 22 October 2008 | IR 05000352-08-009 and 05000353-08-009; on 08/25/2008 - 09/12/2008; Limerick Generating Station, Units 1 and 2; Identification and Resolution of Problems, One Finding Was Identified in the Area of Corrective Action Program Effectiveness | Operability Determination Turbine Missile |
ML090260031 | 20 October 2008 | Final Qa/Related Forms (Folder 1) | |
ML082910184 | 17 October 2008 | Initial Operator Licensing Examination Written Test Approval | |
ML083650196 | 15 October 2008 | Final Outlines (Folder 3) | |
ML082890027 | 14 October 2008 | (Limerick, Units 1 and 2, Initial Operator Licensing Examination Operating Test Approval | |
RS-08-131, General Company, LLC and Amergen Energy Company, LLC, Nine-Month Response to Generic Letter 2008-01 | 14 October 2008 | General Company, LLC and Amergen Energy Company, LLC, Nine-Month Response to Generic Letter 2008-01 | Surveillance Frequency Control Program Generic Issues Program GOTHIC |
ML083190217 | 6 October 2008 | Final - Section C Operating Exam (Folder 3) | Squib Power change |
IR 05000352/2008006 | 3 October 2008 | IR 05000352-08-006 and IR 05000353-08-006 and IR 07200065-08-001, on July 2, 2007 Through August 19, 2008, Limerick Generating Station Independent Spent Fuel Storage Installation Construction, Preoperations, and Initial Loading Campaign | Nondestructive Examination Significance Determination Process Process Control Program Control of Heavy Loads Liquid penetrant |