Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML053420210 | 31 December 2002 | Annual Radiological Environmental Operating Report - 2002 | Annual Radiological Environmental Operating Report |
JAFP-02-0251, In-Vessel Visual Inspection Summary Report 2002 Refuel Outage (Reload 15/Cycle 16) | 26 December 2002 | In-Vessel Visual Inspection Summary Report 2002 Refuel Outage (Reload 15/Cycle 16) | VT-2 EVT-1 |
JAFP-02-0225, October 2002 Monthly Operating Report for FitzPatrick, Rev 1 | 12 December 2002 | October 2002 Monthly Operating Report for FitzPatrick, Rev 1 | |
JAFP-02-0226, November 2002 Monthly Operating Report for James A.Fitzpatrick Nuclear Power Plant | 12 December 2002 | November 2002 Monthly Operating Report for James A.Fitzpatrick Nuclear Power Plant | |
ML023460088 | 12 December 2002 | NRC Ltr Dated 12/12/02 Senior Reactor and Reactor Operator Initial Examinations - J.A. Fitzpatrick Nuclear Power Plant, Unit 1 | |
ML023500010 | 6 December 2002 | Proposed Change to TS Regarding Local Power Range Monitor Calibration Frequency (JPTS-02-002) | High Radiation Area |
ML023180496 | 14 November 2002 | Relief, Request for Relief No. RR-28 for the Third 10-Year Inservice Inspection Interval Program Plan for the FitzPatrick Power Plant | Non-Destructive Examination Weld Overlay Through Wall Leak |
IR 05000333/2002007 | 13 November 2002 | IR 05000333-02-007, on 06/30 - 09/30/2002, Entergy Nuclear Northeast; James A. FitzPatrick Nuclear Power Plant; Design Control, Radiological Area Access Control | High Radiation Area Nondestructive Examination Locked High Radiation Area Significance Determination Process Operability Determination Siren |
JAFP-02-0210, 10 CFR 50.46 Reporting of Changes in Emergency Core Cooling System (ECCS) Evaluation Model | 12 November 2002 | 10 CFR 50.46 Reporting of Changes in Emergency Core Cooling System (ECCS) Evaluation Model | |
JAFP-02-0211, October 2002 Monthly Operating Report for James A. FitzPatrick | 12 November 2002 | October 2002 Monthly Operating Report for James A. FitzPatrick | |
JAFP-02-0212, Proposed Revision of Relief Request No. VRR-04 to JAFNPP In-Service Testing Program | 12 November 2002 | Proposed Revision of Relief Request No. VRR-04 to JAFNPP In-Service Testing Program | |
ML023220316 | 6 November 2002 | Emergency Plan and Implementing Procedures | |
ML023190019 | 6 November 2002 | Emergency Plan and Implementing Procedures | |
ML023190015 | 6 November 2002 | Emergency Plan and Implementing Procedures | |
ML022870008 | 16 October 2002 | Enclosures 1 & 2, Order for Interim Safeguards & Compensatory Measures for Dry Independent Spent Fuel Storage Installation & Regulatory Issuance Summary 2002-12D | |
JAFP-02-0200, Core Operating Limits Report Revision 14 (Cycle 16) | 14 October 2002 | Core Operating Limits Report Revision 14 (Cycle 16) | |
JAFP-02-0199, September 2002 Monthly Operating Report for James A. FitzPatrick | 14 October 2002 | September 2002 Monthly Operating Report for James A. FitzPatrick | |
BVY 02-078, Proof of Financial Protection (10 CFR.140.15) and Guarantee Payment of Deferred Premiums (10 CFR 140.21) | 9 October 2002 | Proof of Financial Protection (10 CFR.140.15) and Guarantee Payment of Deferred Premiums (10 CFR 140.21) | |
JAFP-02-0195, Letter Regards 10 CFR Part 21 Notification EC-1 Overcurrent Sensors Failed Prematurely | 2 October 2002 | Letter Regards 10 CFR Part 21 Notification EC-1 Overcurrent Sensors Failed Prematurely |