ML023460088

From kanterella
Jump to navigation Jump to search
NRC Ltr Dated 12/12/02 Senior Reactor and Reactor Operator Initial Examinations - J.A. Fitzpatrick Nuclear Power Plant, Unit 1
ML023460088
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/12/2002
From: Conte R
NRC Region 1
To: Ted Sullivan
Entergy Nuclear Northeast
Shared Package
ML023310183 List:
References
Download: ML023460088 (4)


Text

December 12, 2002 Mr. Theodore Sullivan Vice President - Operations Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant Post Office Box 110 Lycoming, NY 13093

SUBJECT:

SENIOR REACTOR AND REACTOR OPERATOR INITIAL EXAMINATIONS -

J.A. FITZPATRICK NUCLEAR POWER PLANT, UNIT 1

Dear Mr. Sullivan:

In telephone conversations on December 3, 2002, between Herb Williams, Examiner/Inspector, and Mr. Steve Reininghaus, Operations Training Supervisor, arrangements were made for the administration of licensing examinations at FitzPatrick, during the week of July 21, 2003.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 8 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by May 12, 2003. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 will be due by June 6,2003. Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval.

All materials should be complete and ready-to-use. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first

Mr. Theodore Sullivan 2 examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on April 30, 2003. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33),

U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Reininghaus has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Herb Williams at either (610) 337-6967 or (717) 335-3293, or me at (610) 337-5183.

Sincerely,

/RA/

Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 50-333 License No. DPR-59

Mr. Theodore Sullivan 3 cc w/encl:

J. Yelverton, CEO, Entergy Operations B. OGrady, General Manager, Entergy Nuclear Operations J. Knubel, VP Operations Support H. Salmon, Director of Oversight A. Halliday, Licensing Manager M. Kansler, Chief Operating Officer, Entergy D. Pace, VP Engineering P. Berry, Training Manager J. Fulton, Assistant General Counsel Supervisor, Town of Scriba J. Tierney, Oswego County Administrator C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law P. Eddy, Electric Division, Department of Public Service, State of New York W. Flynn, President, New York State Energy Research and Development Authority S. Lousteau, Treasury Department T. Judson, Central New York Citizens Awareness Network

Mr. Theodore Sullivan 4 Distribution w/encl: (VIA E-MAIL)

Region I Docket Room (with concurrences)

L. Cline, DRP - NRC Senior Resident Inspector D. Dempsey, Resident Inspector H. Miller, RA J. Wiggins, DRA G. Meyer, DRP S. Barber, DRP H. Nieh, EDO Coordinator R. Laufer, NRR J. Andersen, NRR G. Vissing, PM, NRR R. Clark, Backup PM, NRR T. Frye, NRR C. See, NRR W. Lanning, DRS R. Crlenjak, DRS J. Williams, DRS, Chief Examiner C. Buracker, DRS (OL Facility File)

R. Conte, DRS DRS File DOCUMENT NAME:C:\ORPCheckout\FileNET\ML023460088.wpd ADAMS PKG: ML02331183 After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CBuracker JWilliams RConte DATE 12/04/02 12/03/02 12/11/02 12/ /02 12/ /02 OFFICIAL RECORD COPY