Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML05342021031 December 2002Annual Radiological Environmental Operating Report - 2002Annual Radiological Environmental Operating Report
JAFP-02-0251, In-Vessel Visual Inspection Summary Report 2002 Refuel Outage (Reload 15/Cycle 16)26 December 2002In-Vessel Visual Inspection Summary Report 2002 Refuel Outage (Reload 15/Cycle 16)VT-2
EVT-1
JAFP-02-0225, October 2002 Monthly Operating Report for FitzPatrick, Rev 112 December 2002October 2002 Monthly Operating Report for FitzPatrick, Rev 1
JAFP-02-0226, November 2002 Monthly Operating Report for James A.Fitzpatrick Nuclear Power Plant12 December 2002November 2002 Monthly Operating Report for James A.Fitzpatrick Nuclear Power Plant
ML02346008812 December 2002NRC Ltr Dated 12/12/02 Senior Reactor and Reactor Operator Initial Examinations - J.A. Fitzpatrick Nuclear Power Plant, Unit 1
ML0235000106 December 2002Proposed Change to TS Regarding Local Power Range Monitor Calibration Frequency (JPTS-02-002)High Radiation Area
ML02318049614 November 2002Relief, Request for Relief No. RR-28 for the Third 10-Year Inservice Inspection Interval Program Plan for the FitzPatrick Power PlantNon-Destructive Examination
Weld Overlay
Through Wall Leak
IR 05000333/200200713 November 2002IR 05000333-02-007, on 06/30 - 09/30/2002, Entergy Nuclear Northeast; James A. FitzPatrick Nuclear Power Plant; Design Control, Radiological Area Access ControlHigh Radiation Area
Nondestructive Examination
Locked High Radiation Area
Significance Determination Process
Operability Determination
Siren
JAFP-02-0210, 10 CFR 50.46 Reporting of Changes in Emergency Core Cooling System (ECCS) Evaluation Model12 November 200210 CFR 50.46 Reporting of Changes in Emergency Core Cooling System (ECCS) Evaluation Model
JAFP-02-0211, October 2002 Monthly Operating Report for James A. FitzPatrick12 November 2002October 2002 Monthly Operating Report for James A. FitzPatrick
JAFP-02-0212, Proposed Revision of Relief Request No. VRR-04 to JAFNPP In-Service Testing Program12 November 2002Proposed Revision of Relief Request No. VRR-04 to JAFNPP In-Service Testing Program
ML0232203166 November 2002Emergency Plan and Implementing Procedures
ML0231900196 November 2002Emergency Plan and Implementing Procedures
ML0231900156 November 2002Emergency Plan and Implementing Procedures
ML02287000816 October 2002Enclosures 1 & 2, Order for Interim Safeguards & Compensatory Measures for Dry Independent Spent Fuel Storage Installation & Regulatory Issuance Summary 2002-12D
JAFP-02-0200, Core Operating Limits Report Revision 14 (Cycle 16)14 October 2002Core Operating Limits Report Revision 14 (Cycle 16)
JAFP-02-0199, September 2002 Monthly Operating Report for James A. FitzPatrick14 October 2002September 2002 Monthly Operating Report for James A. FitzPatrick
BVY 02-078, Proof of Financial Protection (10 CFR.140.15) and Guarantee Payment of Deferred Premiums (10 CFR 140.21)9 October 2002Proof of Financial Protection (10 CFR.140.15) and Guarantee Payment of Deferred Premiums (10 CFR 140.21)
JAFP-02-0195, Letter Regards 10 CFR Part 21 Notification EC-1 Overcurrent Sensors Failed Prematurely2 October 2002Letter Regards 10 CFR Part 21 Notification EC-1 Overcurrent Sensors Failed Prematurely