Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML09128043131 December 2008Annual Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
IR 05000352/200801029 December 2008IR 05000352-08-010, IR 05000353-08-010, on 11/03/2008 - 11/20/2008, Limerick Generating Station, Engineering Specialist Plant Modifications Report
ML08354019615 December 2008Alliance for a Clean Environment Ltr 12-15-08, to Pg Krohn, Re Limerick Low-Level Radioactive Wastes
ML08352004012 December 2008NRC Written Exam Changes - Resolutions for Licensee Comments on Draft Exam (Folder 2)
ML0836400257 December 2008Alliance for a Clean Environment Ltr 12-07-08, to PA DEP, Re Limerick Title V Operating Permit Renewal
ML0831902085 December 2008Final - Section B Operating Exam (Folder 3)Reactor Vessel Water Level
Job Performance Measure
ML0834002915 December 2008Annual Commitment Change Summary ReportSurveillance Frequency Control Program
ML08331007326 November 2008Summary of Meeting with Exelon to Review the Results of Security Organization Safety Conscious Work Environment (SCWE) Surveys at Exelon Nuclear Operating Reactors
ML09196030024 November 2008Letter from Preservation Pa. Concerning the Preservation of Frick'S Lock Historic District
ML08330009524 November 2008CFR 50.46 Annual Report
ML08333018721 November 2008Notification of Potential Part 21 Re Tyco Electronics, Transfer of Information - CII-012
ML08289018414 November 2008Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.
IR 05000352/200800413 November 2008IR 05000352-08-004, 05000353-08-004; on 07/01/2008 - 09/30/2008; Limerick Generating Station, Units 1 and 2; Flood Protection MeasuresSafe Shutdown
High winds
Ultimate heat sink
Fire Barrier
Internal Flooding
Temporary Modification
B.5.b
Significance Determination Process
Job Performance Measure
Through Wall Leak
RS-08-150, Annual Report - Guarantees of Payment of Deferred Premiums13 November 2008Annual Report - Guarantees of Payment of Deferred Premiums
ML08283146312 November 2008Issuance of Amendments 196 & 157 Jet Pump Surveillance ChangesSafe Shutdown
Surveillance Frequency Control Program
Fire Protection Program
ML08322000210 November 2008NRC Operator Licensing Initial Exam Results, Limerick Generating Station, Units 1 & 2 (Cover Letter Publicly Available; Enclosures Withheld from Public)
ML08315059510 November 2008Month 10CFR50.59 and 10CFR72.48 Evaluation Summary Report for the Period July 1, 2006 Through June 30, 2008Scram Discharge Volume
Turbine Missile
ML0831105937 November 2008Notice of Closed Meeting to Exelon Generation Company for SCWE Survey ReviewInattentive
Press Release-I-08-059, NRC Assigns New Resident Inspector to Limerick Nuclear Plant3 November 2008Press Release-I-08-059: NRC Assigns New Resident Inspector to Limerick Nuclear PlantNew Resident Inspector
ML08275038528 October 2008Issuance of Amendments 195 & 156 Extend Local Power Range Monitor Calibration IntervalSafe Shutdown
High Radiation Area
Anticipated operational occurrence
Surveillance Frequency Control Program
Minimum Critical Power Ratio
Fuel cladding
Fire Protection Program
ML08275039928 October 2008Request for Withholding Information from Public Disclosure Regarding Limerick Generating Station, Units 1 and 2
IR 05000352/200800922 October 2008IR 05000352-08-009 and 05000353-08-009; on 08/25/2008 - 09/12/2008; Limerick Generating Station, Units 1 and 2; Identification and Resolution of Problems, One Finding Was Identified in the Area of Corrective Action Program EffectivenessOperability Determination
Turbine Missile
ML09026003120 October 2008Final Qa/Related Forms (Folder 1)
ML08291018417 October 2008Initial Operator Licensing Examination Written Test Approval
ML08365019615 October 2008Final Outlines (Folder 3)
ML08289002714 October 2008(Limerick, Units 1 and 2, Initial Operator Licensing Examination Operating Test Approval
RS-08-131, General Company, LLC and Amergen Energy Company, LLC, Nine-Month Response to Generic Letter 2008-0114 October 2008General Company, LLC and Amergen Energy Company, LLC, Nine-Month Response to Generic Letter 2008-01Surveillance Frequency Control Program
Generic Issues Program
GOTHIC
ML0831902176 October 2008Final - Section C Operating Exam (Folder 3)Squib
Power change
IR 05000352/20080063 October 2008IR 05000352-08-006 and IR 05000353-08-006 and IR 07200065-08-001, on July 2, 2007 Through August 19, 2008, Limerick Generating Station Independent Spent Fuel Storage Installation Construction, Preoperations, and Initial Loading CampaignNondestructive Examination
Significance Determination Process
Process Control Program
Control of Heavy Loads
Liquid penetrant